submitted | available | document details (if available) | source link |
---|---|---|---|
April 30 2018 | October 27 2018 |
various | Installers Guide | Users Manual | 1.27 MiB | April 30 2018 / October 27 2018 |
310 5G CPE Indoor Installation Manual Describes the product installation and requirement procedure. Document Version 2.0 June 2018 Document Number: N/A ork etw dio Access N a R 2018 SAMSUNG Electronics Co., Ltd. All Rights Reserved. No part of this document may be photocopied, reproduced, stored in a retrieval system, or transmitted, in any form or by any means whether, electronic, mechanical, or otherwise without the prior written permission of SAMSUNG Electronics Co., Ltd. No warranty of accuracy is given concerning the contents of the information contained in this publication. To the extent permitted by law no liability (including liability to any person by reason of negligence) will be accepted by SAMSUNG Electronics Co., Ltd., its subsidiaries or employees for any direct or indirect loss or damage caused by omissions from or inaccuracies in this document. SAMSUNG Electronics Co., Ltd. reserves the right to change details in this publication without notice. This manual should be read and used as a guideline for properly installing and/or operating the product. This manual may be changed for system improvement, standardization and other technical reasons without prior notice. Updated manuals are available at:
https://systems.samsungwireless.com/
For questions on the manuals or their content, contact NetSys Tech Writer@sea.samsung.com Contents Confidential Preface Chapter 1 Chapter 2 Chapter 3 vi Conventions in this Document ........................................................................................................ vi New and Changed Information ...................................................................................................... vii Revision History .............................................................................................................................. vii Organization of This Document ..................................................................................................... vii Related Documentation ................................................................................................................. vii Personal and Product Safety .......................................................................................................... viii Equipment Markings ....................................................................................................................... ix 1 Before Installation System View and Interface ............................................................................................................... 1 Indoor CPE View ........................................................................................................................... 1 Indoor CPE External Interface ...................................................................................................... 2 Indoor CPE Power Cord and Power Supply .................................................................................. 2 Specifications ................................................................................................................................... 4 Cautions for Installation ................................................................................................................... 5 Before Installing ........................................................................................................................... 5 While Installing ............................................................................................................................ 5 After Installing ............................................................................................................................. 5 Installation Tools .............................................................................................................................. 6 7 Installing System Installation Procedure ...................................................................................................................... 7 Transporting and Unpacking ............................................................................................................ 8 Bringing in Items .......................................................................................................................... 8 Unpacking Items .......................................................................................................................... 8 In the Box ..................................................................................................................................... 8 Indoor CPE Installation ..................................................................................................................... 9 Fixing CPE on Window Frame ...................................................................................................... 9 Indoor CPE Installation Material .................................................................................................. 9 15 Inspection Plan........................................................................................................................... 15 On-site Inspection and Inspection Checklist ............................................................................... 16 Sharing Inspection Results and Taking Corrective Actions ........................................................ 16 Checking the Results of Corrective Actions ................................................................................ 16 Sharing the Results of Corrective Actions and Preparing Preventive Plan ................................. 16 Construction Situation Checklist ................................................................................................ 16 19 Inspect the Installation Appendix A Acronyms 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. iii List of Figures Confidential Figure 1. Figure 2. Figure 3. Figure 4. Figure 5. Figure 6. Figure 7. Figure 8. Figure 9. Figure 10. Figure 11. Figure 12. Figure 13. Figure 14. CPE DU External Interface ................................................................................................................ 2 Power Cord and Power Supply ......................................................................................................... 2 Procedure to Install the Indoor CPE ................................................................................................. 7 Indoor CPE Package Contents .......................................................................................................... 8 Indoor CPE Window Frame Installation Step 1 .............................................................................. 10 Indoor CPE Window Frame Installation Step 2 .............................................................................. 10 Indoor CPE Window Frame Installation Step 3 .............................................................................. 11 Indoor CPE Window Frame Installation Step 4 .............................................................................. 11 Indoor CPE Window Frame Installation step 5 .............................................................................. 12 Indoor CPE Window Frame Installation step 6 .............................................................................. 12 Indoor CPE Interface Overview ...................................................................................................... 13 LED Information ............................................................................................................................. 14 Installation Inspection Procedure .................................................................................................. 15 Troubleshooting Steps ................................................................................................................... 18 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. iv List of Tables Confidential Table 1. Table 2. Table 3. Table 4. Table 5. 5G Indoor CPE Power Cord and Power Supply Specifications .......................................................... 3 5G Indoor CPE Key Specifications .................................................................................................... 4 Basic Installation Tools ..................................................................................................................... 6 Requirement to Fix Indoor CPE on Window Frame ....................................................................... 12 Construction Situation Checklist .................................................................................................... 16 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. v Preface Confidential This manual describes how to install the ICL Indoor CPE (Model: SFG-D0100) on a window frame bracket including how to connect cables. Conventions in this Document Samsung Networks product documentation uses the following conventions. Symbols Symbol Description Indicates a task. Indicates a shortcut or an alternative method. Provides additional information. Provides information or instructions that you should follow to avoid service failure or damage to equipment. Provides information or instructions that you should follow to avoid personal injury or fatality. Provides antistatic precautions that you should observe. Menu Commands menu | command This indicates that you must select a command on a menu, where menu is the name of the menu, and command is the name of the command on that menu. File Names and Paths These are indicated by a bold typeface. For example:
Copy filename.txt into the /home/folder1/folder2/bin/ folder. User Input and Console Screen Output Text Input and output text is presented in the Courier font. For example, context <designated epc-context-name>
CLI commands are presented in bold small caps. For example, Type the RTRV-NE-STS command in the input field. 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. vi New and Changed Information Confidential Preface This section describes information that has been added/ changed since the previous publication of this manual. Revision History The following table lists all versions of this document. Document Number N/A N/A Product/Software Version Indoor ICL 5G CPE Indoor ICL 5G CPE Document Version 1.0 2.0 Publication Date Remarks April 2018 June 2018 First version 2nd version Organization of This Document Section Chapter 1 Chapter 2 Chapter 3 Chapter 4 Appendix A Appendix B Title Before Installation This chapter introduces Indoor 5G CPE description that items Description Connecting Cables Installing System Inspect the Installation Acronyms Standard Torque should be understood before installation. This chapter describes the procedures to connect the cables to the Indoor 5G CPE This chapter describes the procedures to install the Indoor CPE This chapter describes the procedures of inspecting installation status after Indoor 5G CPE installation and cabling is completed. Describes the acronyms used in this manual. This annex describes the standard torque when tightening the bolt. Related Documentation 5G Indoor ICL CPE System Description 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. vii Personal and Product Safety Confidential Preface This product safety information includes European directives, which you must follow. If these do not apply in your country, please follow similar directives that do apply in your country. Proposition 65 (US Only) State of California Proposition 65 Warning (US only) WARNING: This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. Electrical All structural parts are grounded and all input and outputs have built-in isolation from the network. All input and output ports that connect to external power sources are designed to meet relevant national safety requirements. The product contains hazardous energy levels as defined by UL 60950. Care must be taken when maintaining this equipment as injury to personnel or damage to the equipment could result from mistakes. Maintenance should only be carried out by trained and competent engineers who are familiar with the relevant procedures and instructions. Manual Handling Care should be taken when handling equipment. Give due consideration to the weight of the equipment, the physical capability of the individual(s) handling the equipment, and movements such as twisting, bending and stooping, which could lead to skeletal and muscular injuries. Installation Installation is recommended to be carried out by trained personnel. All relevant safety measures should be taken to ensure equipment is not connected to live power and transmission sources during installation. Equipment must be correctly installed in order to meet the relevant safety standards and approval conditions. Maintenance Maintenance must only be carried out by a suitably trained and competent technician. All safety instructions must be carefully observed at all times. Equipment covers should not be removed while live power and transmission is connected unless in a controlled environment by trained technicians. 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. viii Fire Confidential Preface The product is powered from an AC supply. To protect against fire, the equipment is fused. Environment The product must be operated in an environment with the specified relative humidity and ambient temperature ranges. Keep all liquids away from the equipment as accidental spillage can cause severe damage. Anti-Static Precautions The circuit boards and other modules in the product are sensitive to and easily damaged by static electricity. If any card or sub-assembly is removed from the unit, the following anti-static precautions must be observed at all times:
Service personnel must wear anti-static wrist straps. Circuit boards and sub-assemblies must be placed on ground conductive mats or in conductive bags. All tools must be discharged to ground before use. The anti-static wrist strap and cord must be checked at regular intervals for their suitability for use. Equipment Markings Correct disposal of batteries in this product
(Applicable in countries with separate collection systems.) The marking on the battery, manual or packaging indicates that the battery in this product should not be disposed of with other household waste. Where marked, the chemical symbols Hg, Cd or Pb indicate that the battery contains mercury, cadmium or lead above the reference levels in EC Directive 2006/66. The battery incorporated in this product is not user replaceable. For information on its replacement, please contact your service provider. Do not attempt to remove the battery or dispose it in a fire. Do not disassemble, crush, or puncture the battery. If you intend to discard the product, the waste collection site will take the appropriate measures for the recycling and treatment of the product, including the battery. 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. ix Chapter 1 Before Installation System View and Interface Indoor CPE View The view of the Indoor CPE is as follows. 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 1 Indoor CPE External Interface The external interface structure of the Indoor CPE is as follows. Figure 1. CPE DU External Interface LED(Power) LED(Signal) LED(Connection) LED(Alarm) Factory Reset nSIM USB POWER LAN Confidential Indoor CPE Power Cord and Power Supply The following figure shows the connectivity of the power cord and power supply. Figure 2. Power Cord and Power Supply 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 2 Confidential Table 1. 5G Indoor CPE Power Cord and Power Supply Specifications Item Power Cord Power Supply Length Color Input Voltage Output Voltage Operating Temperature Operating Humidity Specification 1.8 meters Black AC100~240 VAC @ 50/60 Hz 12 VDC ( 5 %) 0~50C 5~90 %
5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 3 Specifications Key Specifications The following table shows the key specifications of the Indoor CPE. Table 2. 5G Indoor CPE Key Specifications Confidential Item Technology Operating Frequency Channel Bandwidth Operating Bandwidth Antenna Configuration RF Output Power Ethernet USB USIM LED Factory Reset Operational Temperature Humidity IP rating EMC FCC Installation Warranty Volume Weight Power Supply (selective) Power Consumption Specifications 5G (Follows Verizon 5GTF's latest version) 27.5 GHz ~ 28.35 GHz 100 MHz 100 MHz x 8 Carrier Integrated Antenna Data Channel: 2Tx/2Rx RF chain per Data Channel: 32 36dBm/Path (EIRP, Antenna Gain: 19dBi ) Indoor : RJ45 1 Port(100Base-TX or 1000Base-T) USB 2.0 1 Port Nano-SIM 1 Port Replaceable regular SIM Total: 4EA Power: Green LED Signal: 3 Colors (Green/Yellow/Red) Connection: 3 Colors (Green/Yellow/Red) Alarm: 3 Colors (Green/Yellow/Red) 1EA (Push Button Switch) 5 ~ 45 5% ~ 90%, non-condensing, not to exceed 30g/m^3 absolute humidity IP20 FCC Part 15 Subpart B FCC Part 30 (5G RF) Indoor: CPE Stand Warranty: 1 Year Indoor: < 1.5L (main Frame, exclude stand) Indoor: < 1.2 kg (main frame) AC 100~240 VAC @ 50/60 Hz with External Adapter Indoor: < 20W (Typical) 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 4 Cautions for Installation Observe the following safety instructions when installing the system. Before Installing Confidential The system must be installed close to a window or wall to face a guided direction to a 5G signal. The location of the CPE allows at least 20 cm (about 8 inches) between the unit and persons to be compliance with FCC RF exposure guidelines. The location of the CPE is 10 feet away from the products that generate electromagnetic radiation (e.g. microwave oven). It is recommended that the product installation to be performed by a competent and trained professional. While Installing The system power must be cut off before installing. Be careful not to damage or scratch the system and the cables among the boards when the system is transported or installed. Make sure the power switch for the power supply is off when installing the system. Installing the system with the power switch on may cause system damage or fatal human injury when cables are not correctly connected. Do not wear accessories such as watches and rings in order to prevent electrical shock. After Installing Remove any debris produced during the work and clean up the installation site. Make sure the worker does not damage the installed cables while cleaning the system. While cleaning the power supply device, take caution that the device does not come in contact with foreign objects that may cause power failure. 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 5 Installation Tools Confidential The basic tools for installation are listed in the table below. The additional tools required for each site need to be identified and prepared during a site survey before starting installation. Table 3. Basic Installation Tools No. Name 1 Specification Basic tool Remarks Electric Screwdriver 2 Window Bracket Bracket attached to window frame on which CPE is firmly placed 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 6 Chapter 2 Installing System This chapter describes the procedures to install the system. Installation Procedure The procedure to install the RFA is as follows. Figure 3. Procedure to Install the Indoor CPE Fixing CPE on window bracket Fixing indoor CPE on window bracket Plug in the Power to CPE Ethernet cable into LAN port of CPE Power Up the indoor CPE 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 7 Transporting and Unpacking Confidential This section describes the work to unpack cabinets and other components and transport them to the location to be installed. Bringing in Items Bring in items, taking care of the following:
When carrying the system, tighten the system firmly: do not exceed the proper vibration level from 1 to 500 Hz. While moving the system, the system should not be shocked physically or damaged caused by dust, moisture, and static electricity. Unpacking Items The procedure to unpack items is as follows:
The packing items must be packed until they reach the installation place. The items are classified in accordance with each job specification and stored on a place that does not interfere with working. Unpack only external packing, leaving the internal packing in unpacked status. Unpack the inner packaging after each system is placed on its installation location. Scrap by-products (packaging waste) in accordance with the rule. Do not recycle the by-products. In the Box Figure 4. Indoor CPE Package Contents 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 8 Indoor CPE Installation Confidential This section describes the procedures to fix the indoor CPE on the window frame bracket. The Indoor CPE bottom shows the proper orientation of the CPE side facing outside the window. Make sure to check the correct orientation while installing. The Indoor CPE must be fixed vertically as depicted in the following guidelines. Fixing CPE on Window Frame For the installation directions and fixing method, see the following process. The indoor CPE installation on a window frame bracket is to install the CPE with good RSRP measurement conducted as a pre-qualification with Spectrum analyzer. To install the CPE on a window frame:
1 Locate the CPE fixing point on the window frame and make sure the surface is free of dust and debris. 2 Attach the CPE window bracket on the window frame as depicted in the figures below. 3 Make sure to check the direction mark at the bottom of the CPE stand as shown in the figure below. 4 Make sure the CPE is firmly positioned on the window frame bracket. Indoor CPE Installation Material Indoor CPE installation material requires the following items in order to fix the indoor CPE on the window frame. Category Parts Parts Parts Description Indoor CPE Stand Holder Indoor CPE Window mounting bracket M4 screws 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 1 EA 1 EA 4 EA 9 Figure 5. Indoor CPE Window Frame Installation Step 1 Figure 6. Indoor CPE Window Frame Installation Step 2 Confidential 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 10 Figure 7. Indoor CPE Window Frame Installation Step 3 Figure 8. Indoor CPE Window Frame Installation Step 4 Confidential 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 11 Figure 9. Indoor CPE Window Frame Installation step 5 Figure 10. Indoor CPE Window Frame Installation step 6 Confidential Table 4. Requirement to Fix Indoor CPE on Window Frame Category Parts Parts Parts Description Indoor CPE Indoor CPE Stand Holder Indoor CPE Window Bracket 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 1 EA 1 EA 1 EA 12 Category Parts Parts Parts Description Command damage free hanging [attach Kwik Klip to wall/glass]
Kwik Klips 3/4" 19mm [Cable dressing]
M4 Screws 5G Indoor CPE Interface Overview The following figure shows the 5G indoor CPE interface. Figure 11. Indoor CPE Interface Overview Confidential As needed As needed 4 EA 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 13 5G Indoor CPE Connecting Cables To connect cables:
Confidential 1 Plug one end of the provided Ethernet cable into the available LAN port on the indoor CPE. Once the CPE is in service, connect the other end of the Ethernet cable into the wireless router. 2 Plug the AC/DC adapter connector into the DC 12V power port located on the indoor CPE. 3 Insert one end of the power cord into the AC/DC adapter and then plug the other end into an available outlet. 5G Indoor CPE LED Information Figure 12. LED Information 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 14 Chapter 3 Inspect the Installation The procedure to check the installation status is as follows. Figure 13. Installation Inspection Procedure Inspection Plan On-site Inspection Inspection Checklist Sharing Inspection Results Inspection Checklist/Corrective Actions Taking Corrective Actions Checking the Results of Corrective Actions NO YES Sharing the Results of Corrective Actions and Preparing Preventive Plan Inspection Plan Create an inspection sheet per system and select an inspector to set an inspection schedule per site. 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 15 On-site Inspection and Inspection Checklist Confidential The on-site inspection is to perform inspection visually or using instruments for each specification, standard, and installation status, and others based on the inspection checklist actually at a site where the system is installed. The inspector must record the results onto the inspection checklist during or after filed inspection. Sharing Inspection Results and Taking Corrective Actions The inspector must share the inspection results (inspection checklist/corrective actions) with an installation operator and, the installation operator must take the corrective actions if necessary after reviewing the requirements. Checking the Results of Corrective Actions The inspector must check if the corrective actions are properly taken. If they are not sufficient, the inspector must ask the installation operator to take the corrective actions again Sharing the Results of Corrective Actions and Preparing Preventive Plan After the corrective actions are all completed, the inspector must share the results with the installation operator and relevant departments and prepare a preventive plan to prevent the same or similar problems from re-occurring. Construction Situation Checklist Table 5. Construction Situation Checklist Category Check Items Criteria Installing Equipment Appearance of equipment and mechanical parts Placement of equipment and mechanical parts Leveling condition of equipment and mechanical parts Validity of status and specifications of tightening bolt/nut/washer, others. Insulation status Equipment damage such as Dent, scratch and crack, and so on. Maintenance and horizontal/vertical placement Horizontal/vertical status Checking fasteners omission Compliance with assembly order of fasteners Compliance with tightening torque value Checking electrical contact between insulators (insulation resistance tester) Result Pass Fail 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 16 Category Check Items Criteria Power Installation status of power supply Installation of circuit breaker Cable specification Cabling Cable binding status Cable connection Installation status of cable tag Other data cables Cable specification Cabling Cable binding status Cable connection Installation status of cable tag Others Reserved ports Power supply capacity Output voltage (tester) Checking circuit breaker capacity Checking the specification Checking the limit distance Cable damage Proper installation route Compliance with the radius of curvature Binding status Binding interval Checking binding materials Checking cable connection (Pin Map) Input voltage Assembly condition of a pressure terminal and connector Tightening condition of a pressure terminal and connector Checking compliance with tightening torque value Position Marking content Checking tag installation method Checking the specification Cable damage Proper installation route Compliance with the radius of curvature Binding status Binding interval Checking binding materials Checking cable connection (Pin Map) Assembly condition of a connector Tightening condition of a connector Checking compliance with tightening torque value Position Marking content Checking tag installation method Checking port cap tightening status Indoor: Dust cap Outdoor: Water proof cap Confidential Result Pass Fail 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 17 Category Check Items Criteria Cable inlet status/Connection of equipment I/O port Cable tray and duct Status of inside/outside of the equipment and system surrounding area Opinion Figure 14. Troubleshooting Steps Checking tightening status
(Conduit/Cable Gland) Checking installation status Checking the stocking condition (waste parts, waste materials, packing materials, others) Result Pass Confidential Fail 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 18 Appendix A Acronyms AC AP CPE DC DU LTE MIMO Wi-Fi Admission Control Access Point Customer Premises Equipment Direct Current Digital Unit Long Term Evolution Multiple Input Multiple Output Wireless Fidelity 5G Indoor CPE Installation Manual Copyright 2018, All Rights Reserved. 19 310 5G CPE Indoor Installation Manual Document Version 2.0 2018 Samsung Electronics Co., Ltd. All rights reserved.
This product uses the FCC Data API but is not endorsed or certified by the FCC