FCC ID: HEDOAP101 Outdoor Access Point

by: Accton Technology Corp latest update: 2023-10-20 model: OAP101

Two grants have been issued under this FCC ID on 10/20/2023 (this is one of seven releases in 2023 for this grantee). Public details available include manuals, internal & external photos, and frequency information. some products also feature user submitted or linked instructions, troubleshooting guides, warrantee terms, drivers, & password defaults.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 User Manual Users Manual pdf 990.50 KiB October 13 2023 / April 17 2024 delayed release
1 2 Internal Photos Internal Photos pdf 4.64 MiB October 13 2023 / April 17 2024 delayed release
1 2 External Photos External Photos pdf 1.44 MiB October 13 2023 / April 17 2024 delayed release
1 2 Label and Location ID Label/Location Info pdf 210.16 KiB October 13 2023 / October 20 2023
1 2 Attestation Statement part 2.911(d)(7) Attestation Statements pdf 523.44 KiB October 13 2023 / October 20 2023
1 2 Attstn Stmt Part 2.911(d)(5)(i)&(ii) Attestation Statements pdf 516.42 KiB October 13 2023 / October 20 2023
1 2 Block Diagrams Block Diagram pdf October 13 2023 confidential
1 2 Confidentiality Letter Cover Letter(s) pdf 553.12 KiB October 17 2023 / October 20 2023
1 2 Op Desc Software Security SDR Software/Security Inf pdf October 13 2023 confidential
1 2 Operational Description Operational Description pdf October 13 2023 confidential
1 2 Power of Attorney Letter Cover Letter(s) pdf 489.48 KiB October 13 2023 / October 20 2023
1 2 Professional Installation Dec Letter Cover Letter(s) pdf 515.94 KiB October 13 2023 / October 20 2023
1 2 RF Exposure MPE RF Exposure Info pdf 443.43 KiB October 13 2023 / October 20 2023
1 2 Schematics Schematics pdf October 13 2023 confidential
1 2 TPC Declaration Letter Cover Letter(s) pdf 515.57 KiB October 13 2023 / October 20 2023
1 2 TR Antenna EUT1 Internal Test Report pdf 1.01 MiB October 18 2023 / October 20 2023
1 2 TR Antenna EUT2 External Test Report pdf 1.36 MiB October 18 2023 / October 20 2023
1 2 TR Antenna EUT2 Internal Test Report pdf 828.22 KiB October 18 2023 / October 20 2023
1 2 TSUP 5G UNII 1-3 Test Setup Photos pdf 687.30 KiB October 13 2023 / April 17 2024 delayed release
1 2 TSUP Antenna EUT1 Internal Test Setup Photos pdf 1.22 MiB October 18 2023 / April 17 2024 delayed release
1 2 TSUP Antenna EUT2 External Test Setup Photos pdf 312.90 KiB October 18 2023 / April 17 2024 delayed release
1 2 TSUP Antenna EUT2 Internal Test Setup Photos pdf 868.14 KiB October 18 2023 / April 17 2024 delayed release
1 2 TSUP BT5.0 Test Setup Photos pdf October 13 2023 / April 17 2024 delayed release
1 2 TSUP DFS Test Setup Photos pdf 153.34 KiB October 13 2023 / April 17 2024 delayed release
1 2 Test Report pdf October 13 2023 / October 20 2023
1 2 Test Report 5G UNII 1-3 Part 1 Test Report pdf 5.37 MiB October 13 2023 / October 20 2023
1 2 Test Report 5G UNII 1-3 Part 2 Test Report pdf 5.38 MiB October 13 2023 / October 20 2023
1 2 Test Report 5G UNII 1-3 Part 3 Test Report pdf 1.55 MiB October 13 2023 / October 20 2023
1 2 Test Report pdf October 13 2023 / October 20 2023
1 2 Test Report pdf October 13 2023 / October 20 2023
1 2 Test Report BT 5.0 Test Report pdf 1.18 MiB October 20 2023
1 2 Test Report DFS Test Report pdf 1.89 MiB October 13 2023 / October 20 2023
1 2 Block Diagram Block Diagram pdf October 13 2023 confidential
1 2 Cover Letter(s) pdf October 13 2023 / October 20 2023
1 2 TSUP 2.4G Test Setup Photos pdf 399.14 KiB October 13 2023 / April 17 2024 delayed release
1 2 Test Report 2.4G Test Report pdf 2.98 MiB October 13 2023 / October 20 2023
1 2 Test Setup Photos BT 5.0 Test Setup Photos pdf 515.84 KiB October 20 2023 / April 17 2024 delayed release
1 2 User Manual Users Manual pdf 990.50 KiB October 13 2023 / April 17 2024 delayed release
1 2 Internal Photos Internal Photos pdf 4.64 MiB October 13 2023 / April 17 2024 delayed release
1 2 External Photos External Photos pdf 1.44 MiB October 13 2023 / April 17 2024 delayed release
1 2 Label and Location ID Label/Location Info pdf 210.16 KiB October 13 2023 / October 20 2023
1 2 Attestation Statement part 2.911(d)(7) Attestation Statements pdf 523.44 KiB October 13 2023 / October 20 2023
1 2 Attstn Stmt Part 2.911(d)(5)(i)&(ii) Attestation Statements pdf 516.42 KiB October 13 2023 / October 20 2023
1 2 Confidentiality Letter Cover Letter(s) pdf 553.12 KiB October 17 2023 / October 20 2023
1 2 Power of Attorney Letter Cover Letter(s) pdf 489.48 KiB October 13 2023 / October 20 2023
1 2 Professional Installation Dec Letter Cover Letter(s) pdf 515.94 KiB October 13 2023 / October 20 2023
1 2 RF Exposure MPE RF Exposure Info pdf 443.43 KiB October 13 2023 / October 20 2023
1 2 TPC Declaration Letter Cover Letter(s) pdf 515.57 KiB October 13 2023 / October 20 2023
1 2 TR Antenna EUT1 Internal Test Report pdf 1.01 MiB October 18 2023 / October 20 2023
1 2 TR Antenna EUT2 External Test Report pdf 1.36 MiB October 18 2023 / October 20 2023
1 2 TR Antenna EUT2 Internal Test Report pdf 828.22 KiB October 18 2023 / October 20 2023
1 2 TSUP 5G UNII 1-3 Test Setup Photos pdf 687.30 KiB October 13 2023 / April 17 2024 delayed release
1 2 TSUP Antenna EUT1 Internal Test Setup Photos pdf 1.22 MiB October 18 2023 / April 17 2024 delayed release
1 2 TSUP Antenna EUT2 External Test Setup Photos pdf 312.90 KiB October 18 2023 / April 17 2024 delayed release
1 2 TSUP Antenna EUT2 Internal Test Setup Photos pdf 868.14 KiB October 18 2023 / April 17 2024 delayed release
1 2 TSUP DFS Test Setup Photos pdf 153.34 KiB October 13 2023 / April 17 2024 delayed release
1 2 Test Report 5G UNII 1-3 Part 1 Test Report pdf 5.37 MiB October 13 2023 / October 20 2023
1 2 Test Report 5G UNII 1-3 Part 2 Test Report pdf 5.38 MiB October 13 2023 / October 20 2023
1 2 Test Report 5G UNII 1-3 Part 3 Test Report pdf 1.55 MiB October 13 2023 / October 20 2023
1 2 Test Report BT 5.0 Test Report pdf 1.18 MiB October 20 2023
1 2 Test Report DFS Test Report pdf 1.89 MiB October 13 2023 / October 20 2023
1 2 Cover Letter(s) pdf October 13 2023 / October 20 2023
1 2 TSUP 2.4G Test Setup Photos pdf 399.14 KiB October 13 2023 / April 17 2024 delayed release
1 2 Test Report 2.4G Test Report pdf 2.98 MiB October 13 2023 / October 20 2023
1 2 Test Setup Photos BT 5.0 Test Setup Photos pdf 515.84 KiB October 20 2023 / April 17 2024 delayed release

frequency equipment class purpose
1 2023-10-20 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX Original Equipment
2 2412 ~ 2462 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 Effective 2023-10-20
1 2 Applicant's complete, legal business name Accton Technology Corp
1 2 FCC Registration Number (FRN) 0005033246
1 2 Physical Address No. 1, Creation Rd. III
1 2 Hsin Chu 30077, N/A
1 2 Taiwan
app s TCB Information
1 2 TCB Application Email Address t******@timcoengr.com
1 2 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 Grantee Code HED
1 2 Equipment Product Code OAP101
app s Person at the applicant's address to receive grant or for contact
1 2 Name A**** W******
1 2 Title Manager
1 2 Telephone Number 886-3******** Extension:
1 2 Fax Number 886-3********
1 2 E-mail a******@accton.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)04/17/2024
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 Is this application for software defined/cognitive radio authorization?No
1 2 Equipment ClassNII - Unlicensed National Information Infrastructure TX
1 2 DTS - Digital Transmission System
1 2 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Outdoor Access Point
1 2 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 Modular Equipment TypeDoes not apply
1 2 Purpose / Application is forOriginal Equipment
1 2 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 Grant CommentsOutput Power listed is the maximum combined conducted output power. The antenna(s) used for this transmitter must be installed and operated so as to provide a separation distance of at least 51 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. End-users must be informed of operating requirements for satisfying RF exposure compliance. This device supports 20, 40 and 80 MHz bandwidth modes.
1 2 Output Power listed is the maximum combined conducted output power. The antenna(s) used for this transmitter must be installed and operated so as to provide a separation distance of at least 51 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. End-users must be informed of operating requirements for satisfying RF exposure compliance. This device supports 20 and 40 MHz bandwidth modes.
1 2 Is there an equipment authorization waiver associated with this application?No
1 2 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 Firm Name Sporton International Inc. Hsinchu Laboratory
1 2 Name A****** C******
1 2 Telephone Number +886-********
1 2 Fax Number +886-********
1 2 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC MO 5180 5250 0.395
1 2 15E CC MO ND 5250 5320 0.239
1 3 15E CC MO ND 5500 5720 0.249
1 4 15E CC MO 5745 5825 0.991
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC MO 2412 2462 0.968
2 2 15C CC 2402 2480 0.002

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC