FCC ID: HLZM3 Acer Connect

by: Acer Incorporated latest update: 2023-03-14 model: M3

Five grants have been issued under this FCC ID on 03/14/2023 (this is one of forty-five releases in 2023 for this grantee). Public details available include frequency information, internal & external photos, and manuals. some products also feature user submitted or linked password defaults, troubleshooting guides, instructions, drivers, & warrantee terms.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 Users Manual Users Manual pdf 2.09 MiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Internal Photos Internal Photos pdf 3.03 MiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 External Photos External Photos pdf 754.87 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 ID Label/Location Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 Attestation Statements pdf March 10 2023 / March 14 2023
1 2 3 4 5 Attestation Statements pdf March 10 2023 / March 14 2023
1 2 3 4 5 Cover Letter(s) pdf March 10 2023 / March 14 2023
1 2 3 4 5 BOM Parts List/Tune Up Info pdf March 10 2023 confidential
1 2 3 4 5 Block Diagram Block Diagram pdf March 10 2023 confidential
1 2 3 4 5 Cover Letter(s) pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Report pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Report pdf March 10 2023 / March 14 2023
1 2 3 4 5 Operational Description Operational Description pdf March 10 2023 confidential
1 2 3 4 5 Power Tune-up Tolerance Procedure Parts List/Tune Up Info pdf March 10 2023 confidential
1 2 3 4 5 Schematics Schematics pdf March 10 2023 confidential
1 2 3 4 5 Test Report LTE-1 Test Report pdf 5.55 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-2 Test Report pdf 5.57 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-3 Test Report pdf 5.58 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-4 Test Report pdf 5.52 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-5 Test Report pdf 5.54 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-6 Test Report pdf 5.59 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-7 Test Report pdf 3.17 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-Part90 Test Report pdf 2.72 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-1 Test Report pdf 4.96 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-10 Test Report pdf 5.06 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-11 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-12 Test Report pdf 4.85 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-13 Test Report pdf 5.03 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-14 Test Report pdf 5.08 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-15 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-16 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-17 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-18 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-19 Test Report pdf 5.03 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-2 Test Report pdf 5.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-20 Test Report pdf 4.94 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-21 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-22 Test Report pdf 4.87 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-23 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-24 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-25 Test Report pdf 5.04 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-26 Test Report pdf 5.00 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-27 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-28 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-29 Test Report pdf 5.10 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-3 Test Report pdf 5.00 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-30 Test Report pdf 3.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-4 Test Report pdf 5.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-5 Test Report pdf 5.04 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-6 Test Report pdf 4.99 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-7 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-8 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-9 Test Report pdf 4.97 MiB March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos PCB Test Setup Photos pdf 478.65 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Test Setup Photos SAR Test Setup Photos pdf 387.51 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Antenna Spec.-1 Test Report pdf 1.30 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Antenna Spec.-2 Test Report pdf 1.40 MiB March 10 2023 / March 14 2023
1 2 3 4 5 DTS UNII Declaration Cover Letter(s) pdf 180.92 KiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report DTS-1 Test Report pdf 4.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report DTS-2 Test Report pdf 3.57 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos DTS Test Setup Photos pdf 675.33 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Tune-Up Procedure Parts List/Tune Up Info pdf March 10 2023 confidential
1 2 3 4 5 WIFI CH12-13 Declaration Cover Letter(s) pdf 375.98 KiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report Test Report pdf 1.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos Test Setup Photos pdf 968.45 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 NII Software Security Info Operational Description pdf March 10 2023 confidential
1 2 3 4 5 Test Report NII-1 Test Report pdf 4.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NII-2 Test Report pdf 3.85 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos NII Test Setup Photos pdf 658.59 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Test Report LTE Part96 Test Report pdf 3.50 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report part96.47 Test Report pdf 729.56 KiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos CBE Test Setup Photos pdf 782.16 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Users Manual Users Manual pdf 2.09 MiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Internal Photos Internal Photos pdf 3.03 MiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 External Photos External Photos pdf 754.87 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 ID Label/Location Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 Attestation Statements pdf March 10 2023 / March 14 2023
1 2 3 4 5 Attestation Statements pdf March 10 2023 / March 14 2023
1 2 3 4 5 Cover Letter(s) pdf March 10 2023 / March 14 2023
1 2 3 4 5 Cover Letter(s) pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Report pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Report pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-1 Test Report pdf 5.55 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-2 Test Report pdf 5.57 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-3 Test Report pdf 5.58 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-4 Test Report pdf 5.52 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-5 Test Report pdf 5.54 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-6 Test Report pdf 5.59 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-7 Test Report pdf 3.17 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report LTE-Part90 Test Report pdf 2.72 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-1 Test Report pdf 4.96 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-10 Test Report pdf 5.06 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-11 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-12 Test Report pdf 4.85 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-13 Test Report pdf 5.03 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-14 Test Report pdf 5.08 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-15 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-16 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-17 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-18 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-19 Test Report pdf 5.03 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-2 Test Report pdf 5.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-20 Test Report pdf 4.94 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-21 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-22 Test Report pdf 4.87 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-23 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-24 Test Report pdf 4.90 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-25 Test Report pdf 5.04 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-26 Test Report pdf 5.00 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-27 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-28 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-29 Test Report pdf 5.10 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-3 Test Report pdf 5.00 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-30 Test Report pdf 3.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-4 Test Report pdf 5.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-5 Test Report pdf 5.04 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-6 Test Report pdf 4.99 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-7 Test Report pdf 5.01 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-8 Test Report pdf 5.07 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NR-9 Test Report pdf 4.97 MiB March 10 2023 / March 14 2023
1 2 3 4 5 RF Exposure Info pdf March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos PCB Test Setup Photos pdf 478.65 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Test Setup Photos SAR Test Setup Photos pdf 387.51 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Antenna Spec.-1 Test Report pdf 1.30 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Antenna Spec.-2 Test Report pdf 1.40 MiB March 10 2023 / March 14 2023
1 2 3 4 5 DTS UNII Declaration Cover Letter(s) pdf 180.92 KiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report DTS-1 Test Report pdf 4.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report DTS-2 Test Report pdf 3.57 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos DTS Test Setup Photos pdf 675.33 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 WIFI CH12-13 Declaration Cover Letter(s) pdf 375.98 KiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report Test Report pdf 1.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos Test Setup Photos pdf 968.45 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Test Report NII-1 Test Report pdf 4.05 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report NII-2 Test Report pdf 3.85 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos NII Test Setup Photos pdf 658.59 KiB March 10 2023 / September 07 2023 delayed release
1 2 3 4 5 Test Report LTE Part96 Test Report pdf 3.50 MiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Report part96.47 Test Report pdf 729.56 KiB March 10 2023 / March 14 2023
1 2 3 4 5 Test Setup Photos CBE Test Setup Photos pdf 782.16 KiB March 10 2023 / September 07 2023 delayed release

frequency equipment class purpose
1 2023-03-14 3705 ~ 3975 PCB - PCS Licensed Transmitter Original Equipment
2 2412 ~ 2462 DTS - Digital Transmission System
3 JBP - Part 15 Class B Computing Device Peripheral
4 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
5 3550 ~ 3700 CBE - Citizens Band End User Devices

Application Forms

app s Applicant Information
1 2 3 4 5 Effective 2023-03-14
1 2 3 4 5 Applicant's complete, legal business name Acer Incorporated
1 2 3 4 5 FCC Registration Number (FRN) 0013355508
1 2 3 4 5 Physical Address 8F, 88, Sec. 1, Xintai 5th Rd. Xizhi
1 2 3 4 5 New Taipei City, N/A
1 2 3 4 5 Taiwan
app s TCB Information
1 2 3 4 5 TCB Application Email Address c******@telefication.com
1 2 3 4 5 TCB Scope B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 B2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95, 97, & 101 (all below 3 GHz)
app s FCC ID
1 2 3 4 5 Grantee Code HLZ
1 2 3 4 5 Equipment Product Code M3
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 Name R****** J****
1 2 3 4 5 Title Sr. Manager
1 2 3 4 5 Telephone Number 886-2******** Extension:
1 2 3 4 5 Fax Number 886-2********
1 2 3 4 5 E-mail r******@acer.com
app s Technical Contact
1 2 3 4 5 Firm Name Shenzhen Morlab Communications Technology Co., Ltd
1 2 3 4 5 Name W****** Z****
1 2 3 4 5 Physical Address FL.1, Building A, FeiYang Science Park, No.8
1 2 3 4 5 China
1 2 3 4 5 Telephone Number 86 (0********
1 2 3 4 5 Fax Number 86 (0********
1 2 3 4 5 E-mail w******@morlab.cn
app s Non Technical Contact
1 2 3 4 5 Firm Name Shenzhen Morlab Communications Technology Co., Ltd
1 2 3 4 5 Name W******** Z****
1 2 3 4 5 Physical Address FL.1, Building A, FeiYang Science Park, No.8
1 2 3 4 5 China
1 2 3 4 5 Telephone Number 86 (0********
1 2 3 4 5 Fax Number 86 (0********
1 2 3 4 5 E-mail w******@morlab.cn
app s Confidentiality (long or short term)
1 2 3 4 5 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)09/07/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 Equipment ClassPCB - PCS Licensed Transmitter
1 2 3 4 5 DTS - Digital Transmission System
1 2 3 4 5 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 CBE - Citizens Band End User Devices
1 2 3 4 5 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Acer Connect
1 2 3 4 5 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 5 Modular Equipment TypeDoes not apply
1 2 3 4 5 Purpose / Application is forOriginal Equipment
1 2 3 4 5 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 Grant CommentsOutput power is ERP for Part 22, Part 27 and Part 90; EIRP for Part 24 and Part 27. This is a portable device. The SAR data in this filing is applicable to demonstrate compliance for body operating conditions and is limited to the specific configuration tested for this filling. SAR has been evaluated at 10 mm. The highest reported SAR values for body and simultaneous transmission use conditions are 1.12 W/kg and 1.59 W/kg, respectively.
1 2 3 4 5 Power Output is conducted. This is a portable device. The SAR data in this filing is applicable to demonstrate compliance for body operating conditions and is limited to the specific configuration tested for this filling. SAR has been evaluated at 10 mm. The highest reported SAR values for body and simultaneous transmission use conditions are 0.42 W/kg and 1.45 W/kg, respectively.
1 2 3 4 5 Power Output is conducted. This is a portable device. The SAR data in this filing is applicable to demonstrate compliance for body operating conditions and is limited to the specific configuration tested for this filling. SAR has been evaluated at 10 mm. The highest reported SAR values for body and simultaneous transmission use conditions are 0.60 W/kg and 1.28 W/kg, respectively.
1 2 3 4 5 Output power is EIRP. This is a portable device. The SAR data in this filing is applicable to demonstrate compliance for body operating conditions and is limited to the specific configuration tested for this filling. SAR has been evaluated at 10 mm. The highest reported SAR values for body and simultaneous transmission use conditions are 0.40 W/kg and 1.03 W/kg, respectively.
1 2 3 4 5 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 Firm Name Shenzhen Morlab Communications Technology Co. Ltd.
1 2 3 4 5 Name M****** F******
1 2 3 4 5 Telephone Number +86 7********
1 2 3 4 5 E-mail Z******@morlab.cn
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 9 790.5 795.5 0.126 0.072 ppm 9M00G7D
1 2 9 790.5 795.5 0.1 0.072 ppm 8M98W7D
1 3 9 814.7 823.3 0.255 0.068 ppm 9M01G7D
1 4 9 814.7 823.3 0.204 0.068 ppm 8M98W7D
1 5 9 814.7 823.3 0.3 0.068 ppm 4M50G7D
1 6 9 814.7 823.3 0.267 0.068 ppm 4M51W7D
1 7 24E 1850.7 1909.3 0.444 0.028 ppm 18M0G7D
1 8 24E 1850.7 1909.3 0.349 0.028 ppm 18M0W7D
1 9 24E 1850.7 1909.3 0.36 0.028 ppm 8M98W7D
1 1 27 1710.7 1754.3 0.288 0.034 ppm 18M0G7D
1 11 27 1710.7 1754.3 0.243 0.034 ppm 18M0W7D
1 12 22H 824.7 848.3 0.267 0.067 ppm 9M02G7D
1 13 22H 824.7 848.3 0.21 0.067 ppm 8M99W7D
1 14 22H 824.7 848.3 0.216 0.067 ppm 2M70W7D
1 15 27 2502.5 2567.5 0.237 0.021 ppm 18M0G7D
1 16 27 2502.5 2567.5 0.195 0.021 ppm 18M0W7D
1 17 27 699.7 715.3 0.167 0.081 ppm 9M00G7D
1 18 27 699.7 715.3 0.136 0.081 ppm 8M98W7D
1 19 27 699.7 715.3 0.137 0.081 ppm 4M50W7D
1 2 27 779.5 784.5 0.142 0.06 ppm 8M97G7D
1 21 27 779.5 784.5 0.113 0.06 ppm 8M97W7D
1 22 27 779.5 784.5 0.115 0.06 ppm 4M50W7D
1 23 27 706.5 713.5 0.166 0.08 ppm 8M99G7D
1 24 27 706.5 713.5 0.135 0.08 ppm 8M98W7D
1 25 27 706.5 713.5 0.136 0.08 ppm 4M50W7D
1 26 24E 1850.7 1914.3 0.452 0.03 ppm 17M9G7D
1 27 24E 1850.7 1914.3 0.363 0.03 ppm 18M0W7D
1 28 22H 824.7 848.3 0.299 0.068 ppm 13M5G7D
1 29 22H 824.7 848.3 0.267 0.068 ppm 13M5W7D
1 3 22H 824.7 848.3 0.3 0.068 ppm 9M01G7D
1 31 27 2307.5 2312.5 0.427 0.024 ppm 9M00G7D
1 32 27 2307.5 2312.5 0.352 0.024 ppm 8M99W7D
1 33 27 2572.5 2617.5 0.339 0.022 ppm 18M0G7D
1 34 27 2572.5 2617.5 0.277 0.022 ppm 18M0W7D
1 35 27 2572.5 2617.5 0.278 0.022 ppm 4M50W7D
1 36 27 2498.5 2687.5 0.757 0.022 ppm 18M0G7D
1 37 27 2498.5 2687.5 0.607 0.022 ppm 18M0W7D
1 38 27 2498.5 2687.5 0.618 0.022 ppm 13M5W7D
1 39 27 3452.5 3547.5 0.185 0.013 ppm 18M0G7D
1 4 27 3452.5 3547.5 0.149 0.013 ppm 18M0W7D
1 41 27 3452.5 3547.5 0.151 0.013 ppm 13M5W7D
1 42 27 1710.7 1779.3 0.292 0.03 ppm 17M9G7D
1 43 27 1710.7 1779.3 0.236 0.03 ppm 17M9W7D
1 44 27 1710.7 1779.3 0.24 0.03 ppm 4M50W7D
1 45 27 665.5 695.5 0.14 0.082 ppm 18M0G7D
1 46 27 665.5 695.5 0.114 0.082 ppm 17M9W7D
1 47 27 665.5 695.5 0.116 0.082 ppm 4M50W7D
1 48 24E 1852.5 1907.5 0.511 0.02 ppm 17M9G7D
1 49 24E 1852.5 1907.5 0.52 0.02 ppm 17M9G7D
1 5 24E 1852.5 1907.5 0.406 0.02 ppm 17M9W7D
1 51 22H 826.5 846.5 0.546 0.061 ppm 18M1G7D
1 52 22H 826.5 846.5 0.558 0.061 ppm 18M0G7D
1 53 22H 826.5 846.5 0.452 0.061 ppm 17M9W7D
1 54 27 2505 2565 0.338 0.015 ppm 17M9G7D
1 55 27 2505 2565 0.352 0.015 ppm 17M9G7D
1 56 27 2505 2565 0.24 0.015 ppm 18M0W7D
1 57 27 2575 2615 0.324 0.02 ppm 35M7G7D
1 58 27 2575 2615 0.338 0.02 ppm 35M8G7D
1 59 27 2575 2615 0.175 0.02 ppm 35M8W7D
1 6 27 2501.01 2685 0.948 0.01 ppm 96M3G7D
1 61 27 2501.01 2685 1.009 0.01 ppm 96M0G7D
1 62 27 2501.01 2685 0.608 0.01 ppm 96M2W7D
1 63 27 1712.5 1777.5 0.335 0.03 ppm 38M6G7D
1 64 27 1712.5 1777.5 0.338 0.03 ppm 38M5G7D
1 65 27 1712.5 1777.5 0.239 0.03 ppm 38M6W7D
1 66 27 665.5 695.5 0.283 0.051 ppm 17M9G7D
1 67 27 665.5 695.5 0.286 0.051 ppm 17M9G7D
1 68 27 665.5 695.5 0.215 0.051 ppm 17M9W7D
1 69 27 3705 3975 0.738 0.014 ppm 96M3G7D
1 7 27 3705 3975 0.753 0.014 ppm 96M0G7D
1 71 27 3705 3975 0.452 0.014 ppm 96M5W7D
1 72 27 3455.01 3544.995 0.675 0.014 ppm 96M1G7D
1 73 27 3455.01 3544.995 0.678 0.014 ppm 96M1G7D
1 74 27 3455.01 3544.995 0.455 0.014 ppm 96M1W7D
1 75 27 3705 3795 0.568 0.014 ppm 96M3G7D
1 76 27 3705 3795 0.593 0.014 ppm 96M0G7D
1 77 27 3705 3795 0.323 0.014 ppm 96M5W7D
1 78 27 3455.01 3544.995 0.557 0.014 ppm 96M1G7D
1 79 27 3455.01 3544.995 0.566 0.014 ppm 96M1G7D
1 8 27 3455.01 3544.995 0.384 0.014 ppm 96M1W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC MO 2412.00000000 2462.00000000 0.7500000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15E CC MO 5180 5240 0.087
4 2 15E CC MO 5745 5825 0.15
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 96 3550 3600 0.184 0.014 ppm 18M0G7D
5 2 96 3550 3600 0.148 0.014 ppm 18M0W7D
5 3 96 3550 3700 0.193 0.014 ppm 18M0G7D
5 4 96 3550 3700 0.154 0.014 ppm 18M0W7D
5 5 96 3550 3700 0.161 0.014 ppm 4M51W7D

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC