FCC ID: 2AAS9-WMDS183G2 LoRa Module

by: BROWAN COMMUNICATIONS INCORPORATION latest update: 2023-07-06 model: WMDS183G2

Four grants have been issued under this FCC ID from 08/29/2022 to 07/06/2023 (this is one of five releases in 2023 for this grantee). Public details available include internal & external photos, manuals, and frequency information. some products also feature user submitted or linked warrantee terms, password defaults, troubleshooting guides, drivers, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 Users Manual Users Manual pdf 837.92 KiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 Internal Photos Internal Photos pdf 1.93 MiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 External Photos External Photos pdf 2.33 MiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 ID Label/Location Info ID Label/Location Info pdf 156.11 KiB August 25 2022 / August 29 2022
1 2 3 4 Antenna spec 1. OMA-G01 Test Report pdf 830.86 KiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 2. OMA-G03A Test Report pdf 550.68 KiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 3. OMA-G04A Test Report pdf 567.43 KiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 4. A8-A003-00108 Test Report pdf 1.57 MiB July 05 2023 / July 06 2023
1 2 3 4 Test Report pdf July 05 2023 / July 06 2023
1 2 3 4 C2PC request letter Cover Letter(s) pdf 14.49 KiB July 05 2023 / July 06 2023
1 2 3 4 Covered List Attestation Statements pdf 36.14 KiB July 05 2023 / July 06 2023
1 2 3 4 Declaration of authorization Cover Letter(s) pdf 17.52 KiB July 05 2023 / July 06 2023
1 2 3 4 FCC Agent Attestation Attestation Statements pdf 223.73 KiB July 05 2023 / July 06 2023
1 2 3 4 MPE Report RF Exposure Info pdf 146.88 KiB July 05 2023 / July 06 2023
1 2 3 4 Operational Description Operational Description pdf July 06 2023 confidential
1 2 3 4 Cover Letter(s) pdf July 05 2023 / July 06 2023
1 2 3 4 Cover Letter(s) pdf July 06 2023
1 2 3 4 Test Report DSS Test Report pdf 1.86 MiB July 05 2023 / July 06 2023
1 2 3 4 Test Setup Photos DSS Test Setup Photos pdf 1.68 MiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 Test Report DTS Test Report pdf 3.01 MiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 1. OMA-G01 Operational Description pdf August 25 2022 confidential
1 2 3 4 Antenna spec 2. OMA-G03A Operational Description pdf August 25 2022 confidential
1 2 3 4 Antenna spec 3. OMA-G04A Operational Description pdf August 25 2022 confidential
1 2 3 4 Antenna spec 4. A8-A003-00108 Operational Description pdf August 25 2022 confidential
1 2 3 4 Antenna spec 5. AB0915-4602RS-1P5M Operational Description pdf August 25 2022 confidential
1 2 3 4 Block Diagram Block Diagram pdf August 25 2022 confidential
1 2 3 4 Confidentiality Cover Letter(s) pdf 52.84 KiB August 25 2022 / August 29 2022
1 2 3 4 MPE RF Exposure Info pdf 2.86 MiB August 25 2022 / August 29 2022
1 2 3 4 MPE revised RF Exposure Info pdf 2.76 MiB September 15 2022 / August 29 2022
1 2 3 4 Modular Approval Request Cover Letter(s) pdf 86.38 KiB August 25 2022 / August 29 2022
1 2 3 4 Schematics Schematics pdf August 25 2022 confidential
1 2 3 4 Test Report Test Report pdf 2.82 MiB August 25 2022 / August 29 2022
1 2 3 4 Test Report revised Test Report pdf 2.73 MiB September 15 2022 / August 29 2022
1 2 3 4 Test Setup Photos Test Setup Photos pdf August 25 2022 / February 22 2023 delayed release
1 2 3 4 Test Setup Photos revised Test Setup Photos pdf 2.77 MiB September 15 2022 / February 22 2023
1 2 3 4 Users Manual pdf September 15 2022 / February 22 2023
1 2 3 4 Users Manual Users Manual pdf 837.92 KiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 Internal Photos Internal Photos pdf 1.93 MiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 External Photos External Photos pdf 2.33 MiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 ID Label/Location Info ID Label/Location Info pdf 156.11 KiB August 25 2022 / August 29 2022
1 2 3 4 Antenna spec 1. OMA-G01 Test Report pdf 830.86 KiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 2. OMA-G03A Test Report pdf 550.68 KiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 3. OMA-G04A Test Report pdf 567.43 KiB July 05 2023 / July 06 2023
1 2 3 4 Antenna spec 4. A8-A003-00108 Test Report pdf 1.57 MiB July 05 2023 / July 06 2023
1 2 3 4 Test Report pdf July 05 2023 / July 06 2023
1 2 3 4 C2PC request letter Cover Letter(s) pdf 14.49 KiB July 05 2023 / July 06 2023
1 2 3 4 Covered List Attestation Statements pdf 36.14 KiB July 05 2023 / July 06 2023
1 2 3 4 Declaration of authorization Cover Letter(s) pdf 17.52 KiB July 05 2023 / July 06 2023
1 2 3 4 FCC Agent Attestation Attestation Statements pdf 223.73 KiB July 05 2023 / July 06 2023
1 2 3 4 MPE Report RF Exposure Info pdf 146.88 KiB July 05 2023 / July 06 2023
1 2 3 4 Cover Letter(s) pdf July 06 2023
1 2 3 4 Test Report DSS Test Report pdf 1.86 MiB July 05 2023 / July 06 2023
1 2 3 4 Test Setup Photos DSS Test Setup Photos pdf 1.68 MiB July 05 2023 / January 02 2024 delayed release
1 2 3 4 Test Report DTS Test Report pdf 3.01 MiB July 05 2023 / July 06 2023
1 2 3 4 Confidentiality Cover Letter(s) pdf 52.84 KiB August 25 2022 / August 29 2022
1 2 3 4 MPE RF Exposure Info pdf 2.86 MiB August 25 2022 / August 29 2022
1 2 3 4 MPE revised RF Exposure Info pdf 2.76 MiB September 15 2022 / August 29 2022
1 2 3 4 Modular Approval Request Cover Letter(s) pdf 86.38 KiB August 25 2022 / August 29 2022
1 2 3 4 Test Report Test Report pdf 2.82 MiB August 25 2022 / August 29 2022
1 2 3 4 Test Report revised Test Report pdf 2.73 MiB September 15 2022 / August 29 2022
1 2 3 4 Test Setup Photos revised Test Setup Photos pdf 2.77 MiB September 15 2022 / February 22 2023

frequency equipment class purpose
1 2023-07-06 902.3 ~ 914.9 DSS - Part 15 Spread Spectrum Transmitter Class II Permissive Change
2 923.3 ~ 927.5 DTS - Digital Transmission System
3 2022-08-29 923.3 ~ 927.5 DTS - Digital Transmission System Original Equipment
4 902.3 ~ 914.9 DSS - Part 15 Spread Spectrum Transmitter

Application Forms

app s Applicant Information
1 2 3 4 Effective 2023-07-06
1 2 3 4 2022-08-29
1 2 3 4 Applicant's complete, legal business name BROWAN COMMUNICATIONS INCORPORATION
1 2 3 4 FCC Registration Number (FRN) 0022899645
1 2 3 4 Physical Address No.15-1, Zhonghua Rd., Hsinchu Industrial Park, Hukou
1 2 3 4 No.15-1, Zhonghua Rd.
1 2 3 4 Hsinchu Hsien, N/A
1 2 3 4 Taiwan
app s TCB Information
1 2 3 4 TCB Application Email Address c******@telefication.com
1 2 3 4 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 Grantee Code 2AAS9
1 2 3 4 Equipment Product Code WMDS183G2
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 Name G****** C****
1 2 3 4 Title Director
1 2 3 4 Telephone Number 886-3******** Extension:
1 2 3 4 Fax Number 886-3********
1 2 3 4 E-mail g******@browan.com
app s Technical Contact
1 2 3 4 Firm Name BROWAN COMMUNICATIONS INCORPORATION
1 2 3 4 Name G******** C****
1 2 3 4 Physical Address No. 15-1, Zhonghua Rd., Hsinchu
1 2 3 4 No.15-1, Zhonghua Rd.
1 2 3 4 Taiwan
1 2 3 4 Telephone Number 886-3********
1 2 3 4 886-3********
1 2 3 4 Fax Number 886-3********
1 2 3 4 E-mail G******@browan.com
app s Non Technical Contact
1 2 3 4 Firm Name Cerpass Technology Corporation
1 2 3 4 Name N****** H********
1 2 3 4 Physical Address No.10, Lane 2, Lianfu Street, Luzhu Dist.
1 2 3 4 Taiwan
1 2 3 4 Telephone Number 886-3********
1 2 3 4 +8863********
1 2 3 4 Fax Number 886-3********
1 2 3 4 E-mail n******@cerpass.com.tw
app s Confidentiality (long or short term)
1 2 3 4 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)01/02/2024
1 2 3 4 02/22/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 Equipment ClassDSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 DTS - Digital Transmission System
1 2 3 4 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)LoRa Module
1 2 3 4 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 Modular Equipment TypeSingle Modular Approval
1 2 3 4 Purpose / Application is forClass II Permissive Change
1 2 3 4 Original Equipment
1 2 3 4 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 Grant CommentsC2PC: Add a component (USB IC) on the module. Modular Approval. Power Output is conducted. This grant is valid only when the module is sold to OEM integrators and must be installed by the OEM or OEM integrators. The antenna's as listed in this application must not be co-located or operating in conjunction with any other antenna or transmitter except in accordance with FCC multi-transmitter procedures. End-users may not be provided with the module installation instructions. OEM integrators and end-users must be provided with transmitter operating conditions for satisfying RF exposure compliance.
1 2 3 4 Modular Approval. Power Output is conducted. This grant is valid only when the module is sold to OEM integrators and must be installed by the OEM or OEM integrators. The antenna's as listed in this application must not be co-located or operating in conjunction with any other antenna or transmitter except in accordance with FCC multi-transmitter procedures. End-users may not be provided with the module installation instructions. OEM integrators and end-users must be provided with transmitter operating conditions for satisfying RF exposure compliance.
1 2 3 4 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 Firm Name Cerpass Technology Corporation Test Laboratory
1 2 3 4 Cerpass technology corporation Test Laboratory
1 2 3 4 Name B******** W****
1 2 3 4 Telephone Number +886-******** Extension:
1 2 3 4 Fax Number +886-********
1 2 3 4 E-mail b******@cerpass.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15C 902.30000000 914.90000000 0.5700000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C 923.30000000 927.50000000 0.3700000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C 923.30000000 927.50000000 0.3700000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C 902.30000000 914.90000000 0.5700000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC