FCC ID: 2ABLKU10XE GigaSpire BLAST u10xe

by: Calix Inc. latest update: 2023-07-19 model: U10XE

Four grants have been issued under this FCC ID on 07/19/2023 (this is one of six releases in 2023 for this grantee). Public details available include frequency information, internal & external photos, and manuals. some products also feature user submitted or linked troubleshooting guides, drivers, password defaults, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 User Manual Users Manual pdf 605.18 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Internal Photos Part 1 Internal Photos pdf 5.40 MiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Internal Photos Part 2 Internal Photos pdf 5.36 MiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 External Photos External Photos pdf 1.28 MiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Label and Location ID Label/Location Info pdf 1023.34 KiB June 06 2023 / July 19 2023
1 2 3 4 Test Report pdf July 10 2023 / July 19 2023
1 2 3 4 Attestation Statements Part 2.911(d)(7) Attestation Statements pdf 161.35 KiB June 06 2023 / July 19 2023
1 2 3 4 Attstn Stmt part 2.911(d)(5)(ii) Attestation Statements pdf 173.22 KiB June 06 2023 / July 19 2023
1 2 3 4 Block Diagram Block Diagram pdf June 06 2023 confidential
1 2 3 4 Confidentiality Request Letter Cover Letter(s) pdf 238.08 KiB June 06 2023 / July 19 2023
1 2 3 4 Declaration on Indoor Subordinate Operation Attestation Statements pdf 332.05 KiB June 06 2023 / July 19 2023
1 2 3 4 MPE Report RF Exposure Info pdf 474.76 KiB June 06 2023 / July 19 2023
1 2 3 4 Op Desc SDR & Software Security SDR Software/Security Inf pdf June 06 2023 confidential
1 2 3 4 Operational Description Operational Description pdf June 06 2023 confidential
1 2 3 4 Power of Attorney Letter Cover Letter(s) pdf 135.03 KiB June 06 2023 / July 19 2023
1 2 3 4 Schematics Schematics pdf June 06 2023 confidential
1 2 3 4 Test Report 6G Part 1 Test Report pdf 4.48 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 2 Test Report pdf 5.09 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 3 Test Report pdf 5.18 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 4 Test Report pdf 3.49 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Setup Photos 6G Test Setup Photos pdf 418.98 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Setup Photos Antenna 6G Test Setup Photos pdf 487.46 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Antenna Report 5G Part 1 Test Report pdf 5.09 MiB June 06 2023 / July 19 2023
1 2 3 4 Antenna Report 5G Part 2 Test Report pdf 4.05 MiB June 06 2023 / July 19 2023
1 2 3 4 Attestation Statements pdf June 06 2023 / July 19 2023
1 2 3 4 TPC Declaration Letter Cover Letter(s) pdf 109.08 KiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 5G Part 1 Test Report pdf 4.51 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 5G Part 2 Test Report pdf 3.15 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report DFS Test Report pdf 2.54 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Setup Photos 5G Test Setup Photos pdf 423.76 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Setup Photos Antenna 5G Test Setup Photos pdf 256.27 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Setup Photos DFS Test Setup Photos pdf 176.16 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Report pdf June 06 2023 / July 19 2023
1 2 3 4 Test Report pdf June 06 2023 / July 19 2023
1 2 3 4 Test Report 2.4G Test Report pdf 2.72 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Setup Photos 2.4G Test Setup Photos pdf 421.32 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Declaration on Indoor Access Point Operation Attestation Statements pdf 240.58 KiB June 06 2023 / July 19 2023
1 2 3 4 User Manual Users Manual pdf 605.18 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Internal Photos Part 1 Internal Photos pdf 5.40 MiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Internal Photos Part 2 Internal Photos pdf 5.36 MiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 External Photos External Photos pdf 1.28 MiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Label and Location ID Label/Location Info pdf 1023.34 KiB June 06 2023 / July 19 2023
1 2 3 4 Test Report pdf July 10 2023 / July 19 2023
1 2 3 4 Attestation Statements Part 2.911(d)(7) Attestation Statements pdf 161.35 KiB June 06 2023 / July 19 2023
1 2 3 4 Attstn Stmt part 2.911(d)(5)(ii) Attestation Statements pdf 173.22 KiB June 06 2023 / July 19 2023
1 2 3 4 Confidentiality Request Letter Cover Letter(s) pdf 238.08 KiB June 06 2023 / July 19 2023
1 2 3 4 Declaration on Indoor Subordinate Operation Attestation Statements pdf 332.05 KiB June 06 2023 / July 19 2023
1 2 3 4 MPE Report RF Exposure Info pdf 474.76 KiB June 06 2023 / July 19 2023
1 2 3 4 Power of Attorney Letter Cover Letter(s) pdf 135.03 KiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 1 Test Report pdf 4.48 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 2 Test Report pdf 5.09 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 3 Test Report pdf 5.18 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 6G Part 4 Test Report pdf 3.49 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Setup Photos 6G Test Setup Photos pdf 418.98 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Setup Photos Antenna 6G Test Setup Photos pdf 487.46 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Antenna Report 5G Part 1 Test Report pdf 5.09 MiB June 06 2023 / July 19 2023
1 2 3 4 Antenna Report 5G Part 2 Test Report pdf 4.05 MiB June 06 2023 / July 19 2023
1 2 3 4 Attestation Statements pdf June 06 2023 / July 19 2023
1 2 3 4 TPC Declaration Letter Cover Letter(s) pdf 109.08 KiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 5G Part 1 Test Report pdf 4.51 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report 5G Part 2 Test Report pdf 3.15 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Report DFS Test Report pdf 2.54 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Setup Photos 5G Test Setup Photos pdf 423.76 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Setup Photos Antenna 5G Test Setup Photos pdf 256.27 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Setup Photos DFS Test Setup Photos pdf 176.16 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Test Report pdf June 06 2023 / July 19 2023
1 2 3 4 Test Report pdf June 06 2023 / July 19 2023
1 2 3 4 Test Report 2.4G Test Report pdf 2.72 MiB June 06 2023 / July 19 2023
1 2 3 4 Test Setup Photos 2.4G Test Setup Photos pdf 421.32 KiB June 06 2023 / January 15 2024 delayed release
1 2 3 4 Declaration on Indoor Access Point Operation Attestation Statements pdf 240.58 KiB June 06 2023 / July 19 2023

frequency equipment class purpose
1 2023-07-19 5955 ~ 7095 6PP - 15E 6 GHz Subordinate Indoor Device Original Equipment
2 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
3 2412 ~ 2462 DTS - Digital Transmission System
4 5955 ~ 7095 6ID - 15E 6 GHz Low Power Indoor Access Point

Application Forms

app s Applicant Information
1 2 3 4 Effective 2023-07-19
1 2 3 4 Applicant's complete, legal business name Calix Inc.
1 2 3 4 FCC Registration Number (FRN) 0023213168
1 2 3 4 Physical Address 1035 N. McDowell Blvd. Petaluma, CA94954 U.S.A.
1 2 3 4 1035 N. McDowell Blvd. Petaluma
1 2 3 4 Petaluma, CA
1 2 3 4 United States
app s TCB Information
1 2 3 4 TCB Application Email Address c******@timcoengr.com
1 2 3 4 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 Grantee Code 2ABLK
1 2 3 4 Equipment Product Code U10XE
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 Name H******** B********
1 2 3 4 Telephone Number 707-3********
1 2 3 4 Fax Number 707-2********
1 2 3 4 E-mail H******@calix.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)01/15/2024
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 Is this application for software defined/cognitive radio authorization?Yes
1 2 3 4 Equipment Class6PP - 15E 6 GHz Subordinate Indoor Device
1 2 3 4 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 DTS - Digital Transmission System
1 2 3 4 6ID - 15E 6 GHz Low Power Indoor Access Point
1 2 3 4 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)GigaSpire BLAST u10xe
1 2 3 4 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 Modular Equipment TypeDoes not apply
1 2 3 4 Purpose / Application is forOriginal Equipment
1 2 3 4 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 Grant CommentsPower listed is EIRP. Software Defined Radio. Device operates with specific antennas in MIMO configurations as described in this filing. The antennas used for this device must be installed to provide a separation distance of at least 46 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device has 20, 40, 80 and 160 MHz bandwidth modes. Device is intended for indoor use only.
1 2 3 4 Output Power listed is the maximum combined conducted output power. Software Defined Radio. Device operates with specific antennas in MIMO configurations as described in this filing. The antennas used for this device must be installed to provide a separation distance of at least 46 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device supports 20, 40, 80 and 80+80 MHz bandwidth modes. Device is intended for indoor use only.
1 2 3 4 Output Power listed is the maximum combined conducted output power. Software Defined Radio. Device operates with specific antennas in MIMO configurations as described in this filing. The antennas used for this device must be installed to provide a separation distance of at least 46 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device supports 20 and 40 MHz bandwidth modes. Device is intended for indoor use only.
1 2 3 4 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 Firm Name Sporton International Inc. Hsinchu Laboratory
1 2 3 4 Name A****** C********
1 2 3 4 Telephone Number +886-********
1 2 3 4 Fax Number +886-********
1 2 3 4 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC EP MO 5955.00000000 7095.00000000 0.2130000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC MO 5180 5240 0.995
2 2 15E CC MO ND 5260 5320 0.248
2 3 15E CC MO ND 5500 5720 0.245
2 4 15E CC MO 5745 5825 0.991
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C CC MO 2412.00000000 2462.00000000 0.9820000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15E CC EP MO 5955.00000000 7095.00000000 0.2130000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC