FCC ID: Q95ER30 UCS for LS24x

by: Cardo Systems, LTD latest update: 2023-09-12 model: ER30

Four grants have been issued under this FCC ID from 03/13/2023 to 09/12/2023 (this is one of six releases in 2023 for this grantee). Public details available include internal & external photos, manuals, and frequency information. some products also feature user submitted or linked password defaults, warrantee terms, troubleshooting guides, drivers, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 User Manual Installation Guide Users Manual pdf 4.09 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 User Manual Installation Location Users Manual pdf 192.99 KiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 User Manual Statement Users Manual pdf 1.17 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 Internal Photos Internal Photos pdf 1.41 MiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 External Photos External Photos pdf 1.35 MiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 ID Label/Location Info pdf March 10 2023 / March 13 2023
1 2 3 4 ID Label/Location Info pdf March 10 2023 / March 13 2023
1 2 3 4 Attestation Statements Part 2.911(d)(7) Attestation Statements pdf 29.30 KiB September 08 2023 / September 12 2023
1 2 3 4 Attstn Stmt Part 2.911(d)(5)(i) Attestation Statements pdf 75.60 KiB September 08 2023 / September 12 2023
1 2 3 4 Attstn Stmt part 2.911(d)(5)(ii) Attestation Statements pdf 74.13 KiB September 08 2023 / September 12 2023
1 2 3 4 C2PC Letter Cover Letter(s) pdf 28.68 KiB September 08 2023 / September 12 2023
1 2 3 4 Confidentiality Letter Cover Letter(s) pdf 80.09 KiB September 08 2023 / September 12 2023
1 2 3 4 LOA Letter Cover Letter(s) pdf 31.29 KiB September 08 2023 / September 12 2023
1 2 3 4 Modification Letter Antenna Location Cover Letter(s) pdf 317.72 KiB September 08 2023 / September 12 2023
1 2 3 4 SAR Report RF Exposure Info pdf 3.70 MiB September 08 2023 / September 12 2023
1 2 3 4 TSUP BT LE Test Setup Photos pdf 942.21 KiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 TSUP SAR Test Setup Photos pdf 290.95 KiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 Test Report Antenna Test Report pdf 565.95 KiB September 08 2023 / September 12 2023
1 2 3 4 Test Report BT LE Test Report pdf 746.56 KiB September 08 2023 / September 12 2023
1 2 3 4 Tune Up Procedure Parts List/Tune Up Info pdf September 08 2023 confidential
1 2 3 4 TSUP BT BR+EDR Test Setup Photos pdf 946.10 KiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 Test Report BT BR+EDR Test Report pdf 821.37 KiB September 08 2023 / September 12 2023
1 2 3 4 Test Report pdf March 10 2023 / March 13 2023
1 2 3 4 Cover Letter(s) pdf March 10 2023 / March 13 2023
1 2 3 4 Block Diagram Block Diagram pdf March 10 2023 confidential
1 2 3 4 Cover Letter(s) pdf March 10 2023 / March 13 2023
1 2 3 4 Operational Description Operational Description pdf March 10 2023 confidential
1 2 3 4 Cover Letter(s) pdf March 10 2023 / March 13 2023
1 2 3 4 Schematics Schematics pdf March 10 2023 confidential
1 2 3 4 Test Setup Photos BT BR+EDR Test Setup Photos pdf 1.44 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 Test Setup Photos SAR Test Setup Photos pdf 1.35 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 Authroization Letter Cover Letter(s) pdf 35.58 KiB March 10 2023 / March 13 2023
1 2 3 4 Test Setup Photos BT LE Test Setup Photos pdf 1.44 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 User Manual Installation Guide Users Manual pdf 4.09 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 User Manual Installation Location Users Manual pdf 192.99 KiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 User Manual Statement Users Manual pdf 1.17 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 Internal Photos Internal Photos pdf 1.41 MiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 External Photos External Photos pdf 1.35 MiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 ID Label/Location Info pdf March 10 2023 / March 13 2023
1 2 3 4 ID Label/Location Info pdf March 10 2023 / March 13 2023
1 2 3 4 Attestation Statements Part 2.911(d)(7) Attestation Statements pdf 29.30 KiB September 08 2023 / September 12 2023
1 2 3 4 Attstn Stmt Part 2.911(d)(5)(i) Attestation Statements pdf 75.60 KiB September 08 2023 / September 12 2023
1 2 3 4 Attstn Stmt part 2.911(d)(5)(ii) Attestation Statements pdf 74.13 KiB September 08 2023 / September 12 2023
1 2 3 4 C2PC Letter Cover Letter(s) pdf 28.68 KiB September 08 2023 / September 12 2023
1 2 3 4 Confidentiality Letter Cover Letter(s) pdf 80.09 KiB September 08 2023 / September 12 2023
1 2 3 4 LOA Letter Cover Letter(s) pdf 31.29 KiB September 08 2023 / September 12 2023
1 2 3 4 Modification Letter Antenna Location Cover Letter(s) pdf 317.72 KiB September 08 2023 / September 12 2023
1 2 3 4 SAR Report RF Exposure Info pdf 3.70 MiB September 08 2023 / September 12 2023
1 2 3 4 TSUP BT LE Test Setup Photos pdf 942.21 KiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 TSUP SAR Test Setup Photos pdf 290.95 KiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 Test Report Antenna Test Report pdf 565.95 KiB September 08 2023 / September 12 2023
1 2 3 4 Test Report BT LE Test Report pdf 746.56 KiB September 08 2023 / September 12 2023
1 2 3 4 TSUP BT BR+EDR Test Setup Photos pdf 946.10 KiB September 08 2023 / October 27 2023 delayed release
1 2 3 4 Test Report BT BR+EDR Test Report pdf 821.37 KiB September 08 2023 / September 12 2023
1 2 3 4 Test Report pdf March 10 2023 / March 13 2023
1 2 3 4 Cover Letter(s) pdf March 10 2023 / March 13 2023
1 2 3 4 Cover Letter(s) pdf March 10 2023 / March 13 2023
1 2 3 4 Cover Letter(s) pdf March 10 2023 / March 13 2023
1 2 3 4 Test Setup Photos BT BR+EDR Test Setup Photos pdf 1.44 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 Test Setup Photos SAR Test Setup Photos pdf 1.35 MiB March 10 2023 / September 09 2023 delayed release
1 2 3 4 Authroization Letter Cover Letter(s) pdf 35.58 KiB March 10 2023 / March 13 2023
1 2 3 4 Test Setup Photos BT LE Test Setup Photos pdf 1.44 MiB March 10 2023 / September 09 2023 delayed release

frequency equipment class purpose
1 2023-09-12 2402 ~ 2480 DTS - Digital Transmission System Class II Permissive Change
2 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
3 2023-03-13 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter Original Equipment
4 2402 ~ 2480 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 3 4 Effective 2023-09-12
1 2 3 4 2023-03-13
1 2 3 4 Applicant's complete, legal business name Cardo Systems, LTD
1 2 3 4 FCC Registration Number (FRN) 0009212010
1 2 3 4 Physical Address 101 E. Park Blvd., Suite 600 Plano, TX 75074
1 2 3 4 75074
1 2 3 4 Plano, TX
1 2 3 4 Plano, Texas 75074
1 2 3 4 United States
app s TCB Information
1 2 3 4 TCB Application Email Address t******@timcoengr.com
1 2 3 4 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 Grantee Code Q95
1 2 3 4 Equipment Product Code ER30
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 Name A******** D******
1 2 3 4 Title HW Manager
1 2 3 4 Telephone Number (972)********
1 2 3 4 Fax Number (972)********
1 2 3 4 E-mail a******@cardosystems.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)10/27/2023
1 2 3 4 09/09/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 Equipment ClassDTS - Digital Transmission System
1 2 3 4 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)UCS for LS24x
1 2 3 4 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 Modular Equipment TypeDoes not apply
1 2 3 4 Purpose / Application is forClass II Permissive Change
1 2 3 4 Original Equipment
1 2 3 4 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 Grant CommentsOutput Power listed is the maximum conducted output power. Class II Permissive Change: Changed position of antenna. Moved coaxial and 12-pin connectors. Reduced output power.
1 2 3 4 Output Power listed is the maximum conducted output power. The highest reported SAR is 1.16 W/kg. Class II Permissive Change: Changed position of antenna. Moved coaxial and 12-pin connectors. Reduced output power.
1 2 3 4 Output Power listed is the maximum conducted output power. The highest reported SAR is 1.16 W/kg.
1 2 3 4 Output Power listed is the maximum conducted output power.
1 2 3 4 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 Firm Name DEKRA TESTING AND CERTIFICATION CO., LTD. LinKou
1 2 3 4 DEKRA TESTING AND CERTIFICATION Hsin Chu Lab.
1 2 3 4 Name M**** L********
1 2 3 4 M****** H********
1 2 3 4 Telephone Number +886-******** Extension:
1 2 3 4 886-3******** Extension:
1 2 3 4 Fax Number +886-********
1 2 3 4 886-3********
1 2 3 4 E-mail m******@dekra.com
1 2 3 4 m******@dekra.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15C 2402.00000000 2480.00000000 0.0042000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C 2402.00000000 2480.00000000 0.1161000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C 2402.00000000 2480.00000000 0.1164000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C 2402.00000000 2480.00000000 0.0042000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC