happy holidays!

FCC ID: LDKEDAC92157 Cisco Catalyst 9120AX Series

by: Cisco Systems Inc latest update: 2020-10-21 model: EDAC92157

Four grants have been issued under this FCC ID from 10/25/2019 to 10/21/2020 (this is one of thirty-one releases in 2020 for this grantee). Public details available include internal & external photos, manuals, and frequency information. some products also feature user submitted or linked password defaults, drivers, troubleshooting guides, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 User Manual Users Manual pdf 2.30 MiB October 25 2019 / April 23 2020 delayed release
1 2 3 4 Int Photos Internal Photos pdf 549.52 KiB October 21 2020 / April 19 2021 delayed release
1 2 3 4 FCC ID Label ID Label/Location Info pdf 162.40 KiB October 21 2020
1 2 3 4 Authorized Signature Letter Cover Letter(s) pdf 48.26 KiB October 21 2020
1 2 3 4 C2PC Letter Cover Letter(s) pdf 71.38 KiB October 21 2020
1 2 3 4 Confidentiality Letter Cover Letter(s) pdf 95.70 KiB October 21 2020
1 2 3 4 PAG Re-Use Letter Operational Description pdf October 21 2020 confidential
1 2 3 4 Schematics Schematics pdf October 21 2020 confidential
1 2 3 4 Setup Photos (Conducted) Test Setup Photos pdf 203.47 KiB October 21 2020 / April 19 2021 delayed release
1 2 3 4 Setup Photos (Radiated) Test Setup Photos pdf 190.30 KiB October 21 2020 / April 19 2021 delayed release
1 2 3 4 Test Report (Conducted) W52 Test Report pdf 1.02 MiB October 21 2020
1 2 3 4 Test Report (Conducted) W53 Test Report pdf 1.03 MiB October 21 2020
1 2 3 4 Test Report (Conducted) W56 Test Report pdf 1.06 MiB October 21 2020
1 2 3 4 Test Report (Conducted) W58 Test Report pdf 1.02 MiB October 21 2020
1 2 3 4 Test Report (Radiated) Test Report pdf 3.07 MiB October 21 2020
1 2 3 4 Test Report (Conducted) Test Report pdf 2.17 MiB October 21 2020
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Cover Letter(s) pdf October 25 2019
1 2 3 4 Block Diagram Block Diagram pdf October 25 2019 confidential
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Ext Photos External Photos pdf October 25 2019 / April 23 2020 delayed release
1 2 3 4 Operation Description Operational Description pdf October 25 2019 confidential
1 2 3 4 PAG Re-Use Operational Description pdf October 25 2019 confidential
1 2 3 4 RF Exposure Info pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Setup Photos (DFS) Test Setup Photos pdf October 25 2019 / April 23 2020 delayed release
1 2 3 4 Software Security Declaration Operational Description pdf October 25 2019 confidential
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 Test Report pdf October 25 2019
1 2 3 4 User Manual Users Manual pdf 2.30 MiB October 25 2019 / April 23 2020 delayed release
1 2 3 4 Int Photos Internal Photos pdf 549.52 KiB October 21 2020 / April 19 2021 delayed release
1 2 3 4 FCC ID Label ID Label/Location Info pdf 162.40 KiB October 21 2020
1 2 3 4 Authorized Signature Letter Cover Letter(s) pdf 48.26 KiB October 21 2020
1 2 3 4 C2PC Letter Cover Letter(s) pdf 71.38 KiB October 21 2020
1 2 3 4 Confidentiality Letter Cover Letter(s) pdf 95.70 KiB October 21 2020
1 2 3 4 Setup Photos (Conducted) Test Setup Photos pdf 203.47 KiB October 21 2020 / April 19 2021 delayed release
1 2 3 4 Setup Photos (Radiated) Test Setup Photos pdf 190.30 KiB October 21 2020 / April 19 2021 delayed release
1 2 3 4 Test Report (Conducted) W52 Test Report pdf 1.02 MiB October 21 2020
1 2 3 4 Test Report (Conducted) W53 Test Report pdf 1.03 MiB October 21 2020
1 2 3 4 Test Report (Conducted) W56 Test Report pdf 1.06 MiB October 21 2020
1 2 3 4 Test Report (Conducted) W58 Test Report pdf 1.02 MiB October 21 2020
1 2 3 4 Test Report (Radiated) Test Report pdf 3.07 MiB October 21 2020
1 2 3 4 Test Report (Conducted) Test Report pdf 2.17 MiB October 21 2020

frequency equipment class purpose
1 2020-10-21 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX Class II Permissive Change
2 2412 ~ 2462 DTS - Digital Transmission System
3 2019-10-25 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX Original Equipment
4 2412 ~ 2462 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 3 4 Effective 2020-10-21
1 2 3 4 2019-10-25
1 2 3 4 Applicant's complete, legal business name Cisco Systems Inc
1 2 3 4 FCC Registration Number (FRN) 0004968939
1 2 3 4 Physical Address 125 West Tasman Drive
1 2 3 4 San Jose, CA
1 2 3 4 United States
app s TCB Information
1 2 3 4 TCB Application Email Address b******@baclcorp.com
1 2 3 4 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 Grantee Code LDK
1 2 3 4 Equipment Product Code EDAC92157
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 Name S**** K********
1 2 3 4 G**** T********
1 2 3 4 Title Manager, Engineering
1 2 3 4 Telephone Number 408-5********
1 2 3 4 408-5********
1 2 3 4 Fax Number 408-5********
1 2 3 4 408-5********
1 2 3 4 E-mail s******@cisco.com
1 2 3 4 g******@cisco.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)04/19/2021
1 2 3 4 04/23/2020
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 Equipment ClassNII - Unlicensed National Information Infrastructure TX
1 2 3 4 DTS - Digital Transmission System
1 2 3 4 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Cisco Catalyst 9120AX Series
1 2 3 4 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 No
1 2 3 4 Modular Equipment TypeDoes not apply
1 2 3 4 Purpose / Application is forClass II Permissive Change
1 2 3 4 Original Equipment
1 2 3 4 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 Grant CommentsClass II Permissive Change described in this filing. Output power listed is conducted. Device supports 20/40/80/160 MHz bandwidth modes and 4x4 MIMO. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 30 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. End-users and installers must be provided with antenna installations and transmitter operating conditions for satisfying RF exposure compliance.
1 2 3 4 Class II Permissive Change described in this filing. Output power listed is conducted. Device supports 20 MHz bandwidth and 4x4 MIMO. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 30 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. End-users and installers must be provided with antenna installations and transmitter operating conditions for satisfying RF exposure compliance.
1 2 3 4 Output power listed is conducted. Device supports 20/40/80/160 MHz bandwidth modes and 4x4 MIMO. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 30 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. End-users and installers must be provided with antenna installations and transmitter operating conditions for satisfying RF exposure compliance.
1 2 3 4 Output power listed is conducted. Device supports 20 MHz bandwidth and 4x4 MIMO. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 30 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. End-users and installers must be provided with antenna installations and transmitter operating conditions for satisfying RF exposure compliance.
1 2 3 4 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 Firm Name Cisco Systems, Inc.
1 2 3 4 Bay Area Compliance Laboratories Corporation
1 2 3 4 Name G****** T******
1 2 3 4 L**** T****
1 2 3 4 Telephone Number 408-5********
1 2 3 4 408-7******** Extension:
1 2 3 4 Fax Number 40852********
1 2 3 4 408 7********
1 2 3 4 E-mail g******@cisco.com
1 2 3 4 l******@baclcorp.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC MO 5180 5240 0.209
1 2 15E CC MO ND 5250 5250 0.098
1 3 15E CC MO ND 5260 5320 0.155
1 4 15E CC MO ND 5270 5310 0.204
1 5 15E CC MO ND 5500 5720 0.162
1 6 15E CC MO ND 5510 5710 0.204
1 7 15E CC MO ND 5530 5690 0.209
1 8 15E CC MO 5745 5825 0.251
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC 2402 2480 0.002
2 2 15C CC MO 2412 2462 0.282
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15E CC MO 5180 5240 0.209
3 2 15E CC MO ND 5250 5250 0.098
3 3 15E CC MO ND 5260 5320 0.155
3 4 15E CC MO ND 5270 5310 0.204
3 5 15E CC MO ND 5500 5720 0.162
3 6 15E CC MO ND 5510 5710 0.204
3 7 15E CC MO ND 5530 5690 0.209
3 8 15E CC MO 5745 5825 0.251
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2402 2480 0.002
4 2 15C CC MO 2412 2462 0.282

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC