FCC ID: LDKVEHVR2777 Cisco Catalyst 9136I Access Point

by: Cisco Systems Inc latest update: 2024-03-01 model: VEHVR2777

Four grants have been issued under this FCC ID from 07/19/2023 to 03/01/2024 (this is one of sixteen releases in 2024 for this grantee). Public details available include manuals, frequency information, and internal & external photos. some products also feature user submitted or linked troubleshooting guides, password defaults, warrantee terms, drivers, & instructions.
permalink for this FCC identifier
product lifecycle: recent release
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 User Manual Users Manual pdf 1.74 MiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Internal Photos Internal Photos pdf 5.04 MiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 External Photos External Photos pdf 565.09 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Label ID Label/Location Info pdf 361.28 KiB February 08 2024 / March 01 2024
1 2 3 4 ID Label/Location Info pdf July 05 2023 / July 19 2023
1 2 3 4 Attestation Statement part 2.911(d)(7) Attestation Statements pdf 124.19 KiB February 08 2024 / March 01 2024
1 2 3 4 Attstn Stmt part 2.911(d)(5)(i)&(ii) Attestation Statements pdf 134.77 KiB February 08 2024 / March 01 2024
1 2 3 4 Block Diagram Block Diagram pdf February 08 2024 confidential
1 2 3 4 C3PC Letter Cover Letter(s) pdf 49.62 KiB February 08 2024 / March 01 2024
1 2 3 4 Confidentiality Letter Cover Letter(s) pdf 107.58 KiB July 05 2023 / July 19 2023
1 2 3 4 Confidentiality Letter II Cover Letter(s) pdf 86.42 KiB February 08 2024 / March 01 2024
1 2 3 4 Confidentiality Request Letter Cover Letter(s) pdf 153.92 KiB March 01 2024
1 2 3 4 Attestation Statements pdf February 08 2024 / March 01 2024
1 2 3 4 Geolocation General Description Users Manual pdf February 12 2024 / August 28 2024 delayed release
1 2 3 4 Geolocation Justification Report Operational Description pdf February 08 2024 confidential
1 2 3 4 Geolocation PIA Acceptance Operational Description pdf February 08 2024 confidential
1 2 3 4 LOA Letter Cover Letter(s) pdf 123.20 KiB February 08 2024 / March 01 2024
1 2 3 4 Op Desc Software Security SDR Software/Security Inf pdf February 08 2024 confidential
1 2 3 4 Operational Description Operational Description pdf February 08 2024 confidential
1 2 3 4 RF Exposure MPE RF Exposure Info pdf 450.93 KiB February 08 2024 / March 01 2024
1 2 3 4 Schematics Schematics pdf February 08 2024 confidential
1 2 3 4 TSUP Test Setup Photos pdf 1.06 MiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Test Harness Report AFC Test Report pdf 1.73 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report Antenna Test Report pdf 2.69 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 1 Test Report pdf 5.63 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 2 Test Report pdf 5.71 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 3 Test Report pdf 5.69 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 4 Test Report pdf 5.70 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 5 Test Report pdf 5.70 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 6 Test Report pdf 3.12 MiB February 08 2024 / March 01 2024
1 2 3 4 WiFi 6E DOC Attestation Statements pdf 123.62 KiB February 08 2024 / March 01 2024
1 2 3 4 Cover Letter(s) pdf February 08 2024 / March 01 2024
1 2 3 4 Indoor Access Point Attestation Statements pdf 110.15 KiB July 05 2023 / July 19 2023
1 2 3 4 Op Desc SDR SDR Software/Security Inf pdf July 05 2023 confidential
1 2 3 4 Power of Attorney Letter Cover Letter(s) pdf 95.19 KiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 1 Test Report pdf 5.81 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 2 Test Report pdf 5.70 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 3 Test Report pdf 5.71 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 4 Test Report pdf 5.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 5 Test Report pdf 5.71 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 6 Test Report pdf 5.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 7 Test Report pdf 5.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 8 Test Report pdf 5.69 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 9 Test Report pdf 2.47 MiB July 05 2023 / July 19 2023
1 2 3 4 Attestation Statements pdf July 05 2023 / July 19 2023
1 2 3 4 Block Diagrams Block Diagram pdf July 05 2023 confidential
1 2 3 4 TSUP DTS Test Setup Photos pdf 674.24 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 TSUP DTS BLE Test Setup Photos pdf 630.99 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Test Report DTS BLE Test Report pdf 3.37 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report WLAN Part 1 Test Report pdf 4.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report WLAN Part 2 Test Report pdf 4.81 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report WLAN Part 3 Test Report pdf 1.61 MiB July 05 2023 / July 19 2023
1 2 3 4 TSUP DFS Test Setup Photos pdf 329.74 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 TSUP NII Test Setup Photos pdf 638.66 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Test Report DFS Test Report pdf 4.10 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 1 Test Report pdf 5.69 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 10 Test Report pdf 5.77 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 11 Test Report pdf 5.77 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 12 Test Report pdf 1.10 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 2 Test Report pdf 5.74 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 3 Test Report pdf 5.76 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 4 Test Report pdf 5.73 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 5 Test Report pdf 5.77 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 6 Test Report pdf 5.74 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 7 Test Report pdf 5.76 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 8 Test Report pdf 5.75 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 9 Test Report pdf 5.76 MiB July 05 2023 / July 19 2023
1 2 3 4 User Manual Users Manual pdf 1.74 MiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Internal Photos Internal Photos pdf 5.04 MiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 External Photos External Photos pdf 565.09 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Label ID Label/Location Info pdf 361.28 KiB February 08 2024 / March 01 2024
1 2 3 4 ID Label/Location Info pdf July 05 2023 / July 19 2023
1 2 3 4 Attestation Statement part 2.911(d)(7) Attestation Statements pdf 124.19 KiB February 08 2024 / March 01 2024
1 2 3 4 Attstn Stmt part 2.911(d)(5)(i)&(ii) Attestation Statements pdf 134.77 KiB February 08 2024 / March 01 2024
1 2 3 4 C3PC Letter Cover Letter(s) pdf 49.62 KiB February 08 2024 / March 01 2024
1 2 3 4 Confidentiality Letter Cover Letter(s) pdf 107.58 KiB July 05 2023 / July 19 2023
1 2 3 4 Confidentiality Letter II Cover Letter(s) pdf 86.42 KiB February 08 2024 / March 01 2024
1 2 3 4 Confidentiality Request Letter Cover Letter(s) pdf 153.92 KiB March 01 2024
1 2 3 4 LOA Letter Cover Letter(s) pdf 123.20 KiB February 08 2024 / March 01 2024
1 2 3 4 RF Exposure MPE RF Exposure Info pdf 450.93 KiB February 08 2024 / March 01 2024
1 2 3 4 TSUP Test Setup Photos pdf 1.06 MiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Test Harness Report AFC Test Report pdf 1.73 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report Antenna Test Report pdf 2.69 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 1 Test Report pdf 5.63 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 2 Test Report pdf 5.71 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 3 Test Report pdf 5.69 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 4 Test Report pdf 5.70 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 5 Test Report pdf 5.70 MiB February 08 2024 / March 01 2024
1 2 3 4 Test Report WLAN 6G 5+7 Part 6 Test Report pdf 3.12 MiB February 08 2024 / March 01 2024
1 2 3 4 WiFi 6E DOC Attestation Statements pdf 123.62 KiB February 08 2024 / March 01 2024
1 2 3 4 Indoor Access Point Attestation Statements pdf 110.15 KiB July 05 2023 / July 19 2023
1 2 3 4 Power of Attorney Letter Cover Letter(s) pdf 95.19 KiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 1 Test Report pdf 5.81 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 2 Test Report pdf 5.70 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 3 Test Report pdf 5.71 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 4 Test Report pdf 5.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 5 Test Report pdf 5.71 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 6 Test Report pdf 5.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 7 Test Report pdf 5.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 8 Test Report pdf 5.69 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report 6ID Part 9 Test Report pdf 2.47 MiB July 05 2023 / July 19 2023
1 2 3 4 Attestation Statements pdf July 05 2023 / July 19 2023
1 2 3 4 TSUP DTS Test Setup Photos pdf 674.24 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 TSUP DTS BLE Test Setup Photos pdf 630.99 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Test Report DTS BLE Test Report pdf 3.37 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report WLAN Part 1 Test Report pdf 4.72 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report WLAN Part 2 Test Report pdf 4.81 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report WLAN Part 3 Test Report pdf 1.61 MiB July 05 2023 / July 19 2023
1 2 3 4 TSUP DFS Test Setup Photos pdf 329.74 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 TSUP NII Test Setup Photos pdf 638.66 KiB July 05 2023 / January 15 2024 delayed release
1 2 3 4 Test Report DFS Test Report pdf 4.10 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 1 Test Report pdf 5.69 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 10 Test Report pdf 5.77 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 11 Test Report pdf 5.77 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 12 Test Report pdf 1.10 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 2 Test Report pdf 5.74 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 3 Test Report pdf 5.76 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 4 Test Report pdf 5.73 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 5 Test Report pdf 5.77 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 6 Test Report pdf 5.74 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 7 Test Report pdf 5.76 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 8 Test Report pdf 5.75 MiB July 05 2023 / July 19 2023
1 2 3 4 Test Report NII Part 9 Test Report pdf 5.76 MiB July 05 2023 / July 19 2023

frequency equipment class purpose
1 2024-03-01 6535 ~ 6855 6SD - 15E 6 GHz Standard Power Access Point Class III permissive change to software defined radio
2 2023-07-19 5955 ~ 7095 6ID - 15E 6 GHz Low Power Indoor Access Point Original Equipment
3 2412 ~ 2462 DTS - Digital Transmission System
4 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX

Application Forms

app s Applicant Information
1 2 3 4 Effective 2024-03-01
1 2 3 4 2023-07-19
1 2 3 4 Applicant's complete, legal business name Cisco Systems Inc
1 2 3 4 FCC Registration Number (FRN) 0004968939
1 2 3 4 Physical Address 125 West Tasman Drive
1 2 3 4 San Jose, California 95134-1706
1 2 3 4 San Jose, CA
1 2 3 4 United States
app s TCB Information
1 2 3 4 TCB Application Email Address t******@timcoengr.com
1 2 3 4 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 Grantee Code LDK
1 2 3 4 Equipment Product Code VEHVR2777
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 Name S**** K******
1 2 3 4 Title Manager, Engineering
1 2 3 4 Telephone Number 408-5********
1 2 3 4 Fax Number 408-5********
1 2 3 4 E-mail s******@cisco.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)08/28/2024
1 2 3 4 01/15/2024
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 Is this application for software defined/cognitive radio authorization?Yes
1 2 3 4 Equipment Class6SD - 15E 6 GHz Standard Power Access Point
1 2 3 4 6ID - 15E 6 GHz Low Power Indoor Access Point
1 2 3 4 DTS - Digital Transmission System
1 2 3 4 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Cisco Catalyst 9136I Access Point
1 2 3 4 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 Modular Equipment TypeDoes not apply
1 2 3 4 Purpose / Application is forClass III permissive change to software defined radio
1 2 3 4 Original Equipment
1 2 3 4 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 Grant CommentsPower listed is EIRP. Device operates with specific antennas in MIMO configurations as described in this filing. Software Defined Radio. The antennas used for this device must be installed to provide a separation distance of at least 58 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device has 20, 40, 80 and 160 MHz bandwidth modes. Class III Permissive Change: Enables 6 GHz Standard Power Access Point operation via software update.
1 2 3 4 Power listed is EIRP. Device operates with specific antennas in MIMO configurations as described in this filing. Software Defined Radio. The antennas used for this device must be installed to provide a separation distance of at least 50 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device has 20, 40, 80 and 160 MHz bandwidth modes. Device is intended for indoor use only.
1 2 3 4 Output Power listed is the maximum combined conducted output power. Software Defined Radio. Device operates with specific antennas in MIMO configurations as described in this filing. The antennas used for this device must be installed to provide a separation distance of at least 50 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device supports 20 MHz bandwidth modes. Device is intended for indoor use only.
1 2 3 4 Output Power listed is the maximum combined conducted output power. Software Defined Radio. Device operates with specific antennas in MIMO configurations as described in this filing. The antennas used for this device must be installed to provide a separation distance of at least 50 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device has 20, 40, 80 and 160 MHz bandwidth modes. Device is intended for indoor use only.
1 2 3 4 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 Firm Name Sporton International Inc. Hsinhua Laboratory
1 2 3 4 Name A******** C********
1 2 3 4 Telephone Number 886-3********
1 2 3 4 Fax Number +886-********
1 2 3 4 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC EP MO 5955 6415 3.281
1 2 15E CC EP MO 6535 6855 2.958
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC EP MO 5955.00000000 7095.00000000 0.5470000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C CC 2402 2480 0.0755
3 2 15C CC MO 2412 2462 0.2094
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15E CC MO 5180 5240 0.263
4 2 15E CC MO 5260 5320 0.1782
4 3 15E CC MO 5500 5720 0.2377
4 4 15E CC MO 5745 5825 0.3917

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC