happy holidays!

FCC ID: UDX-600149010 Wi-Fi 6 Access Point

by: Cisco Systems, Inc. latest update: 2022-09-27 model: 600149010

Three grants have been issued under this FCC ID from 09/12/2022 to 09/27/2022 (this is one of twenty-three releases in 2022 for this grantee). Public details available include frequency information, manuals, and internal & external photos. some products also feature user submitted or linked instructions, drivers, password defaults, troubleshooting guides, & warrantee terms.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 Users Manual pdf July 13 2022 / March 11 2023 delayed release
1 2 3 Internal Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 Internal Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 External Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 ID Label/Location Info pdf July 13 2022 / September 12 2022
1 2 3 C3PC Letter Cover Letter(s) pdf 106.59 KiB September 13 2022 / September 27 2022
1 2 3 Confidentiality Letter Cover Letter(s) pdf 111.29 KiB September 13 2022 / September 27 2022
1 2 3 LOA Letter Cover Letter(s) pdf 113.48 KiB September 13 2022 / September 27 2022
1 2 3 Op Desc SDR SDR Software/Security Inf pdf September 13 2022 confidential
1 2 3 Op Desc Software Security SDR Software/Security Inf pdf September 13 2022 confidential
1 2 3 Operational Description Operational Description pdf September 13 2022 confidential
1 2 3 RF Exposure MPE RF Exposure Info pdf 396.77 KiB September 13 2022 / September 27 2022
1 2 3 TPC Dec Letter Cover Letter(s) pdf 103.14 KiB September 13 2022 / September 27 2022
1 2 3 TSUP Antenna Pattern Test Setup Photos pdf 256.01 KiB September 13 2022 / March 26 2023 delayed release
1 2 3 TSUP DFS Test Setup Photos pdf 189.23 KiB September 13 2022 / March 26 2023 delayed release
1 2 3 TSUP UNII 2A, 2C Test Setup Photos pdf 236.22 KiB September 13 2022 / March 26 2023 delayed release
1 2 3 Test Report pdf September 13 2022 / September 27 2022
1 2 3 Test Report DFS Test Report pdf 1.63 MiB September 13 2022 / September 27 2022
1 2 3 Test Report UNII 2A,2C Part 1 Test Report pdf 5.30 MiB September 13 2022 / September 27 2022
1 2 3 Test Report UNII 2A,2C Part 2 Test Report pdf 934.15 KiB September 13 2022 / September 27 2022
1 2 3 Antenna Report for BT Test Report pdf 957.96 KiB August 29 2022 / September 12 2022
1 2 3 Block Diagram Block Diagram pdf July 13 2022 confidential
1 2 3 Operational Description SDR SDR Software/Security Inf pdf July 27 2022 confidential
1 2 3 Cover Letter(s) pdf July 13 2022 / September 12 2022
1 2 3 Schematics Schematics pdf July 13 2022 confidential
1 2 3 TSUP 2.4G Test Setup Photos pdf 490.63 KiB July 13 2022 / March 11 2023 delayed release
1 2 3 TSUP Antenna Patter Test Setup Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 TSUP BT Test Setup Photos pdf 489.92 KiB July 13 2022 / March 11 2023 delayed release
1 2 3 Test Report 2.4G Test Report pdf 3.59 MiB July 28 2022 / September 12 2022
1 2 3 Test Report BT Test Report pdf 1.62 MiB July 13 2022 / September 12 2022
1 2 3 Professional Installation Dec Letter Cover Letter(s) pdf 175.47 KiB July 13 2022 / September 12 2022
1 2 3 TSUP 5G UNII,3 Test Setup Photos pdf 494.36 KiB July 13 2022 / March 11 2023 delayed release
1 2 3 Test Report 5G UNII,3 Test Report pdf 5.12 MiB July 13 2022 / September 12 2022
1 2 3 Users Manual pdf July 13 2022 / March 11 2023 delayed release
1 2 3 Internal Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 Internal Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 External Photos pdf July 13 2022 / March 11 2023 delayed release
1 2 3 ID Label/Location Info pdf July 13 2022 / September 12 2022
1 2 3 C3PC Letter Cover Letter(s) pdf 106.59 KiB September 13 2022 / September 27 2022
1 2 3 Confidentiality Letter Cover Letter(s) pdf 111.29 KiB September 13 2022 / September 27 2022
1 2 3 LOA Letter Cover Letter(s) pdf 113.48 KiB September 13 2022 / September 27 2022
1 2 3 RF Exposure MPE RF Exposure Info pdf 396.77 KiB September 13 2022 / September 27 2022
1 2 3 TPC Dec Letter Cover Letter(s) pdf 103.14 KiB September 13 2022 / September 27 2022
1 2 3 TSUP Antenna Pattern Test Setup Photos pdf 256.01 KiB September 13 2022 / March 26 2023 delayed release
1 2 3 TSUP DFS Test Setup Photos pdf 189.23 KiB September 13 2022 / March 26 2023 delayed release
1 2 3 TSUP UNII 2A, 2C Test Setup Photos pdf 236.22 KiB September 13 2022 / March 26 2023 delayed release
1 2 3 Test Report pdf September 13 2022 / September 27 2022
1 2 3 Test Report DFS Test Report pdf 1.63 MiB September 13 2022 / September 27 2022
1 2 3 Test Report UNII 2A,2C Part 1 Test Report pdf 5.30 MiB September 13 2022 / September 27 2022
1 2 3 Test Report UNII 2A,2C Part 2 Test Report pdf 934.15 KiB September 13 2022 / September 27 2022
1 2 3 Antenna Report for BT Test Report pdf 957.96 KiB August 29 2022 / September 12 2022
1 2 3 Cover Letter(s) pdf July 13 2022 / September 12 2022
1 2 3 TSUP 2.4G Test Setup Photos pdf 490.63 KiB July 13 2022 / March 11 2023 delayed release
1 2 3 TSUP BT Test Setup Photos pdf 489.92 KiB July 13 2022 / March 11 2023 delayed release
1 2 3 Test Report 2.4G Test Report pdf 3.59 MiB July 28 2022 / September 12 2022
1 2 3 Test Report BT Test Report pdf 1.62 MiB July 13 2022 / September 12 2022
1 2 3 Professional Installation Dec Letter Cover Letter(s) pdf 175.47 KiB July 13 2022 / September 12 2022
1 2 3 TSUP 5G UNII,3 Test Setup Photos pdf 494.36 KiB July 13 2022 / March 11 2023 delayed release
1 2 3 Test Report 5G UNII,3 Test Report pdf 5.12 MiB July 13 2022 / September 12 2022

frequency equipment class purpose
1 2022-09-27 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX Class III Permissive Change
2 2022-09-12 2412 ~ 2462 DTS - Digital Transmission System Original Equipment
3 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX

Application Forms

app s Applicant Information
1 2 3 Effective 2022-09-27
1 2 3 2022-09-12
1 2 3 Applicant's complete, legal business name Cisco Systems, Inc.
1 2 3 FCC Registration Number (FRN) 0006884381
1 2 3 Physical Address 170 West Tasman Drive
1 2 3 San Jose, CA
1 2 3 United States
app s TCB Information
1 2 3 TCB Application Email Address t******@timcoengr.com
1 2 3 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 Grantee Code UDX
1 2 3 Equipment Product Code 600149010
app s Person at the applicant's address to receive grant or for contact
1 2 3 Name A******** L******
1 2 3 Telephone Number 415-4********
1 2 3 Fax Number 415-6********
1 2 3 E-mail r******@cisco.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)03/26/2023
1 2 3 03/11/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 Is this application for software defined/cognitive radio authorization?Yes
1 2 3 Equipment ClassNII - Unlicensed National Information Infrastructure TX
1 2 3 DTS - Digital Transmission System
1 2 3 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Wi-Fi 6 Access Point
1 2 3 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 Modular Equipment TypeDoes not apply
1 2 3 Purpose / Application is forClass III Permissive Change
1 2 3 Original Equipment
1 2 3 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 Grant CommentsSoftware Defined Radio. Output Power listed is the maximum combined conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40 and 80 MHz bandwidth modes. Class III Permissive Change: Adds Master Mode operation in U-NII Bands 2A and 2C via software revision.
1 2 3 Software Defined Radio. Output Power listed is the maximum combined conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20 MHz bandwidth modes.
1 2 3 Software Defined Radio. Output Power listed is the maximum combined conducted output power. This device must be installed and operated so as to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures, or as evaluated in this filing. This device supports 20, 40 and 80 MHz bandwidth modes.
1 2 3 Is there an equipment authorization waiver associated with this application?No
1 2 3 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 Firm Name Sporton International Inc. Hsinchu Laboratory
1 2 3 Name A******** C****
1 2 3 Telephone Number +886-********
1 2 3 Fax Number +886-********
1 2 3 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC MO 5180 5240 0.321
1 2 15E CC MO ND 5260 5320 0.239
1 3 15E CC MO ND 5500 5720 0.246
1 4 15E CC MO 5745 5825 0.61
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC MO 2412 2462 0.546
2 2 15C CC 2402 2480 0.071
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15E CC MO 5180 5240 0.321
3 2 15E CC MO 5745 5825 0.61

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC