FCC ID: UDX-600100011 Wi-Fi 6 Outdoor Access Point

by: Cisco Systems, Inc. latest update: 2023-04-24 model: 600100011

Two grants have been issued under this FCC ID on 04/24/2023 (this is one of eleven releases in 2023 for this grantee). Public details available include internal & external photos, manuals, and frequency information. some products also feature user submitted or linked password defaults, warrantee terms, instructions, troubleshooting guides, & drivers.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 User Manual Installation Guide Users Manual pdf 2.24 MiB April 06 2023 / October 21 2023 delayed release
1 2 Internal Photos Part 1 Internal Photos pdf 3.22 MiB April 06 2023 / October 21 2023 delayed release
1 2 Internal Photos Part 2 Internal Photos pdf 3.00 MiB April 06 2023 / October 21 2023 delayed release
1 2 External Photos External Photos pdf 820.33 KiB April 06 2023 / October 21 2023 delayed release
1 2 Label ID Label/Location Info pdf 663.77 KiB April 06 2023 / April 24 2023
1 2 Attestation Statements pdf April 06 2023 / April 24 2023
1 2 Attstn Stmt part 2.911(d)(5)(i)&(ii) Attestation Statements pdf 104.15 KiB April 06 2023 / April 24 2023
1 2 Block Diagram Block Diagram pdf April 06 2023 confidential
1 2 Confidentiality Letter Cover Letter(s) pdf 107.36 KiB April 06 2023 / April 24 2023
1 2 Op Desc SDR SDR Software/Security Inf pdf April 06 2023 confidential
1 2 Op Desc Software Security SDR Software/Security Inf pdf April 06 2023 confidential
1 2 Operational Description Operational Description pdf April 06 2023 confidential
1 2 Power of Attorney Letter Cover Letter(s) pdf 141.07 KiB April 06 2023 / April 24 2023
1 2 Professional Installation Dec Letter Cover Letter(s) pdf 84.45 KiB April 06 2023 / April 24 2023
1 2 RF Exposure MPE RF Exposure Info pdf 421.91 KiB April 06 2023 / April 24 2023
1 2 SDOC Attestation Letter Attestation Statements pdf 83.65 KiB April 06 2023 / April 24 2023
1 2 Schematics Schematics pdf April 06 2023 confidential
1 2 TSUP 5G (B1+4) Test Setup Photos pdf 2.87 MiB April 06 2023 / October 21 2023 delayed release
1 2 TSUP 5G (B2+3) Test Setup Photos pdf 993.62 KiB April 06 2023 / October 21 2023 delayed release
1 2 TSUP DFS Test Setup Photos pdf 298.37 KiB April 06 2023 / October 21 2023 delayed release
1 2 Test Report 5G(B1+4) Part 1 Test Report pdf 5.76 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 2 Test Report pdf 5.74 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 3 Test Report pdf 5.69 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 4 Test Report pdf 5.68 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 5 Test Report pdf 2.53 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 1 Test Report pdf 5.72 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 2 Test Report pdf 5.76 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 3 Test Report pdf 5.76 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 4 Test Report pdf 5.73 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 5 Test Report pdf 5.70 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 6 Test Report pdf 5.69 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 7 Test Report pdf 4.71 MiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-20 Test Report pdf 476.13 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-21 Test Report pdf 605.73 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-23 Test Report pdf 464.52 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-25 Test Report pdf 826.10 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-27 Test Report pdf 802.18 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MR76 Test Report pdf 931.02 KiB April 06 2023 / April 24 2023
1 2 Test Report DFS Test Report pdf 2.19 MiB April 06 2023 / April 24 2023
1 2 TSUP 2.4G Test Setup Photos pdf 2.88 MiB April 06 2023 / October 21 2023 delayed release
1 2 TSUP BLE Test Setup Photos pdf 553.83 KiB April 06 2023 / October 21 2023 delayed release
1 2 Test Report 2.4G Part 1 Test Report pdf 5.71 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 2 Test Report pdf 5.74 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 3 Test Report pdf 5.71 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 4 Test Report pdf 5.70 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 5 Test Report pdf 2.61 MiB April 06 2023 / April 24 2023
1 2 Test Report BLE Test Report pdf 3.71 MiB April 06 2023 / April 24 2023
1 2 User Manual Installation Guide Users Manual pdf 2.24 MiB April 06 2023 / October 21 2023 delayed release
1 2 Internal Photos Part 1 Internal Photos pdf 3.22 MiB April 06 2023 / October 21 2023 delayed release
1 2 Internal Photos Part 2 Internal Photos pdf 3.00 MiB April 06 2023 / October 21 2023 delayed release
1 2 External Photos External Photos pdf 820.33 KiB April 06 2023 / October 21 2023 delayed release
1 2 Label ID Label/Location Info pdf 663.77 KiB April 06 2023 / April 24 2023
1 2 Attestation Statements pdf April 06 2023 / April 24 2023
1 2 Attstn Stmt part 2.911(d)(5)(i)&(ii) Attestation Statements pdf 104.15 KiB April 06 2023 / April 24 2023
1 2 Confidentiality Letter Cover Letter(s) pdf 107.36 KiB April 06 2023 / April 24 2023
1 2 Power of Attorney Letter Cover Letter(s) pdf 141.07 KiB April 06 2023 / April 24 2023
1 2 Professional Installation Dec Letter Cover Letter(s) pdf 84.45 KiB April 06 2023 / April 24 2023
1 2 RF Exposure MPE RF Exposure Info pdf 421.91 KiB April 06 2023 / April 24 2023
1 2 SDOC Attestation Letter Attestation Statements pdf 83.65 KiB April 06 2023 / April 24 2023
1 2 TSUP 5G (B1+4) Test Setup Photos pdf 2.87 MiB April 06 2023 / October 21 2023 delayed release
1 2 TSUP 5G (B2+3) Test Setup Photos pdf 993.62 KiB April 06 2023 / October 21 2023 delayed release
1 2 TSUP DFS Test Setup Photos pdf 298.37 KiB April 06 2023 / October 21 2023 delayed release
1 2 Test Report 5G(B1+4) Part 1 Test Report pdf 5.76 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 2 Test Report pdf 5.74 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 3 Test Report pdf 5.69 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 4 Test Report pdf 5.68 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B1+4) Part 5 Test Report pdf 2.53 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 1 Test Report pdf 5.72 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 2 Test Report pdf 5.76 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 3 Test Report pdf 5.76 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 4 Test Report pdf 5.73 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 5 Test Report pdf 5.70 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 6 Test Report pdf 5.69 MiB April 06 2023 / April 24 2023
1 2 Test Report 5G(B2+3) Part 7 Test Report pdf 4.71 MiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-20 Test Report pdf 476.13 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-21 Test Report pdf 605.73 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-23 Test Report pdf 464.52 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-25 Test Report pdf 826.10 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MA-ANT-27 Test Report pdf 802.18 KiB April 06 2023 / April 24 2023
1 2 Test Report Antenna MR76 Test Report pdf 931.02 KiB April 06 2023 / April 24 2023
1 2 Test Report DFS Test Report pdf 2.19 MiB April 06 2023 / April 24 2023
1 2 TSUP 2.4G Test Setup Photos pdf 2.88 MiB April 06 2023 / October 21 2023 delayed release
1 2 TSUP BLE Test Setup Photos pdf 553.83 KiB April 06 2023 / October 21 2023 delayed release
1 2 Test Report 2.4G Part 1 Test Report pdf 5.71 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 2 Test Report pdf 5.74 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 3 Test Report pdf 5.71 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 4 Test Report pdf 5.70 MiB April 06 2023 / April 24 2023
1 2 Test Report 2.4G Part 5 Test Report pdf 2.61 MiB April 06 2023 / April 24 2023
1 2 Test Report BLE Test Report pdf 3.71 MiB April 06 2023 / April 24 2023

frequency equipment class purpose
1 2023-04-24 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX Original Equipment
2 2412 ~ 2462 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 Effective 2023-04-24
1 2 Applicant's complete, legal business name Cisco Systems, Inc.
1 2 FCC Registration Number (FRN) 0006884381
1 2 Physical Address 170 West Tasman Drive
1 2 San Jose, California 95134
1 2 United States
app s TCB Information
1 2 TCB Application Email Address t******@timcoengr.com
1 2 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 Grantee Code UDX
1 2 Equipment Product Code 600100011
app s Person at the applicant's address to receive grant or for contact
1 2 Name A****** L********
1 2 Telephone Number 415-4********
1 2 Fax Number 415-6********
1 2 E-mail r******@cisco.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)10/21/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 Is this application for software defined/cognitive radio authorization?Yes
1 2 Equipment ClassNII - Unlicensed National Information Infrastructure TX
1 2 DTS - Digital Transmission System
1 2 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Wi-Fi 6 Outdoor Access Point
1 2 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 Modular Equipment TypeDoes not apply
1 2 Purpose / Application is forOriginal Equipment
1 2 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 Grant CommentsOutput Power listed is the maximum combined conducted output power. Software Defined Radio. Professional installation required. Device operates with specific antennas in MIMO configurations as described in this filing. This device must be installed to provide a separation distance of at least 51 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device has 20, 40 and 80 MHz bandwidth modes.
1 2 Output Power listed is the maximum combined conducted output power. Software Defined Radio. Professional installation required. Device operates with specific antennas in MIMO configurations as described in this filing. This device must be installed to provide a separation distance of at least 51 cm from all persons and must not transmit simultaneously with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Users must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device supports 20 and 40 MHz bandwidth modes.
1 2 Is there an equipment authorization waiver associated with this application?No
1 2 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 Firm Name Sporton International Inc. Hsinhua Laboratory
1 2 Name A**** C******
1 2 Telephone Number 886-3********
1 2 Fax Number +886-********
1 2 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC MO 5180 5240 0.1574
1 2 15E CC MO 5260 5320 0.1648
1 3 15E CC MO 5500 5720 0.1774
1 4 15E CC MO 5745 5825 0.3412
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC 2402 2480 0.0826
2 2 15C CC MO 2412 2462 0.3006

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC