happy holidays!

FCC ID: TA8AKRC161644-3 Multi-standard remote radio

by: Ericsson AB latest update: 2023-08-22 model: AKRC161644-3

Five grants have been issued under this FCC ID from 11/24/2017 to 08/22/2023 (this is one of thirty-three releases in 2023 for this grantee). Public details available include manuals, frequency information, and internal & external photos. some products also feature user submitted or linked troubleshooting guides, password defaults, instructions, warrantee terms, & drivers.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 Authorisation letter Cover Letter(s) pdf 193.95 KiB August 21 2023 / August 22 2023
1 2 3 4 5 C2PC letter Cover Letter(s) pdf 35.24 KiB August 21 2023 / August 22 2023
1 2 3 4 5 CFR 47 2.911(d)(5) Attestation Statements pdf 198.98 KiB August 21 2023 / August 22 2023
1 2 3 4 5 CFR 47 2.911(d)(7) Attestation Statements pdf 203.59 KiB August 21 2023 / August 22 2023
1 2 3 4 5 Confidentiality request Cover Letter(s) pdf 64.34 KiB August 21 2023 / August 22 2023
1 2 3 4 5 NDA Operational Description pdf August 21 2023 confidential
1 2 3 4 5 Operating description Operational Description pdf August 21 2023 confidential
1 2 3 4 5 RF exposure declaration RF Exposure Info pdf 60.96 KiB August 21 2023 / August 22 2023
1 2 3 4 5 Test report Part3 Test Report pdf 3.74 MiB August 21 2023 / August 22 2023
1 2 3 4 5 Test report part1 Test Report pdf 4.46 MiB August 21 2023 / August 22 2023
1 2 3 4 5 Test report part2 Test Report pdf 3.41 MiB August 21 2023 / August 22 2023
1 2 3 4 5 EMC report1 Test Report pdf 1.53 MiB September 20 2021 / September 21 2021
1 2 3 4 5 EMC report2 Test Report pdf 1.34 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test Report pdf 2.67 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test report1 NB-IoT Test Report pdf 4.81 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test Report pdf 3.30 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test report2 NB-IoT Test Report pdf 1.60 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test setup photos1 Test Setup Photos pdf 344.18 KiB September 20 2021 / September 21 2021
1 2 3 4 5 Test setup photos2 Test Setup Photos pdf 343.42 KiB September 20 2021 / September 21 2021
1 2 3 4 5 Exhibit 12 Technical Circuit Description NR Operational Description pdf December 23 2019 confidential
1 2 3 4 5 Exhibit 13 Cover Letter FCC Cover Letter(s) pdf 94.43 KiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 2 FCC authorization letter Attestation Statements pdf 276.64 KiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 6 75947298 Report 09 Issue 1 Test Report pdf 1.76 MiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 7 75947298 Report 09 Test Setup Photos Exhibit Test Setup Photos pdf 256.47 KiB December 23 2019 / February 22 2020 delayed release
1 2 3 4 5 Exhibit 8 Radio Description 4415 Users Manual pdf December 23 2019 confidential
1 2 3 4 5 Exhibit 13 Request for Confidentiality 4415 B66A G2 Cover Letter(s) pdf 205.56 KiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 12 Circuit Description Radio NB-IoT Guardband Rev A Operational Description pdf November 22 2018 confidential
1 2 3 4 5 Cover Letter(s) pdf November 22 2018
1 2 3 4 5 Cover Letter(s) pdf November 22 2018
1 2 3 4 5 Test Report pdf November 22 2018
1 2 3 4 5 Test Setup Photos pdf / June 01 2019
1 2 3 4 5 Exhibit 8 Users Manual pdf November 22 2018 confidential
1 2 3 4 5 Cover Letter(s) pdf November 22 2018
1 2 3 4 5 Cover Letter(s) pdf
1 2 3 4 5 Cover Letter(s) pdf
1 2 3 4 5 Cover Letter(s) pdf
1 2 3 4 5 Cover Letter(s) pdf
1 2 3 4 5 External Photos pdf
1 2 3 4 5 ID Label/Location Info pdf
1 2 3 4 5 Test Report pdf
1 2 3 4 5 Test Report pdf
1 2 3 4 5 Test Report pdf
1 2 3 4 5 Test Report pdf
1 2 3 4 5 Test Setup Photos pdf
1 2 3 4 5 Authorisation letter Cover Letter(s) pdf 193.95 KiB August 21 2023 / August 22 2023
1 2 3 4 5 C2PC letter Cover Letter(s) pdf 35.24 KiB August 21 2023 / August 22 2023
1 2 3 4 5 CFR 47 2.911(d)(5) Attestation Statements pdf 198.98 KiB August 21 2023 / August 22 2023
1 2 3 4 5 CFR 47 2.911(d)(7) Attestation Statements pdf 203.59 KiB August 21 2023 / August 22 2023
1 2 3 4 5 Confidentiality request Cover Letter(s) pdf 64.34 KiB August 21 2023 / August 22 2023
1 2 3 4 5 RF exposure declaration RF Exposure Info pdf 60.96 KiB August 21 2023 / August 22 2023
1 2 3 4 5 Test report Part3 Test Report pdf 3.74 MiB August 21 2023 / August 22 2023
1 2 3 4 5 Test report part1 Test Report pdf 4.46 MiB August 21 2023 / August 22 2023
1 2 3 4 5 Test report part2 Test Report pdf 3.41 MiB August 21 2023 / August 22 2023
1 2 3 4 5 EMC report1 Test Report pdf 1.53 MiB September 20 2021 / September 21 2021
1 2 3 4 5 EMC report2 Test Report pdf 1.34 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test report1 NB-IoT Test Report pdf 4.81 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test report2 NB-IoT Test Report pdf 1.60 MiB September 20 2021 / September 21 2021
1 2 3 4 5 Test setup photos1 Test Setup Photos pdf 344.18 KiB September 20 2021 / September 21 2021
1 2 3 4 5 Test setup photos2 Test Setup Photos pdf 343.42 KiB September 20 2021 / September 21 2021
1 2 3 4 5 Exhibit 13 Cover Letter FCC Cover Letter(s) pdf 94.43 KiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 2 FCC authorization letter Attestation Statements pdf 276.64 KiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 6 75947298 Report 09 Issue 1 Test Report pdf 1.76 MiB December 23 2019 / January 08 2020
1 2 3 4 5 Exhibit 7 75947298 Report 09 Test Setup Photos Exhibit Test Setup Photos pdf 256.47 KiB December 23 2019 / February 22 2020 delayed release
1 2 3 4 5 Exhibit 13 Request for Confidentiality 4415 B66A G2 Cover Letter(s) pdf 205.56 KiB December 23 2019 / January 08 2020

frequency equipment class purpose
1 2023-08-22 2130 ~ 2160 TNB - Licensed Non-Broadcast Station Transmitter Class II Permissive Change
2 2021-09-21 2120 ~ 2170 TNB - Licensed Non-Broadcast Station Transmitter
3 2020-01-08 2120 ~ 2170 TNB - Licensed Non-Broadcast Station Transmitter
4 2018-11-22 2120 ~ 2170 TNB - Licensed Non-Broadcast Station Transmitter Class II permissive change or modification of presently authorized equipment
5 2017-11-24 2120 ~ 2170 TNB - Licensed Non-Broadcast Station Transmitter Original Equipment

Application Forms

app s Applicant Information
1 2 3 4 5 Effective 2023-08-22
1 2 3 4 5 2021-09-21
1 2 3 4 5 2020-01-08
1 2 3 4 5 2018-11-22
1 2 3 4 5 2017-11-24
1 2 3 4 5 Applicant's complete, legal business name Ericsson AB
1 2 3 4 5 FCC Registration Number (FRN) 0013476155
1 2 3 4 5 Physical Address PEU Radio Torshamnsgatan 23
1 2 3 4 5 PDU Radio Torshamnsgatan 23
1 2 3 4 5 PEU Radio
1 2 3 4 5 PDU Radio
1 2 3 4 5 Stockholm, N/A
1 2 3 4 5 Stockholm, N/A 164 80
1 2 3 4 5 Sweden
app s TCB Information
1 2 3 4 5 TCB Application Email Address T******@tuvsud.com
1 2 3 4 5 T******@tuv-sud.com
1 2 3 4 5 a******@babt.com
1 2 3 4 5 s******@nemko.com
1 2 3 4 5 TCB Scope B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
app s FCC ID
1 2 3 4 5 Grantee Code TA8
1 2 3 4 5 Equipment Product Code AKRC161644-3
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 Name P******** M********
1 2 3 4 5 I******** T******
1 2 3 4 5 Title Head of PEU Radio
1 2 3 4 5 Head of PDU Radio
1 2 3 4 5 Telephone Number +46 1********
1 2 3 4 5 Fax Number +46 1********
1 2 3 4 5 E-mail p******@ericsson.com
1 2 3 4 5 i******@ericsson.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:No
1 2 3 4 5 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)02/22/2020
1 2 3 4 5 01/06/2019
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 Equipment ClassTNB - Licensed Non-Broadcast Station Transmitter
1 2 3 4 5 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Multi-standard remote radio
1 2 3 4 5 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 5 Modular Equipment TypeDoes not apply
1 2 3 4 5 Purpose / Application is forClass II Permissive Change
1 2 3 4 5 Class II permissive change or modification of presently authorized equipment
1 2 3 4 5 Original Equipment
1 2 3 4 5 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?No
1 2 3 4 5 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 Grant CommentsC2PC to support 25, 30, 35 and 40 MHz NR BW. The power output listed is conducted per output port. This transmitter must only be operated in the grantees RBS systems. RF exposure is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-locating requirements of 1.1307 (b)(3).
1 2 3 4 5 The power output listed is conducted per output port. This transmitter must only be operated in the grantees RBS systems. RF exposure is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-locating requirements of 1.1307 (b)(3).
1 2 3 4 5 The power output listed is conducted per output port. This permissive change is to add NB-IoT functionality in software. This transmitter must only be operated in the grantees RBS systems. RF exposure is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-locating requirements of 1.1307 (b)(3).
1 2 3 4 5 Output power is conducted per antenna port. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307(b)(3).
1 2 3 4 5 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 Firm Name Intertek Testing Services Shanghai
1 2 3 4 5 TUV SUD Sverige AB
1 2 3 4 5 TUV SUD Product Service
1 2 3 4 5 Nemko Canada Inc. (Ottawa)
1 2 3 4 5 Name L****** X****
1 2 3 4 5 M****** J****
1 2 3 4 5 C**** N******
1 2 3 4 5 Telephone Number +86 2********
1 2 3 4 5 46(0)********
1 2 3 4 5 00-44********
1 2 3 4 5 613-7******** Extension:
1 2 3 4 5 Fax Number 00-44********
1 2 3 4 5 613-7********
1 2 3 4 5 E-mail l******@intertek.com
1 2 3 4 5 m******@tuv-sud.co.uk
1 2 3 4 5 c******@nemko.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 27 MO 2112.4 2152.5 40 0.05 ppm 5M00F9W
1 2 27 MO 2112.5 2177.5 40 0.05 ppm 5M00W7D
1 3 27 MO 2115 2175 42 0.05 ppm 9M40W7D
1 4 27 MO 2117.5 2172.5 42 0.05 ppm 14M0W7D
1 5 27 MO 2120 2170 44 0.05 ppm 18M5W7D
1 6 27 MO 2110.2 2179.8 18 0.05 ppm 230KW7D
1 7 27 MO 2112.5 2177.5 40 0.05 ppm 4M47W7D
1 8 27 MO 2115 2175 40 0.05 ppm 9M30W7D
1 9 27 MO 2117.5 2172.5 40 0.05 ppm 14M1W7D
1 1 27 MO 2120 2170 40 0.05 ppm 18M9W7D
1 11 27 MO 2110 2180 40 0.05 ppm 37M8W7D
1 12 27 MO 2115 2175 40 0.05 ppm 9M43W7D
1 13 27 MO 2117.5 2172.5 40 0.05 ppm 14M4W7D
1 14 27 MO 2120 2170 40 0.05 ppm 19M2W7D
1 15 27 MO 2122.5 2167.5 40 0.05 ppm 23M7W7D
1 16 27 MO 2125 2165 40 0.05 ppm 28M5W7D
1 17 27 MO 2127.5 2162.5 40 0.05 ppm 33M5W7D
1 18 27 MO 2130 2160 40 0.05 ppm 38M5W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 27 MO 2112.4 2152.5 40 0.05 ppm 5M00F9W
2 2 27 MO 2112.5 2177.5 40 0.05 ppm 5M00W7D
2 3 27 MO 2115 2175 42 0.05 ppm 9M40W7D
2 4 27 MO 2117.5 2172.5 42 0.05 ppm 14M0W7D
2 5 27 MO 2120 2170 44 0.05 ppm 18M5W7D
2 6 27 MO 2110.2 2179.8 40 0.05 ppm 230KW7D
2 7 27 MO 2112.5 2177.5 40 0.05 ppm 4M47W7D
2 8 27 MO 2115 2175 40 0.05 ppm 9M30W7D
2 9 27 MO 2117.5 2172.5 40 0.05 ppm 14M1W7D
2 1 27 MO 2120 2170 40 0.05 ppm 18M9W7D
2 11 27 MO 2110 2180 40 0.05 ppm 37M8W7D
2 12 27 MO 2115 2175 40 0.05 ppm 9M43W7D
2 13 27 MO 2117.5 2172.5 40 0.05 ppm 14M4W7D
2 14 27 MO 2120 2170 40 0.05 ppm 19M2W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 27 MO 2112.4 2152.6 40 0.05 ppm 5M00F9W
3 2 27 MO 2112.5 2177.5 40 0.05 ppm 5M00W7D
3 3 27 MO 2115 2175 42 0.05 ppm 9M40W7D
3 4 27 MO 2117.5 2172.5 42 0.05 ppm 14M0W7D
3 5 27 MO 2120 2170 44 0.05 ppm 18M5W7D
3 6 27 MO 2110.2 2179.8 18 0.05 ppm 230KW7D
3 7 27 MO 2112.5 2177.5 40 0.05 ppm 4M47W7D
3 8 27 MO 2115 2175 40 0.05 ppm 9M30W7D
3 9 27 MO 2117.5 2172.5 40 0.05 ppm 14M1W7D
3 1 27 MO 2120 2170 40 0.05 ppm 18M9W7D
3 11 27 MO 2110 2180 40 0.05 ppm 37M8W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 27 MO 2112.4 2152.6 40 0.05 ppm 5M00F9W
4 2 27 MO 2112.5 2177.5 40 0.05 ppm 5M00W7D
4 3 27 MO 2115 2175 42 0.05 ppm 9M40W7D
4 4 27 MO 2117.5 2172.5 42 0.05 ppm 14M0W7D
4 5 27 MO 2120 2170 44 0.05 ppm 18M5W7D
4 6 27 MO 2110.2 2179.8 18 0.05 ppm 230KW7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 27 MO 2112.5 2177.5 40 0.1 ppm 5M00W7D
5 2 27 MO 2115 2175 40 0.1 ppm 10M0W7D
5 3 27 MO 2117.5 2172.5 40 0.1 ppm 15M0W7D
5 4 27 MO 2120 2170 40 0.1 ppm 20M0W7D
5 5 27 MO 2112.4 2152.6 40 0.1 ppm 5M00F9W

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC