ECL4248-2401 Installation Manual EUCAST Co., Ltd. 4F, Sungok bldg, 262, Hwangsaeul-ro, Bundang-gu, Seonam-si, Gyeonggi-do, Korea 13595 Tel: +82-31-706-5261 Revision History 1.0 Version Date Author/Editor Comment 2021.07.30 2021.11.05 2021.11.06 2021.11.09 2021.11.10 HW HW HW HW HW Initial draft version Re-vision Re-vision FCC notice change Mechanical dimension value correction This page intentionally left blank INDEX Figure index .................................................................................................................. iii Table index .................................................................................................................... iii 1 Introduction ..................................................................................................................i 1.1 System SPEC. ........................................................................................................................................................... i 1.1.1 ECL4248-2401 Exterior ..................................................................................................................................... i 1.1.2 Volume & Expansion .......................................................................................................................................... i 1.1.3 Electricity consumption. .................................................................................................................................... i 1.1.4 Size and Weight ................................................................................................................................................. ii 1.1.5 Environmental condition .................................................................................................................................... ii 1.1.6 Physical Interface ............................................................................................................................................... ii 1.1.6.1 Interface Overview ..................................................................................................................................... ii 1.1.6.2 Detailed Definition of Interface ................................................................................................................. iii 2 Start installation ..........................................................................................................1 2.1 Installation and Workspace ....................................................................................................................................... 1 2.2 Survey of installation area ........................................................................................................................................ 2 2.3 Grounding work ........................................................................................................................................................ 2 2.4 Movement of equipment ........................................................................................................................................... 3 3 System installation .....................................................................................................4 3.1 ECL4248-2401 components ..................................................................................................................................... 4 3.2 ECL4248-2401 installation ....................................................................................................................................... 4 3.2.1 Install order ECL4248-2401 in Pole .................................................................................................................. 4 3.2.1.1 Bracket drawing and material preparation .................................................................................................. 4 3.2.1.2 Fix the Pole to the ground ........................................................................................................................... 5 3.2.1.3 Fix Bracket to Pole using U-bolt................................................................................................................. 5 3.2.1.4 Assembling the ECL4248-2401 .................................................................................................................. 6 3.2.1 How to install the ECL4248-2401 on the wall................................................................................................... 9 3.2.1.1 Material confirmation ................................................................................................................................. 9 3.2.1.2 Fix to the wall ............................................................................................................................................. 9
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- i -
- i -
3.3 Installing GPS Antenna and Cable ......................................................................................................................... 11 3.3.1 GPS antenna installation parts ......................................................................................................................... 11 3.3.2 Installation GPS cable ...................................................................................................................................... 12 3.3.3 Installation of Arrestor ..................................................................................................................................... 13 3.4 Installation B/H Link Cable .................................................................................................................................... 13 3.5 Installation Electrical Power Cable ......................................................................................................................... 14 3.5.1.1 Connection between ECL4248-2401 and Rectifier .................................................................................. 14
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- ii -
- ii -
Figure index Figure 1. ECL4248-2401 Exterior .................................................................................................................................... i Figure 2. Interface Ports .................................................................................................................................................. ii Figure 3. ECL4248-2401 Installation sample. ............................................................................................................... 1 Figure 4. Compositions of ECL4248-2401 Mechanical ................................................................................................. 4 Figure 5. Bracket Plan (upper surface) ........................................................................................................................... 5 Figure 6. Bracket Plan (the front and side) .................................................................................................................... 5 Figure 7. Bracket Installation Example (Poll Mount) ................................................................................................... 6 Figure 8. Assembly Sequence ........................................................................................................................................... 7 Figure 9. Assembly order ................................................................................................................................................. 7 Figure 10. Complete Assemblies ...................................................................................................................................... 8 Figure 11. Bracket Installation Example (Wall Mount) .............................................................................................. 10 Table index Table 1.Electricity Consumption ..................................................................................................................................... ii Table 2. Size and Weight .................................................................................................................................................. ii Table 3. Environmental Requirements ........................................................................................................................... ii Table 4. Interface overview ............................................................................................................................................. iii Table5. RF cable attenuation characteristics (example) ............................................................................................. 12 Table 6. B/H cable connector type ................................................................................................................................. 13
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- iii -
- iii -
This document provides basic installation guide for ECL4248-2401 system, the LTE base station The installation manual is being updated continuously. There may be some minor differences due to the continued upgrades and modifications to the system. Please contact us to clarify any confusion arising from such differences. The Copyright on this installation manual belongs to EUCAST Co., Ltd. This installation manual shall not be reproduced, distributed, amended in any way without the written consent of EUCAST Co., Ltd. Please contact us for more detailed information on any items described in this installation manual. 4F, Sungok Building, 262, Hwangsaeul-ro, Bundang-gu, Seongnam-si, Gyeonggi-
Preface Purpose of the Manual system. Amendments Copyright Contact Address do, Korea, 13595 Telephone
+82-31-706-5261 Caution and Other Marks This Equipment complies with part 15.19 (a)(3) of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- iv -
- iv -
The intentional or unintentional radiator of this equipment shall not be changed or modified without the approval of EUCAST. NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense. This equipment complies with FCC RF Radiation exposure limits set forth in an uncontrolled environment. This device and its antenna(s) must not be co-
located or operating in conjunction with any other antenna or transmitter. This equipment should be installed to operate with a minimum distance of 100.2 cm between the radiator and the end-user's body. Changes or modifications not expressly approved by EUCAST could void the user's authority to operate the equipment.
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- v -
- v -
1 Introduction 1.1 System SPEC. 1.1.1 ECL4248-2401 Exterior Figure 1. ECL4248-2401 Exterior 1.1.2 Volume & Expansion ECL4248-2401 units. ECL4248-2401 supports 1FA / Omni service. Configuration for 1FA/3Sector can be with 3 1.1.3 Electricity consumption. ECL4248-2401 uses -48 DC Voltage. for modules. system of rectifier. The -48 DC Voltage is transformed into a lower DC Voltage in the ECL4248-2401 and distributed ECL4248-2401 does not support the Battery. If you need it, use the battery charge/discharge ITEM Specification Input Power Voltage
-48VDC Maximum Power Consumption(typ.) avg. 65 Watts, peak 80 Watts
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- i -
- i -
Table 1.Electricity Consumption 1.1.4 Size and Weight Size (mm) Weight (Kg) ITEM Specification 210mm x336mm x109mm (without bracket) Typ. 7.5 kg Table 2. Size and Weight 1.1.5 Environmental condition Section Range Standard Operating Temperature
-30 ~ 50C Storage Temperature
-30 ~ 70C Humidity 10% to 95%
Table 3. Environmental Requirements 1.1.6 Physical Interface 1.1.6.1 Interface Overview Figure 2. Interface Ports
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- ii -
- ii -
ANT1/ANT2: RF antenna connection port. CPL1/CPL2: output coupled port(-40dB) DC INPUT: -48VDC input port RE/SY: 10MHz/Sync test port LED PWR/STS: PWR/STATUS LED GPS: GPS antenna connection port BH_C: Backhaul port (RJ45, 1000base-T) BH_O: Backhaul port (Optic, 1000base-X) LMT: Local management tool, debug and monitoring port (100base-T) 1.1.6.2 Detailed Definition of Interface No Name Connector Type To/From Descriptions ANT1/ANT2 N-type Female RF Output Port, Main/Diversity CPL1/CPL2 SMA Female Output Coupled Port DC INPUT MS3102A 10SL-4P Rectifier Mating: MS3106A 10SL-4S RE/SY SMA Female LED PWR/STS LED RE: 10MHz test Port SY: Sync test Port PWR: Power LED STS: Status LED RF Antenna
/RF Arrestor
GPS Antenna
/GPS Arrestor 6 GPS N-type Female GPS Antenna Connecting Port 7 BH_C DH-24-J/RJ45/213/SX-43-404 Backhaul 8 BH_O DH-24-J/LC/213/SX-43-402 Backhaul 9 LMT DH-24-J/RJ45/213/SX-43-404
Backhaul Port, RJ45 Mating: DH-24-C/RJ45/015/PE-43-001 Backhaul Port, Optic (LC type) Mating: DH-24-C/LC/015/PE-43-002 Local Management Tool Port, RJ45 Mating: DH-24-C/RJ45/015/PE-43-001 Table 4. Interface overview 1 2 3 4 5
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- iii -
- iii -
= CONFIDENTIAL =
EUCAST Co. Ltd. All rights Reserved
- iv -
- iv -
2 Start installation 2.1 Installation and Workspace Figure 3. ECL4248-2401 Installation sample. ECL4248-2401 cannot open the door in the field, and it is recommended to replace it with another ECL4248-2401 in case of failure. as follows. Considering the size and workspace of the ECL4248-2401, the minimum space to be secured is We recommend that the ECL4248-2401 is installed at a height of more than 1 m above the floor.
= CONFIDENTIAL =
- 1 -
EUCAST Co. Ltd. All rights Reserved To investigate the site, you prepare drawing of the place where the system is installed, and carry Check the route and method of transporting the system to the installation location 2.2 Survey of installation area Installer must survey install area before installation out preliminary inspection on the following matters installation space and workspace Direction of equipment installation External interface situation Electrical capacity and wiring situation Status of System Expansion Location and wiring method of RF antenna and GPS antenna Environment of additional equipment (rectifier, battery etc.) Environment that affects safety of installer Whether or not to install a lightning rod Plan to install communication grounding Whether or not to install a GPS Arrestor and RF Arrestor 2.3 Grounding work Grounding work protects the system from heavy thunderstorm, surge voltage, high frequency voltage &
current. also, grounding work provides electrostatic discharge path to protect operator and system. Grounding works should be done with short and thick wire from the ground.
= CONFIDENTIAL =
- 2 -
EUCAST Co. Ltd. All rights Reserved Grounding wire burial depth: 75 cm or more Resistance value from earth BS grounding: 5 ohm or less Arrestor grounding: 10 ohm or less Refer to Ground Connections. Confirm grounding work It is the most important way to protect the system and operation person from electrical shocks. Please confirm that construction was done properly after completing grounding work. 2.4 Movement of equipment When transporting racks and materials. That must be transported according to the method which be displayed on packaging Specially when it is displayed in the top and bottom, do not carry in the reverse. It is necessary to minimize the occurrence of physical shocks during transportation.
= CONFIDENTIAL =
- 3 -
EUCAST Co. Ltd. All rights Reserved 3 System installation ECL4248-2401 Physical Interface To install cable, please refer ECL4248-2401 Interface Ports Figure and description
(paragraph 1.1.6) necessarily. 3.1 ECL4248-2401 components A) ECL4248-2401 Main Mechanical B) Brackets Figure 4. Compositions of ECL4248-2401 Mechanical 3.2 ECL4248-2401 installation ECL4248-2401's bracket that can be installed in Pole or Wall are provided. (Pole and U - Bolts must be prepared by operation user and installer) The procedure for installing the ECL4248-2401 is as follows (Pole mount or Wall mount) :
3.2.1 Install order ECL4248-2401 in Pole 3.2.1.1 Bracket drawing and material preparation The size of the U-Bolt to fix the bracket to the pole is decided by considering the hole size, the position of the bracket drawing, and the diameter of the pole. (60 ~ 80mm recommended)
= CONFIDENTIAL =
- 4 -
EUCAST Co. Ltd. All rights Reserved Figure 5. Bracket Plan (upper surface) Figure 6. Bracket Plan (the front and side) 3.2.1.2 Fix the Pole to the ground 3.2.1.3 Fix Bracket to Pole using U-bolt. Fix the top and bottom of bracket using 2 U-bolt.
= CONFIDENTIAL =
- 5 -
EUCAST Co. Ltd. All rights Reserved Figure 7. Bracket Installation Example (Poll Mount) 3.2.1.4 Assembling the ECL4248-2401 fastening screw.)
(1) Assemble the Solar Cover on the ECL4248-2401 chassis as follows. (Fix both sides of the Solar Cover with the
= CONFIDENTIAL =
- 6 -
EUCAST Co. Ltd. All rights Reserved Figure 8. Assembly Sequence In case of delivery of ECL4248-2401, Solar Cover is assembled and delivered. On site, Solar Cover is attached to the main chassis. additional Solar Cover work is not needed.
(2) Assemble the bracket at the ECL4248-2401 as follows. Figure 9. Assembly order 1) Lift the ECL4248-2401. 2) Align the ECL4248-2401 and the bracket to match 12 holes. (Left, right, up and down move) 3) Fix 8 point using the fixing screws in Bracket.
= CONFIDENTIAL =
- 7 -
EUCAST Co. Ltd. All rights Reserved Figure 10. Complete Assemblies
= CONFIDENTIAL =
- 8 -
EUCAST Co. Ltd. All rights Reserved 3.2.1 How to install the ECL4248-2401 on the wall 3.2.1.1 Material confirmation Item EA Discription Anchor-Bolt & Nut Punch 4 1 ECL4248-2401 Bracket 1 3.2.1.2 Fix to the wall In the Bracket drawing, check the position of 4 Hole positions. In the same place, create a hole in the wall using Hammer Drill. After inserting the bolt into the Anchor hole, hit Anchor Punch with Hammer and fix it strongly
= CONFIDENTIAL =
- 9 -
EUCAST Co. Ltd. All rights Reserved Fix the Nut and the Bolt using Wrench. Figure 11. Bracket Installation Example (Wall Mount)
= CONFIDENTIAL =
- 10 -
EUCAST Co. Ltd. All rights Reserved 3.3 Installing GPS Antenna and Cable 3.3.1 GPS antenna installation parts GPS antenna installation parts GPS Coaxial Cable, Connector for GPS Coaxial Cable, Ground Panel and Pole for GPS Antenna must be prepared by the operator or installer. Item EA Discription GPS antenna Small Pole Clamp GPS Arrestor 1 1 1 1 GPS Antenna Set Pole Local Recommendation: 45 ~ 55 mm GPS cable (Recommendation LMR400) GPS cable connector Panel Local Local Local Considerations when installing GPS antenna The GPS antenna has a built-in low-noise amplifier (LNA) with a gain of about 36dB.
= CONFIDENTIAL =
- 11 -
EUCAST Co. Ltd. All rights Reserved antenna. GPS antennas should be spaced at least 1m to prevent interference between the two Because the GPS antenna receives +5V DC from the receiver inside the ECL4248-2401, the connection point between the GPS antenna and the feeder cable must be waterproof.
(The GPS antenna connector has to be waterproofed using Insulation tube.) If a cable short circuit occurs, damage to the power supply of the equipment. Because GPS is a device that receives very low level signals, it needs to be separated from the surrounding radio sources (another communication equipment, RF antennas, etc.). Installing the GPS antenna closely to the ground terminal of the building or the external conductor, the signal power is attenuated. so, install it as far as possible. The GPS antenna must always be level. 3.3.2 Installation GPS cable The GPS feeder is selected that the loss is less than 30dB at 1575.42MHz. The loss value of the cable is different depending on the Cable Type and Using Cable length. The cable must be selected and used according to the installation environment. Cable Type Attenuation in 1.57542GHz RC8 RG58 RG213 RG214 0.31 dB/m 0.63 dB/m 0.35 dB/m 0.328 dB/m LMR400 0.203 dB/m Table5. RF cable attenuation characteristics (example)
= CONFIDENTIAL =
- 12 -
EUCAST Co. Ltd. All rights Reserved Using of RF Coaxial cable No all-Coaxial cables have the same Attenuation and Shielding Quality. depending on production company and model. 3.3.3 Installation of Arrestor We recommend installing Arrestor to prevent lightning strikes. Arrestor connects to the proximity point where the cable enters the building. 3.4 Installation B/H Link Cable The B / H Link supports either Copper Ethernet or Optic Ethernet Link. Check your B/H Link type. Cable Connector Type To ETH B/H OPTIC B/H Cable Type Max Length Cable Length UTP Cable:
CAT5E/6E
(Recommend) Optic Cable :
DH-24-C/RJ45/015/PE-43-001 and shield
< 100m User Defined Single Mode Optic
(Recommend) Fiber DH-24-C/LC/015/PE-43-002 Related SFP Transceiver,
>10Km User Defined Table 6. B/H cable connector type
= CONFIDENTIAL =
- 13 -
EUCAST Co. Ltd. All rights Reserved 3.5 Installation Electrical Power Cable 3.5.1.1 Connection between ECL4248-2401 and Rectifier ECL4248-2401 does not support input power on / off switch function. on / off switch function uses a rectifier. For other method, switch box is installed outside. ECL4248-2401 Input Power: -48 VDC Cable diameter: Maximum 16 AWG Connector type Power Cable Connector Remark MS3106A 10SL-4S Connector Pin Map: A (GND), B (+48V)
= CONFIDENTIAL =
- 14 -
EUCAST Co. Ltd. All rights Reserved 1 2 This page intentionally left blank
=Confidential= SeAH Networks Co., Ltd. All right Reserved