FCC ID: A4RG0DZQ Phone

by: Google LLC latest update: 2023-02-27 model: G0DZQ

Eight grants have been issued under this FCC ID on 02/27/2023 (this is one of ninety-seven releases in 2023 for this grantee). Public details available include manuals, frequency information, and internal & external photos. some products also feature user submitted or linked troubleshooting guides, password defaults, warrantee terms, drivers, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 8 Users Manual pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Internal Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 External Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 ID Label/Location Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Block Diagram r1 Block Diagram pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Operational Description 1 Operational Description pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Operational Description 1 r1 Operational Description pdf December 21 2022 confidential
1 2 3 4 5 6 7 8 Operational Description 2 r1 Operational Description pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Operational Description 2 r2 Operational Description pdf February 16 2023 confidential
1 2 3 4 5 6 7 8 Operational Description 3 Operational Description pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Schematics Schematics pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Tune Up Procedure Parts List/Tune Up Info pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf September 13 2023 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf February 23 2023 / February 27 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf February 23 2023 / February 27 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf February 19 2023 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 21 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 21 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 21 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf January 16 2023 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf January 26 2023 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DTS BLE Test Report pdf 5.42 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DTS WIFI 2.4G r1 1 Test Report pdf 5.46 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DTS WIFI 2.4G r1 2 Test Report pdf 4.05 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup DTS BLE Test Setup Photos pdf 583.23 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup DTS WIFI 2.4G r1 Test Setup Photos pdf 561.46 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup Part 1 SAR Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup Part 1 SAR r1 Test Setup Photos pdf January 16 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf January 26 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Operational Description 1 SDR Software/Security Inf pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 Operational Description 1 r1 SDR Software/Security Inf pdf December 21 2022 confidential
1 2 3 4 5 6 7 8 Operational Description 6 Operational Description pdf January 16 2023 confidential
1 2 3 4 5 6 7 8 TR 6XD 1 Test Report pdf 5.30 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 6XD 2 Test Report pdf 5.28 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 6XD 3 Test Report pdf 5.46 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 6XD 4 Test Report pdf 736.98 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Tsup 6XD Test Setup Photos pdf 623.21 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 UNII 6GHz Attestation Attestation Statements pdf 281.50 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Operational Description 4 Operational Description pdf December 19 2022 confidential
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE 96.47 LTE Test Report pdf 581.10 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE 96.47 Sub6 Test Report pdf 873.59 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 1 Test Report pdf 5.37 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 2 Test Report pdf 5.45 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 3 Test Report pdf 5.33 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 4 Test Report pdf 3.36 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 1 Test Report pdf 5.27 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 2 Test Report pdf 5.30 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 3 Test Report pdf 5.37 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 4 Test Report pdf 5.30 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 5 Test Report pdf 1.08 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Tsup CBE 96.47 LTE Test Setup Photos pdf 233.43 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup CBE 96.47 Sub6 Test Setup Photos pdf 213.07 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup CBE LTE Test Setup Photos pdf 639.76 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup CBE Sub6 Test Setup Photos pdf 635.46 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 TR DSS 1 Test Report pdf 5.43 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DSS 2 Test Report pdf 4.70 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Tsup DSS Test Setup Photos pdf 583.76 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 TR 5GM 10 Test Report pdf 5.18 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 11 Test Report pdf 4.86 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 7 Test Report pdf 5.06 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 8 Test Report pdf 4.67 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 9 Test Report pdf 5.49 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Users Manual pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Internal Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 External Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 ID Label/Location Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf September 13 2023 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf February 23 2023 / February 27 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf February 23 2023 / February 27 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Attestation Statements pdf February 19 2023 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 21 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 21 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf January 26 2023 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Report pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DTS BLE Test Report pdf 5.42 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DTS WIFI 2.4G r1 1 Test Report pdf 5.46 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DTS WIFI 2.4G r1 2 Test Report pdf 4.05 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup DTS BLE Test Setup Photos pdf 583.23 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup DTS WIFI 2.4G r1 Test Setup Photos pdf 561.46 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf January 26 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 TR 6XD 1 Test Report pdf 5.30 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 6XD 2 Test Report pdf 5.28 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 6XD 3 Test Report pdf 5.46 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 6XD 4 Test Report pdf 736.98 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Tsup 6XD Test Setup Photos pdf 623.21 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 UNII 6GHz Attestation Attestation Statements pdf 281.50 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 RF Exposure Info pdf December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE 96.47 LTE Test Report pdf 581.10 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE 96.47 Sub6 Test Report pdf 873.59 KiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 1 Test Report pdf 5.37 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 2 Test Report pdf 5.45 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 3 Test Report pdf 5.33 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE LTE 4 Test Report pdf 3.36 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 1 Test Report pdf 5.27 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 2 Test Report pdf 5.30 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 3 Test Report pdf 5.37 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 4 Test Report pdf 5.30 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR CBE Sub6 5 Test Report pdf 1.08 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Tsup CBE 96.47 LTE Test Setup Photos pdf 233.43 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup CBE 96.47 Sub6 Test Setup Photos pdf 213.07 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup CBE LTE Test Setup Photos pdf 639.76 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup CBE Sub6 Test Setup Photos pdf 635.46 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Test Setup Photos pdf December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 TR DSS 1 Test Report pdf 5.43 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR DSS 2 Test Report pdf 4.70 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 Tsup DSS Test Setup Photos pdf 583.76 KiB December 19 2022 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 TR 5GM 10 Test Report pdf 5.18 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 11 Test Report pdf 4.86 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 7 Test Report pdf 5.06 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 8 Test Report pdf 4.67 MiB December 19 2022 / February 27 2023
1 2 3 4 5 6 7 8 TR 5GM 9 Test Report pdf 5.49 MiB December 19 2022 / February 27 2023

frequency equipment class purpose
1 2023-02-27 2412 ~ 2472 DTS - Digital Transmission System Original Equipment
2 5955 ~ 7095 6XD - 15E 6 GHz Low Power Indoor Client
3 3570 ~ 3679.98 CBE - Citizens Band End User Devices
4 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
5 37050 ~ 39950 5GM - Part 30 Mobile Transmitter
6 3750 ~ 3930 PCE - PCS Licensed Transmitter held to ear
7 5845 ~ 5885 NII - Unlicensed National Information Infrastructure TX
8 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 8 Effective 2023-02-27
1 2 3 4 5 6 7 8 Applicant's complete, legal business name Google LLC
1 2 3 4 5 6 7 8 FCC Registration Number (FRN) 0020499539
1 2 3 4 5 6 7 8 Physical Address 1600 Amphitheatre Parkway
1 2 3 4 5 6 7 8 Mountain View, CA
1 2 3 4 5 6 7 8 United States
app s TCB Information
1 2 3 4 5 6 7 8 TCB Application Email Address K******@sporton-usa.com
1 2 3 4 5 6 7 8 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 8 B2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95, 97, & 101 (all below 3 GHz)
1 2 3 4 5 6 7 8 B4: Microwave, Millimeter Wave Band and Citizens Broadband Radio Services equipment in 47 CFR Parts 25, 30, 74, 90, 95, 96, 97, 101 (all above 3 GHz)
1 2 3 4 5 6 7 8 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 7 8 A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
app s FCC ID
1 2 3 4 5 6 7 8 Grantee Code A4R
1 2 3 4 5 6 7 8 Equipment Product Code G0DZQ
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 8 Name A**** D******
1 2 3 4 5 6 7 8 Telephone Number 650-7********
1 2 3 4 5 6 7 8 Fax Number 650-2********
1 2 3 4 5 6 7 8 E-mail a******@google.com
app s Technical Contact
1 2 3 4 5 6 7 8 Firm Name Sporton International Inc. Wensan Laboratory
1 2 3 4 5 6 7 8 Sporton International Inc.
1 2 3 4 5 6 7 8 Name I******** C********
1 2 3 4 5 6 7 8 Physical Address No.58, Aly. 75, Ln. 564 Wenha 3rd Rd. Guishan Dist
1 2 3 4 5 6 7 8 No.58, Aly. 75, Ln. 564 Wenhua 3rd Rd. Guishan Dis
1 2 3 4 5 6 7 8 Taoyuan, 333
1 2 3 4 5 6 7 8 Taiwan
1 2 3 4 5 6 7 8 Telephone Number 886-3********
1 2 3 4 5 6 7 8 E-mail i******@sporton.com.tw
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 8 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)08/26/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 8 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 8 Equipment ClassDTS - Digital Transmission System
1 2 3 4 5 6 7 8 6XD - 15E 6 GHz Low Power Indoor Client
1 2 3 4 5 6 7 8 CBE - Citizens Band End User Devices
1 2 3 4 5 6 7 8 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 8 5GM - Part 30 Mobile Transmitter
1 2 3 4 5 6 7 8 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 8 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 8 DXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 8 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Phone
1 2 3 4 5 6 7 8 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 8 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 8 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 8 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 8 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 8 Grant CommentsOutput power listed is conducted. This device supports 2x2 MIMO for Wi-Fi operations. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, product specific (wireless router), and simultaneous transmission use conditions are 1.17 W/kg, 0.55 W/kg, 0.51 W/kg, and 1.52 W/kg, respectively. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 8 Output power listed is EIRP. This device only supports 2x2 MIMO and operating bandwidths of 20 MHz, 40 MHz and 80 MHz and device 6 GHz operation is intended for indoor use only. RF Exposure compliance for body-worn operating configurations is limited to the specific configurations tested in this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance.
1 2 3 4 5 6 7 8 Output power listed is EIRP for Part 96. The device supports 5/10/15/20 MHz bandwidths in LTE Band 48. 5GNR Sub 6GHz supports 10/15/20/40 MHz bandwidths in n48. Powers listed are for the highest power and widest bandwidth within each band for QPSK and QAM modulations for single carrier operations. SAR compliance for body-worn operating configurations is limited to the specific configurations tested in this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), and simultaneous transmission use conditions are 0.99 W/kg, 0.61 W/kg, 0.83 W/kg, and 1.59 W/kg, respectively. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 8 Output power listed is peak conducted. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, product specific (wireless router), and simultaneous transmission use conditions are 0.40 W/kg, 0.34 W/kg, 0.26 W/kg, and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 Output power listed is EIRP. This device supports bandwidths of 50, 100, and 200 (2CC of 100 MHz) MHz for NR bands n260/n261. RF Exposure compliance for body-worn operating configurations is limited to the specific configurations tested in this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance.
1 2 3 4 5 6 7 8 Output power listed is ERP for operations below 1 GHz, EIRP for operations above 1 GHz and conducted power for Part 90S (814-824 MHz). LTE supports 5/10 MHz bandwidths in Band 13, Band 14, Band 17, and Band 30; 5/10/15/20 MHz bandwidths in Band 7, Band 71, Band 38, and Band 41; 1.4/3/5/10 MHz bandwidths in Band 5, and Band 12; 1.4/3/5/10/15 MHz bandwidths in Band 26; 1.4/3/5/10/15/20 MHz bandwidths in Band 2, Band 4, Band 25, and Band 66. 5GNR Sub 6GHz supports 5/10/15/20 MHz bandwidths in n2/n5/n71; 5/10/15 MHz bandwidths in n12; 5/10 MHz bandwidths in n14/n30; 10/15/20 MHz bandwidths in n38; 5/10/15/20/25/30/40 MHz bandwidths in n25/n66; 5/10/15/20/25/30/40/50 MHz bandwidths in n7; 10/15/20/30/40/50/60/70/80/90/100 MHz bandwidths in n41; 10/15/20/25/30/40/50/60/70/80/90/100 MHz bandwidths in n77. This device supports downlink carrier aggregation for inter-band and intra-band, uplink carrier aggregation for intra-band in LTE Band 5/7/66/41. Powers listed are for the highest power and widest bandwidth within each band for QPSK and QAM modulations for single carrier operations and, where applicable, widest bandwidth and highest power for intra-band uplink carrier aggregation. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, product specific (wireless router), product specific (10g) and simultaneous transmission use conditions are 1.19 W/kg, 0.99 W/kg, 0.99 W/kg, 2.96 W/kg (10g), and 1.59 W/kg, respectively. T-coil 5G sub 6 bands appraised as equivalent LTE connections. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 8 Output power listed is conducted and EIRP for UNII-4. This device only supports 2x2 MIMO and operating bandwidths of 20 MHz, 40 MHz and 80 MHz. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, product specific (wireless router), product specific (10g) and simultaneous transmission use conditions are 1.15 W/kg, 0.49 W/kg, 0.39 W/kg, 1.62 W/kg (10g) and 1.59 W/kg, respectively. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 8 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 8 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 8 Firm Name SPORTON International Inc.
1 2 3 4 5 6 7 8 Name A****** C********
1 2 3 4 5 6 7 8 Telephone Number +886-******** Extension:
1 2 3 4 5 6 7 8 Fax Number +886-********
1 2 3 4 5 6 7 8 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15C CC 2402 2480 0.0759
1 2 15C CC HC MO 2412 2472 0.1977
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC MO 5955.00000000 7095.00000000 0.0282000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 96 HC 3560 3690 0.1387 2.5 ppm 17M9G7D
3 2 96 HC 3560 3690 0.1132 2.5 ppm 17M9W7D
3 3 96 HC 3570 3679.98 0.1396 2.5 ppm 38M0G7D
3 4 96 HC 3570 3679.98 0.0555 2.5 ppm 38M1W7D
3 5 96 HC 3555 3694.98 0.1521 2.5 ppm 8M59G7D
3 6 96 HC 3555 3694.98 0.1208 2.5 ppm 8M55W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2402.00000000 2480.00000000 0.0946000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 3 37050 39950 0.6501 2.5 ppm 190MG7D
5 2 3 37050 39950 0.4487 2.5 ppm 190MW7D
5 3 3 37050 39950 1.546 2.5 ppm 91M4G7D
5 4 3 37050 39950 0.869 2.5 ppm 91M3W7D
5 5 3 27550 28300 0.875 2.5 ppm 190MG7D
5 6 3 27550 28300 0.7211 2.5 ppm 190MW7D
5 7 3 27525 28325 2.9854 2.5 ppm 46M2G7D
5 8 3 27550 28300 1.5704 2.5 ppm 91M5W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 22H HC 824.2 848.8 0.3069 2.5 ppm 248KGXW
6 2 22H HC 824.2 848.8 0.0933 2.5 ppm 254KG7W
6 3 22H HC 826.4 846.6 0.0469 2.5 ppm 4M18F9W
6 4 24E HC 1850.2 1909.8 0.4764 2.5 ppm 248KGXW
6 5 24E HC 1850.2 1909.8 0.1652 2.5 ppm 249KG7W
6 6 24E HC 1852.4 1907.6 0.1611 2.5 ppm 4M18F9W
6 7 27 HC 1712.4 1752.6 0.1419 2.5 ppm 4M18F9W
6 8 24E HC 1860 1900 0.1371 2.5 ppm 17M9G7D
6 9 24E HC 1860 1900 0.1159 2.5 ppm 17M9W7D
6 1 24E HC 1860 1905 0.133 2.5 ppm 17M9G7D
6 11 24E HC 1860 1905 0.1117 2.5 ppm 17M9W7D
6 12 27 HC 1720 1745 0.1197 2.5 ppm 18M0G7D
6 13 27 HC 1720 1745 0.1062 2.5 ppm 17M9W7D
6 14 22H HC 829 844 0.0514 2.5 ppm 9M05G7D
6 15 22H HC 829 844 0.0443 2.5 ppm 9M07W7D
6 16 27 HC 2510 2560 0.2489 2.5 ppm 17M9G7D
6 17 27 HC 2510 2560 0.2138 2.5 ppm 17M9W7D
6 18 27 HC 2507.5 2562.5 0.2143 2.5 ppm 13M4W7D
6 19 27 HC 704 711 0.0416 2.5 ppm 9M01G7D
6 2 27 HC 704 711 0.0357 2.5 ppm 9M55W7D
6 21 27 HC 700.5 714.5 0.0368 2.5 ppm 2M76W7D
6 22 27 HC 782 782 0.0511 2.5 ppm 9M05G7D
6 23 27 HC 782 782 0.0438 2.5 ppm 9M01W7D
6 24 27 HC 779.5 784.5 0.0451 2.5 ppm 4M50W7D
6 25 27 HC 709 711 0.0417 2.5 ppm 9M01G7D
6 26 27 HC 709 711 0.0356 2.5 ppm 9M05W7D
6 27 27 HC 706.5 713.5 0.0368 2.5 ppm 4M48W7D
6 28 22H HC 831.5 841.5 0.0506 2.5 ppm 13M4G7D
6 29 22H HC 831.5 841.5 0.044 2.5 ppm 13M5W7D
6 3 22H HC 825.5 847.5 0.0511 2.5 ppm 2M76G7W
6 31 27 HC 2580 2610 0.3724 2.5 ppm 17M9G7D
6 32 27 HC 2580 2610 0.3373 2.5 ppm 17M9W7D
6 33 27 HC 2577.5 2612.5 0.3459 2.5 ppm 13M4W7D
6 34 27 HC 2506 2680 0.3581 2.5 ppm 17M9G7D
6 35 27 HC 2506 2680 0.3273 2.5 ppm 17M9W7D
6 36 27 HC 2310 2310 0.1928 2.5 ppm 9M07G7D
6 37 27 HC 2310 2310 0.1683 2.5 ppm 9M05W7D
6 38 27 HC 1720 1770 0.1211 2.5 ppm 17M9G7D
6 39 27 HC 1720 1770 0.103 2.5 ppm 17M9W7D
6 4 27 HC 673 688 0.0438 2.5 ppm 17M9G7D
6 41 27 HC 673 688 0.0383 2.5 ppm 17M9W7D
6 42 9 HC 793 793 0.0522 2.5 ppm 9M07G7D
6 43 9 HC 793 793 0.0446 2.5 ppm 9M03W7D
6 44 9 HC 821.5 824 0.2844 2.5 ppm 13M5G7D
6 45 9 HC 821.5 824 0.2399 2.5 ppm 13M4W7D
6 46 9 HC 814.7 824 0.2858 2.5 ppm 1M11G7D
6 47 9 HC 815.5 824 0.2466 2.5 ppm 2M72W7D
6 48 22H HC 829 844 0.0402 2.5 ppm 18M7G7D
6 49 22H HC 829 844 0.0338 2.5 ppm 18M8W7D
6 5 22H HC 826.5 847.4 0.0415 2.5 ppm 7M54G7D
6 51 22H HC 826.5 847.4 0.0435 2.5 ppm 7M56W7D
6 52 27 HC 1715 1775 0.1377 2.5 ppm 18M7G7D
6 53 27 HC 1715 1775 0.1268 2.5 ppm 18M9W7D
6 54 27 HC 1712.5 1777.5 0.2037 2.5 ppm 9M35G7D
6 55 27 HC 1712.5 1777.5 0.1758 2.5 ppm 9M33W7D
6 56 27 HC 1720 1770 0.1416 2.5 ppm 37M8G7D
6 57 27 HC 1720 1770 0.1219 2.5 ppm 38M0W7D
6 58 27 HC 1713.3 1770 0.1528 2.5 ppm 23M5G7D
6 59 27 HC 1717.8 1770 0.1321 2.5 ppm 32M9W7D
6 6 27 HC 2510 2560 0.1641 2.5 ppm 37M6G7D
6 61 27 HC 2510 2560 0.1426 2.5 ppm 37M3W7D
6 62 27 HC 2507.8 2560 0.2393 2.5 ppm 32M9G7D
6 63 27 HC 2510 2562.2 0.2099 2.5 ppm 32M7W7D
6 64 27 HC 2580 2610 0.3404 2.5 ppm 37M6G7D
6 65 27 HC 2580 2610 0.2773 2.5 ppm 38M0W7D
6 66 27 HC 2577.5 2612.5 0.3428 2.5 ppm 28M7G7D
6 67 27 HC 2577.5 2612.5 0.2805 2.5 ppm 28M9W7D
6 68 27 HC 2506 2680 0.0671 2.5 ppm 37M6G7D
6 69 27 HC 2506 2680 0.0548 2.5 ppm 38M0W7D
6 7 27 HC 2503.5 2684.7 0.0735 2.5 ppm 23M6G7D
6 71 27 HC 2503.5 2684.7 0.0582 2.5 ppm 23M6W7D
6 72 24E HC 1860 1900 0.1641 2.5 ppm 19M0G7D
6 73 24E HC 1860 1900 0.1327 2.5 ppm 19M0W7D
6 74 24E HC 1855 1905 0.1671 2.5 ppm 9M30G7D
6 75 22H HC 834 839 0.0668 2.5 ppm 19M0G7D
6 76 22H HC 834 839 0.0552 2.5 ppm 18M9W7D
6 77 27 HC 2525 2545 0.2979 2.5 ppm 48M3G7D
6 78 27 HC 2525 2545 0.2382 2.5 ppm 48M4W7D
6 79 27 HC 2520 2550 0.2404 2.5 ppm 38M8W7D
6 8 27 HC 706.5 708.5 0.0536 2.5 ppm 14M2G7D
6 81 27 HC 706.5 708.5 0.0437 2.5 ppm 14M2W7D
6 82 9 HC 793 793 0.0575 2.5 ppm 9M27G7D
6 83 9 HC 793 793 0.0469 2.5 ppm 9M27W7D
6 84 9 HC 790.5 795.5 0.0615 2.5 ppm 4M49G7D
6 85 9 HC 790.5 795.5 0.0474 2.5 ppm 4M51W7D
6 86 24E HC 1870 1895 0.1479 2.5 ppm 38M7G7D
6 87 24E HC 1870 1895 0.1189 2.5 ppm 38M8W7D
6 88 24E HC 1852.5 1912.5 0.1538 2.5 ppm 4M50G7D
6 89 24E HC 1855 1910 0.1191 2.5 ppm 9M26W7D
6 9 27 HC 2310 2310 0.1799 2.5 ppm 9M24G7D
6 91 27 HC 2310 2310 0.1419 2.5 ppm 9M28W7D
6 92 27 HC 2307.5 2312.5 0.1432 2.5 ppm 4M49W7D
6 93 27 HC 2580 2610 0.2911 2.5 ppm 18M2G7D
6 94 27 HC 2580 2610 0.2153 2.5 ppm 18M3W7D
6 95 27 HC 2546.01 2640 0.4178 2.5 ppm 97M5G7D
6 96 27 HC 2546.01 2640 0.3296 2.5 ppm 97M1W7D
6 97 27 HC 2541 2644.98 0.4188 2.5 ppm 87M4G7D
6 98 27 HC 2541 2644.98 0.3404 2.5 ppm 87M3W7D
6 99 27 HC 1730 1760 0.1549 2.5 ppm 38M8G7D
6 1 27 HC 1730 1760 0.1321 2.5 ppm 38M8W7D
6 101 27 HC 673 688 0.0565 2.5 ppm 18M9G7D
6 102 27 HC 673 688 0.0465 2.5 ppm 19M0W7D
6 103 27 HC 3750 3930 0.3548 2.5 ppm 97M1G7D
6 104 27 HC 3750 3930 0.2541 2.5 ppm 97M3W7D
6 105 27 HC 3745.02 3934.98 0.3631 2.5 ppm 87M4G7D
6 106 27 HC 3500.01 3500.01 0.3251 2.5 ppm 97M2G7D
6 107 27 HC 3500.01 3500.01 0.2404 2.5 ppm 97M1W7D
6 108 27 HC 3480 3519.99 0.3436 2.5 ppm 57M9G7D
6 109 27 HC 3465 3534.99 0.2612 2.5 ppm 27M8W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15E CC HC MO 5180 5240 0.1552
7 2 15E CC HC MO 5260 5320 0.15
7 3 15E CC HC MO 5500 5720 0.1517
7 4 15E CC HC MO 5745 5825 0.1452
7 5 15E CC HC MO 5845 5885 0.1589
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
8 1 15C CC 13.56000000 13.56000000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC