FCC ID: A4RG6QU3 Phone

by: Google LLC latest update: 2020-09-01 model: G6QU3

Seven grants have been issued under this FCC ID on 09/01/2020 (this is one of seventy-six releases in 2020 for this grantee). Public details available include internal & external photos, frequency information, and manuals. some products also feature user submitted or linked password defaults, troubleshooting guides, drivers, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 User Manual 20200812 Users Manual pdf 455.74 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 Internal photos Internal Photos pdf 1.23 MiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 External photos External Photos pdf 851.84 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 Label Info ID Label/Location Info pdf 40.55 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Block Diagram 20200812 Block Diagram pdf August 14 2020 confidential
1 2 3 4 5 6 7 Confidentiality Letter - signed Cover Letter(s) pdf 162.25 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Power of Attorney Letter Cover Letter(s) pdf 136.86 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Operational Description 1 20200814 Operational Description pdf August 14 2020 confidential
1 2 3 4 5 6 7 Operational Description 2 20200814 Operational Description pdf August 14 2020 confidential
1 2 3 4 5 6 7 Operational Description 3 Operational Description pdf August 21 2020 confidential
1 2 3 4 5 6 7 Tune-up Procedure Parts List/Tune Up Info pdf August 14 2020 confidential
1 2 3 4 5 6 7 Schematics Schematics pdf August 14 2020 confidential
1 2 3 4 5 6 7 FCC Part 15C BLE Report 20200812 Test Report pdf 3.07 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15C BLE Setup Photo Test Setup Photos pdf 651.67 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15C WLAN2.4G Report Test Report pdf 4.45 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15C WLAN2.4G Setup Photo Test Setup Photos pdf 619.02 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC RF Exposure for mobile condition RF Exposure Info pdf 406.44 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix A Test Report pdf 351.08 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix B Test Report pdf 1.66 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix C Test Report pdf 4.48 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix D Test Setup Photos pdf 81.93 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 HAC RF Appendix E - signed Cover Letter(s) pdf 93.87 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Report Test Report pdf 674.67 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC T-Coil Appendix A size reduce Test Report pdf 4.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC T-Coil Appendix B Test Report pdf 508.01 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC T-Coil Appendix C Test Setup Photos pdf 86.59 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 HAC T-Coil Report Test Report pdf 770.55 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report RF Exposure Info pdf 4.62 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix A RF Exposure Info pdf 4.15 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix B-1 RF Exposure Info pdf 4.83 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix B-2 RF Exposure Info pdf 2.24 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix C-1 RF Exposure Info pdf 4.81 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix C-2 RF Exposure Info pdf 5.30 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix D RF Exposure Info pdf 1.93 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix E Test Setup Photos pdf 235.02 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 Part 2 FCC RF Exposure Report 20200814 RF Exposure Info pdf 1.98 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 RF Exposure Info pdf August 14 2020 / September 01 2020
1 2 3 4 5 6 7 RF Exposure Info. 20200830 v1 - Part0 RF Exposure Report R02 RF Exposure Info pdf 1.70 MiB August 31 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E Co-location Report Test Report pdf 1.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E Co-location Setup Photo Test Setup Photos pdf 381.63 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15E DFS Report Test Report pdf 800.07 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E DFS Setup Photo Test Setup Photos pdf 195.62 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15E WLAN B1-3 Report 1 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E WLAN B1-3 Report 2 Test Report pdf 1.23 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E WLAN B4 Report Test Report pdf 2.82 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part15E WLAN B1-3 Setup Photo Test Setup Photos pdf 620.44 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15E WLAN B4 Setup Photo Test Setup Photos pdf 623.42 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 22.24.27 GSM, WCDMA, CDMA Report Test Report pdf 3.30 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 GSM, WCDMA, CDMA Setup Photo Test Setup Photos pdf 557.47 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 1 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 10 Test Report pdf 5.30 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 11 Test Report pdf 5.33 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 12 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 13 Test Report pdf 5.29 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 14 Test Report pdf 5.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 15 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 16 Test Report pdf 5.35 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 17 Test Report pdf 5.42 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 18 Test Report pdf 5.45 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 19 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 2 Test Report pdf 5.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 20 Test Report pdf 5.40 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 21 Test Report pdf 5.39 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 22 Test Report pdf 5.33 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 23 Test Report pdf 5.33 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 24 Test Report pdf 5.28 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 25 Test Report pdf 5.48 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 26 Test Report pdf 5.47 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 27 Test Report pdf 5.42 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 28 Test Report pdf 5.46 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 29 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 3 Test Report pdf 5.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 30 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 31 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 32 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 33 Test Report pdf 5.43 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 34 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 35 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 36 Test Report pdf 5.31 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 37 Test Report pdf 4.98 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 4 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 5 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 6 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 7 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 8 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 9 Test Report pdf 5.31 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Setup Photo Test Setup Photos pdf 1.58 MiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 1 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 2 Test Report pdf 5.40 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 3 Test Report pdf 5.43 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 4 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 5 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 6 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 7 Test Report pdf 5.40 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 8 Test Report pdf 4.00 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 27D LTE B30 Report 20200812 Test Report pdf 4.57 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 27D LTE B30 Setup Photo Test Setup Photos pdf 208.56 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 90R LTE B14 Report 20200812 Test Report pdf 5.31 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 90R LTE B14 Setup Photo Test Setup Photos pdf 363.31 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 90S CDMA BC10 Setup Photo Test Setup Photos pdf 217.59 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 90S LTE B26 Setup Photo Test Setup Photos pdf 428.71 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 User Manual 20200812 Users Manual pdf 455.74 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 Internal photos Internal Photos pdf 1.23 MiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 External photos External Photos pdf 851.84 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 Label Info ID Label/Location Info pdf 40.55 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Confidentiality Letter - signed Cover Letter(s) pdf 162.25 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Power of Attorney Letter Cover Letter(s) pdf 136.86 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15C BLE Report 20200812 Test Report pdf 3.07 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15C BLE Setup Photo Test Setup Photos pdf 651.67 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15C WLAN2.4G Report Test Report pdf 4.45 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15C WLAN2.4G Setup Photo Test Setup Photos pdf 619.02 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC RF Exposure for mobile condition RF Exposure Info pdf 406.44 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix A Test Report pdf 351.08 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix B Test Report pdf 1.66 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix C Test Report pdf 4.48 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Appendix D Test Setup Photos pdf 81.93 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 HAC RF Appendix E - signed Cover Letter(s) pdf 93.87 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC RF Report Test Report pdf 674.67 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC T-Coil Appendix A size reduce Test Report pdf 4.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC T-Coil Appendix B Test Report pdf 508.01 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 HAC T-Coil Appendix C Test Setup Photos pdf 86.59 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 HAC T-Coil Report Test Report pdf 770.55 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report RF Exposure Info pdf 4.62 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix A RF Exposure Info pdf 4.15 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix B-1 RF Exposure Info pdf 4.83 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix B-2 RF Exposure Info pdf 2.24 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix C-1 RF Exposure Info pdf 4.81 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix C-2 RF Exposure Info pdf 5.30 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix D RF Exposure Info pdf 1.93 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 Part 1 FCC SAR Report Appendix E Test Setup Photos pdf 235.02 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 Part 2 FCC RF Exposure Report 20200814 RF Exposure Info pdf 1.98 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 RF Exposure Info. 20200830 v1 - Part0 RF Exposure Report R02 RF Exposure Info pdf 1.70 MiB August 31 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E Co-location Report Test Report pdf 1.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E Co-location Setup Photo Test Setup Photos pdf 381.63 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15E DFS Report Test Report pdf 800.07 KiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E DFS Setup Photo Test Setup Photos pdf 195.62 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15E WLAN B1-3 Report 1 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E WLAN B1-3 Report 2 Test Report pdf 1.23 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 15E WLAN B4 Report Test Report pdf 2.82 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part15E WLAN B1-3 Setup Photo Test Setup Photos pdf 620.44 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 15E WLAN B4 Setup Photo Test Setup Photos pdf 623.42 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 22.24.27 GSM, WCDMA, CDMA Report Test Report pdf 3.30 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 GSM, WCDMA, CDMA Setup Photo Test Setup Photos pdf 557.47 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 1 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 10 Test Report pdf 5.30 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 11 Test Report pdf 5.33 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 12 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 13 Test Report pdf 5.29 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 14 Test Report pdf 5.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 15 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 16 Test Report pdf 5.35 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 17 Test Report pdf 5.42 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 18 Test Report pdf 5.45 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 19 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 2 Test Report pdf 5.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 20 Test Report pdf 5.40 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 21 Test Report pdf 5.39 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 22 Test Report pdf 5.33 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 23 Test Report pdf 5.33 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 24 Test Report pdf 5.28 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 25 Test Report pdf 5.48 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 26 Test Report pdf 5.47 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 27 Test Report pdf 5.42 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 28 Test Report pdf 5.46 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 29 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 3 Test Report pdf 5.41 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 30 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 31 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 32 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 33 Test Report pdf 5.43 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 34 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 35 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 36 Test Report pdf 5.31 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 37 Test Report pdf 4.98 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 4 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 5 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 6 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 7 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 8 Test Report pdf 5.34 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Report 9 Test Report pdf 5.31 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 LTE Setup Photo Test Setup Photos pdf 1.58 MiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 1 Test Report pdf 5.49 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 2 Test Report pdf 5.40 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 3 Test Report pdf 5.43 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 4 Test Report pdf 5.38 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 5 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 6 Test Report pdf 5.50 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 7 Test Report pdf 5.40 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 22.24.27 Sub 6G Report 8 Test Report pdf 4.00 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 27D LTE B30 Report 20200812 Test Report pdf 4.57 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 27D LTE B30 Setup Photo Test Setup Photos pdf 208.56 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 90R LTE B14 Report 20200812 Test Report pdf 5.31 MiB August 14 2020 / September 01 2020
1 2 3 4 5 6 7 FCC Part 90R LTE B14 Setup Photo Test Setup Photos pdf 363.31 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 90S CDMA BC10 Setup Photo Test Setup Photos pdf 217.59 KiB August 14 2020 / February 28 2021 delayed release
1 2 3 4 5 6 7 FCC Part 90S LTE B26 Setup Photo Test Setup Photos pdf 428.71 KiB August 14 2020 / February 28 2021 delayed release

frequency equipment class purpose
1 2020-09-01 2412 ~ 2462 DTS - Digital Transmission System Original Equipment
2 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
3 2580 ~ 2610 PCE - PCS Licensed Transmitter held to ear
4 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
5 37050 ~ 39950 5GM - Part 30 Mobile Transmitter
6 3560 ~ 3690 CBE - Citizens Band End User Devices
7 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 Effective 2020-09-01
1 2 3 4 5 6 7 Applicant's complete, legal business name Google LLC
1 2 3 4 5 6 7 FCC Registration Number (FRN) 0020499539
1 2 3 4 5 6 7 Physical Address 1600 Amphitheatre Parkway
1 2 3 4 5 6 7 Mountain View, CA
1 2 3 4 5 6 7 United States
app s TCB Information
1 2 3 4 5 6 7 TCB Application Email Address L******@ul.com
1 2 3 4 5 6 7 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 7 B4: Microwave, Millimeter Wave Band and Citizens Broadband Radio Services equipment in 47 CFR Parts 25, 30, 74, 90, 95, 96, 97, 101 (all above 3 GHz)
1 2 3 4 5 6 7 B2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95, 97, & 101 (all below 3 GHz)
1 2 3 4 5 6 7 A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
app s FCC ID
1 2 3 4 5 6 7 Grantee Code A4R
1 2 3 4 5 6 7 Equipment Product Code G6QU3
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 Name J****** M******
1 2 3 4 5 6 7 Telephone Number 650-2********
1 2 3 4 5 6 7 Fax Number 1-650********
1 2 3 4 5 6 7 E-mail j******@google.com
app s Technical Contact
1 2 3 4 5 6 7 Firm Name Sporton International Inc.
1 2 3 4 5 6 7 Name I****** C********
1 2 3 4 5 6 7 Physical Address No. 52, Huaya 1st Rd., Guishan Dist.
1 2 3 4 5 6 7 Taoyuan, 333
1 2 3 4 5 6 7 Taiwan
1 2 3 4 5 6 7 Telephone Number 886-3********
1 2 3 4 5 6 7 Fax Number 886-3********
1 2 3 4 5 6 7 E-mail e******@sporton.com.tw
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)02/28/2021
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 Equipment ClassDTS - Digital Transmission System
1 2 3 4 5 6 7 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 5GM - Part 30 Mobile Transmitter
1 2 3 4 5 6 7 CBE - Citizens Band End User Devices
1 2 3 4 5 6 7 DXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Phone
1 2 3 4 5 6 7 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 Grant CommentsOutput power listed is conducted. This device supports 2x2 MIMO for Wi-Fi operations which support 20MHz channel bandwidths. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, hotspot, and simultaneous transmission use conditions are 0.55 W/kg, 0.59 W/kg, 0.59 W/kg, and 1.59 W/kg, respectively. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 Output power listed is conducted. This device supports 2x2 MIMO and operating bandwidths of 20 MHz, 40 MHz and 80 MHz. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, hotspot, extremity (hand 10g) and simultaneous transmission use conditions are 0.58 W/kg, 0.58 W/kg, 0.45 W/kg,1.43 W/kg(10g) and 1.59 W/kg, respectively. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 Output power listed is ERP for operations below 1 GHz, EIRP for operations above 1 GHz and conducted power for Part 90S (814-824 MHz). LTE supports 5/10 MHz bandwidths in Band 13, Band 14, Band 17, and Band 30; 5/10/15/20 MHz bandwidths in Band 7, Band 71, Band 38, and Band 41; 1.4/3/5/10 MHz bandwidths in Band 5, and Band 12; 1.4/3/5/10/15 MHz bandwidths in Band 26; 1.4/3/5/10/15/20 MHz bandwidths in Band 2, Band 4, Band 25, and Band 66. 5G NR; 5/10/15/20 MHz bandwidths in Band n2, n5, n25, n66, n71; 5/10/15MHz bandwidth in band n12. This device supports downlink carrier aggregation, intra-band uplink carrier aggregation (Band 5/7/41/66 CA). Powers listed are for the highest power and widest bandwidth within each band for QPSK and QAM modulations for single carrier operations and, where applicable, widest bandwidth and highest power for intra-band uplink carrier aggregation. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, hotspot, and simultaneous transmission use conditions are 1.20 W/kg, 1.20 W/kg, 1.00 W/kg, and 1.59 W/kg, respectively. This device contains functions that are not operational in U.S. Territories; filings under this FCC ID are approved only for U.S. operations. HAC Rating M3 / T4 - 2011
1 2 3 4 5 6 7 Output power listed is peak conducted. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. The highest reported SAR values for head, body-worn accessory, hotspot, and simultaneous transmission use conditions are 0.24 W/kg, 0.39 W/kg, 0.39 W/kg, and 1.56 W/kg, respectively.
1 2 3 4 5 6 7 Output power listed is EIRP. This device supports bandwidths of 50, 100, and 100+100 MHz for NR bands n261/n260. RF Exposure compliance for body-worn operations is limited to the specific configurations tested for this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10 mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure.
1 2 3 4 5 6 7 Output power listed is EIRP for Part 96. LTE Band 48 supports uplink carrier aggregation as documented in this filing. Values listed are for highest power and widest bandwidth for each emission designator (QPSK and QAM) for single carrier and for Carrier Aggregation. SAR compliance for body-worn operating configurations is limited to the specific configurations tested in this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, hotspot, and simultaneous transmission use conditions are 0.28 W/kg, 1.20 W/kg, 1.00 W/kg, and 1.59 W/kg, respectively. HAC Rating: M3 T4 - 2011. This device also contains functions that are not operational in U.S. Territories. This filing is only applicable for US operations.
1 2 3 4 5 6 7 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 Firm Name SPORTON International Inc.
1 2 3 4 5 6 7 Name A****** C****
1 2 3 4 5 6 7 Telephone Number 886-3******** Extension:
1 2 3 4 5 6 7 Fax Number 886-3********
1 2 3 4 5 6 7 E-mail a******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15C CC 2402 2480 0.013
1 2 15C CC HC MO 2412 2462 0.176
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC HC MO 5180 5240 0.122
2 2 15E CC HC MO 5260 5320 0.119
2 3 15E CC HC MO 5500 5720 0.135
2 4 15E CC HC MO 5745 5825 0.138
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 22H HC 824.2 848.8 0.532 2.5 ppm 244KGXW
3 2 22H HC 824.2 848.8 0.126 2.5 ppm 247KG7W
3 3 22H HC 826.4 846.6 0.073 2.5 ppm 4M16F9W
3 4 22H HC 824.7 848.31 0.075 2.5 ppm 1M28F9W
3 5 24E HC 1850.2 1909.8 1.449 2.5 ppm 244KGXW
3 6 24E HC 1850.2 1909.8 0.586 2.5 ppm 251KG7W
3 7 24E HC 1852.4 1907.6 0.455 2.5 ppm 4M15F9W
3 8 24E HC 1851.25 1908.75 0.437 2.5 ppm 1M28F9W
3 9 27 HC 1712.4 1752.6 0.395 2.5 ppm 4M15F9W
3 1 9 HC 817.9 823.1 0.281 2.5 ppm 1M28F9W
3 11 27 HC 2310 2310 0.159 2.5 ppm 9M01G7D
3 12 27 HC 2310 2310 0.135 2.5 ppm 9M03W7D
3 13 27 HC 2307.5 2312.5 0.136 2.5 ppm 4M50W7D
3 14 9 HC 793 793 0.074 2.5 ppm 9M01G7D
3 15 9 HC 793 793 0.063 2.5 ppm 9M05W7D
3 16 9 HC 821.5 821.5 0.299 2.5 ppm 13M4G7D
3 17 9 HC 821.5 821.5 0.247 2.5 ppm 13M5W7D
3 18 9 HC 815.5 822.5 0.256 2.5 ppm 2M72W7D
3 19 24E HC 1860 1900 0.443 2.5 ppm 17M9G7D
3 2 24E HC 1860 1900 0.368 2.5 ppm 17M9W7D
3 21 24E HC 1852.5 1907.5 0.378 2.5 ppm 4M50W7D
3 22 24E HC 1860 1905 0.438 2.5 ppm 17M9G7D
3 23 24E HC 1860 1905 0.371 2.5 ppm 17M9W7D
3 24 24E HC 1855 1910 0.378 2.5 ppm 9M01W7D
3 25 27 HC 1720 1745 0.355 2.5 ppm 17M9G7D
3 26 27 HC 1720 1745 0.304 2.5 ppm 17M9W7D
3 27 22H HC 829 844 0.08 2.5 ppm 9M11G7D
3 28 22H HC 829 844 0.068 2.5 ppm 9M03W7D
3 29 22H HC 826.5 846.5 0.068 2.5 ppm 4M51W7D
3 3 27 HC 2510 2560 0.431 2.5 ppm 17M9G7D
3 31 27 HC 2510 2560 0.372 2.5 ppm 18M0W7D
3 32 27 HC 2507.5 2562.5 0.375 2.5 ppm 13M5W7D
3 33 27 HC 704 711 0.074 2.5 ppm 9M01G7D
3 34 27 HC 704 711 0.064 2.5 ppm 9M05W7D
3 35 27 HC 782 782 0.068 2.5 ppm 9M01G7D
3 36 27 HC 782 782 0.057 2.5 ppm 9M03W7D
3 37 27 HC 779.5 784.5 0.057 2.5 ppm 4M51W7D
3 38 27 HC 709 711 0.075 2.5 ppm 9M01G7D
3 39 27 HC 709 711 0.064 2.5 ppm 9M05W7D
3 4 27 HC 2506 2680 0.337 2.5 ppm 17M9G7D
3 41 27 HC 2506 2680 0.288 2.5 ppm 17M9W7D
3 42 22H HC 831.5 841.5 0.08 2.5 ppm 13M5G7D
3 43 22H HC 831.5 841.5 0.066 2.5 ppm 13M5W7D
3 44 27 HC 2580 2610 0.254 2.5 ppm 18M0G7D
3 45 27 HC 2580 2610 0.208 2.5 ppm 17M9W7D
3 46 27 HC 2572.5 2617.5 0.215 2.5 ppm 4M52W7D
3 47 27 HC 1720 1770 0.361 2.5 ppm 17M9G7D
3 48 27 HC 1720 1770 0.299 2.5 ppm 17M9W7D
3 49 27 HC 1711.5 1778.5 0.307 2.5 ppm 2M72W7D
3 5 27 HC 673 688 0.046 2.5 ppm 17M9G7D
3 51 27 HC 673 688 0.039 2.5 ppm 17M9W7D
3 52 27 HC 668 693 0.039 2.5 ppm 9M05W7D
3 53 22H HC 829 844 0.091 2.5 ppm 18M8G7D
3 54 22H HC 829 844 0.078 2.5 ppm 18M7W7D
3 55 22H HC 829 846.2 0.078 2.5 ppm 13M9W7D
3 56 27 HC 1715 1775 0.308 2.5 ppm 18M8G7D
3 57 27 HC 1715 1775 0.332 2.5 ppm 18M8W7D
3 58 27 HC 1713 1772.5 0.322 2.5 ppm 18M1G7D
3 59 27 HC 1720 1770 0.324 2.5 ppm 37M7G7D
3 6 27 HC 1720 1770 0.356 2.5 ppm 37M6W7D
3 61 27 HC 1717.5 1774.7 0.346 2.5 ppm 23M4G7D
3 62 27 HC 2510 2560 0.403 2.5 ppm 37M3G7D
3 63 27 HC 2510 2560 0.357 2.5 ppm 37M6W7D
3 64 27 HC 2507.5 2562.5 0.375 2.5 ppm 28M7W7D
3 65 27 HC 2510 2560 0.299 2.5 ppm 37M7G7D
3 66 27 HC 2506 2680 0.297 2.5 ppm 37M7W7D
3 67 24E HC 1860 1900 0.494 2.5 ppm 19M0G7D
3 68 24E HC 1860 1900 0.372 2.5 ppm 19M0W7D
3 69 22H HC 834 839 0.073 2.5 ppm 18M9G7D
3 7 22H HC 834 839 0.057 2.5 ppm 18M9W7D
3 71 22H HC 826.5 846.5 0.058 2.5 ppm 4M50W7D
3 72 27 HC 706.5 708.5 0.062 2.5 ppm 14M1G7D
3 73 27 HC 706.5 708.5 0.052 2.5 ppm 14M2W7D
3 74 24E HC 1860 1905 0.505 2.5 ppm 19M0G7D
3 75 24E HC 1860 1905 0.38 2.5 ppm 19M0W7D
3 76 24E HC 1857.5 1907.5 0.381 2.5 ppm 14M2W7D
3 77 27 HC 1720 1770 0.437 2.5 ppm 19M0G7D
3 78 27 HC 1720 1770 0.339 2.5 ppm 19M1W7D
3 79 27 HC 1717.5 1772.5 0.345 2.5 ppm 14M2W7D
3 8 27 HC 673 688 0.051 2.5 ppm 18M9G7D
3 81 27 HC 673 688 0.041 2.5 ppm 18M9W7D
3 82 27 HC 670.5 690.5 0.042 2.5 ppm 14M2W7D
3 83 22H HC 826.5 846.5 0.0682 2.5 ppm 4M51W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2402.00000000 2480.00000000 0.1210000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 3 MO 37050 39950 0.277 2.5 ppm 191MG7D
5 2 3 MO 37050 39950 0.249 2.5 ppm 190MW7D
5 3 3 MO 37050 39950 0.724 2.5 ppm 45M4G7D
5 4 3 MO 37050 39950 0.437 2.5 ppm 45M6W7D
5 5 3 MO 27550 28300 0.175 2.5 ppm 190MG7D
5 6 3 MO 27550 28300 0.158 2.5 ppm 191MW7D
5 7 3 MO 27550 28300 0.418 2.5 ppm 92M8G7D
5 8 3 MO 27550 28300 0.332 2.5 ppm 93M2W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 96 EP HC 3560 3690 0.138 2.5 ppm 17M9G7D
6 2 96 EP HC 3560 3690 0.113 2.5 ppm 17M9W7D
6 3 96 EP HC 3560 3690 0.019 2.5 ppm 38M0G7D
6 4 96 EP HC 3560 3690 0.02 2.5 ppm 37M8W7D
6 5 96 EP HC 3557.8 3690 0.02 2.5 ppm 32M8G7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15C CC 13.56000000 13.56000000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC