all | frequencies |
|
exhibits | applications |
---|---|---|---|---|
manual |
app s | submitted / available | |||||||
---|---|---|---|---|---|---|---|---|
1 |
|
User Manual | Users Manual | 1.77 MiB | ||||
1 | Cover Letter(s) | |||||||
1 | Cover Letter(s) | |||||||
1 | External Photos | |||||||
1 | Internal Photos | |||||||
1 | ID Label/Location Info | |||||||
1 | ID Label/Location Info | |||||||
1 | RF Exposure Info | |||||||
1 | Test Report | |||||||
1 | Test Report | |||||||
1 | Test Setup Photos |
1 | User Manual | Users Manual | 1.77 MiB |
RRU3261 Installation Guide Issue Date Draft A 2015-07-24 HUAWEI TECHNOLOGIES CO., LTD. Copyright Huawei Technologies Co., Ltd. 2015. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Technologies Co., Ltd. Address:
Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website:
Email:
http://www.huawei.com support@huawei.com Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. i RRU3261 Installation Guide About This Document About This Document Purpose This document describes the process of installing a DC blade RRU3261 (referred to as RRU in this document). Product Version The following table lists the product version related to this document. Product Name DBS3900 Solution Version Product Version l SRAN9.0 l eRAN7.0 l SRAN10.1 and later versions l eRAN8.1 and later versions V100R009C00 V100R010C10 and later versions Intended Audience This document is intended for:
Base station installation engineers Organization 1 Changes in the RRU3261 Installation Guide This chapter describes the changes in the RRU3261 Installation Guide. 2 Installation Preparations This chapter describes the reference documents, tools, and instruments that must be ready before the installation. In addition, it specifies the skills and prerequisites that installation engineers must have. 3 Information About the Installation Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. ii RRU3261 Installation Guide About This Document Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation options and installation clearance requirements. 4 Unpacking the Equipment This chapter describes how to unpack and check the delivered equipment to ensure that all the materials are included and intact. 5 Installation Process The installation process involves installing an RRU and RRU cables, checking the RRU hardware installation, and powering on the RRU. 6 Installing the RRU This chapter describes the procedure for installing the RRU. The procedure for installing the RRU varies depending on installation options. 7 Installing RRU Cables This chapter describes the procedure for installing RRU cables. 8 Checking the RRU Hardware Installation 9 Powering On an RRU After all the devices are installed, check the power-on status of an RRU. 10 Appendix Conventions Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Description Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. iii RRU3261 Installation Guide About This Document Symbol Description Calls attention to important information, best practices and tips. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. General Conventions The general conventions that may be found in this document are defined as follows. Convention Description Times New Roman Normal paragraphs are in Times New Roman. Names of files, directories, folders, and users are in boldface. For example, log in as user root. Book titles are in italics. Examples of information displayed on the screen are in Courier New. Boldface Italic Courier New Command Conventions The command conventions that may be found in this document are defined as follows. Description The keywords of a command line are in boldface. Command arguments are in italics. Items (keywords or arguments) in brackets [ ] are optional. Optional items are grouped in braces and separated by vertical bars. One item is selected. Optional items are grouped in brackets and separated by vertical bars. One item is selected or no item is selected. Optional items are grouped in braces and separated by vertical bars. A minimum of one item or a maximum of all items can be selected. Optional items are grouped in brackets and separated by vertical bars. Several items or no item can be selected. Convention Boldface Italic
[ ]
{ x | y | ... }
[ x | y | ... ]
{ x | y | ... }*
[ x | y | ... ]*
GUI Conventions Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. iv RRU3261 Installation Guide About This Document The GUI conventions that may be found in this document are defined as follows. Description Buttons, menus, parameters, tabs, window, and dialog titles are in boldface. For example, click OK. Multi-level menus are in boldface and separated by the ">"
signs. For example, choose File > Create > Folder. Convention Boldface
>
Keyboard Operations The keyboard operations that may be found in this document are defined as follows. Description Press the key. For example, press Enter and press Tab. Press the keys concurrently. For example, pressing Ctrl+Alt
+A means the three keys should be pressed concurrently. Press the keys in turn. For example, pressing Alt, A means the two keys should be pressed in turn. Format Key Key 1+Key 2 Key 1, Key 2 Mouse Operations The mouse operations that may be found in this document are defined as follows. Action Click Double-click Drag Description Select and release the primary mouse button without moving the pointer. Press the primary mouse button twice continuously and quickly without moving the pointer. Press and hold the primary mouse button and move the pointer to a certain position. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. v RRU3261 Installation Guide Contents Contents About This Document.....................................................................................................................ii 1 Changes in the RRU3261 Installation Guide...........................................................................1 2 Installation Preparations..............................................................................................................2 2.1 Reference Documents.....................................................................................................................................................3 2.2 Tools and Instruments....................................................................................................................................................3 2.3 Skills and Requirements for Onsite Personnel...............................................................................................................5 3 Information About the Installation...........................................................................................6 3.1 RRU Exterior..................................................................................................................................................................7 3.2 RRU Ports.......................................................................................................................................................................8 3.3 RRU Indicators.............................................................................................................................................................10 3.4 Installation Options.......................................................................................................................................................12 3.5 Installation Clearance Requirements of an RRU..........................................................................................................14 3.5.1 Installation Clearance for Multiple RRUs.................................................................................................................14 3.5.2 Installation Spacing Between RRUs..........................................................................................................................16 4 Unpacking the Equipment.........................................................................................................17 5 Installation Process.....................................................................................................................19 6 Installing the RRU.......................................................................................................................21 6.1 Mounting Kits for an RRU...........................................................................................................................................22 6.2 Installing the RRU on a Pole........................................................................................................................................22 6.3 Installing the RRU on a Tower.....................................................................................................................................26 7 Installing RRU Cables................................................................................................................32 7.1 Cabling Requirements..................................................................................................................................................34 7.2 RRU Cable Connections...............................................................................................................................................40 7.3 Installing RRU Cables..................................................................................................................................................42 7.4 RRU Cables..................................................................................................................................................................43 7.5 Installing an RRU PGND Cable...................................................................................................................................44 7.6 Installing an RRU RF Jumper......................................................................................................................................46 7.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable.....................................................................49 7.8 Installing an RRU Alarm Cable....................................................................................................................................51 7.9 Opening the Cover Plate of an RRU Cabling Cavity...................................................................................................53 Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. vi RRU3261 Installation Guide Contents 7.10 Installing a CPRI Optical Cable.................................................................................................................................55 7.11 Installing an RRU Power Cable..................................................................................................................................57 7.12 Closing the Cover Plate of an RRU Cabling Cavity..................................................................................................59 8 Checking the RRU Hardware Installation..............................................................................63 9 Powering On an RRU.................................................................................................................64 10 Appendix.....................................................................................................................................66 10.1 Adding a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side........................67 Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. vii RRU3261 Installation Guide 1 Changes in the RRU3261 Installation Guide 1 Changes in the RRU3261 Installation Guide This chapter describes the changes in the RRU3261 Installation Guide. Draft A (2015-07-24) This is a draft. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 1 RRU3261 Installation Guide 2 Installation Preparations 2 Installation Preparations About This Chapter This chapter describes the reference documents, tools, and instruments that must be ready before the installation. In addition, it specifies the skills and prerequisites that installation engineers must have. 2.1 Reference Documents Before the installation, you must be familiar with reference documents. 2.2 Tools and Instruments You must prepare the following tools and instruments before the installation. 2.3 Skills and Requirements for Onsite Personnel Onsite personnel must be qualified and trained. Before performing any operation, onsite personnel must be familiar with correct operation methods and safety precautions. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 2 RRU3261 Installation Guide 2 Installation Preparations 2.1 Reference Documents Before the installation, you must be familiar with reference documents. The following reference documents are required during RRU installation:
l RRU3261 Hardware Description l DBS3900 Installation Guide l OCB User Guide l OCB-01M User Guide 2.2 Tools and Instruments You must prepare the following tools and instruments before the installation. Hammer drill (a 12 bit) ESD gloves Vacuum cleaner Heat gun Phillips screwdriver (M3 to M6) Flat-head screwdriver (M3 to M6) Rubber mallet COAX crimping tool Wire stripper Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 3 RRU3261 Installation Guide Utility knife Cable cutter 2 Installation Preparations Adjustable wrench (size 32 mm [1.26 in.]) Torque wrench Size: 18 mm (0.71 in.) and 32 mm (1.26 in.) Combination wrench Size: 18 mm (0.71 in.) and 32 mm (1.26 in.) Level Torque screwdriver Torque socket 5 mm 5 mm
(M3 to M6)
(M3 to M6) Multimeter Marker (diameter 10 mm
[0.39 in.]) Measuring tape Inner hexagon wrench Fixed pulley Lifting sling 5 mm Hydraulic pliers
-
-
Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 4 RRU3261 Installation Guide 2 Installation Preparations 2.3 Skills and Requirements for Onsite Personnel Onsite personnel must be qualified and trained. Before performing any operation, onsite personnel must be familiar with correct operation methods and safety precautions. Before the installation, pay attention to the following items:
l The customer's technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. l The number of onsite personnel depends on the engineering schedule and installation environment. Generally, only three to five onsite personnel are necessary. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 5 RRU3261 Installation Guide 3 Information About the Installation 3 Information About the Installation About This Chapter Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation options and installation clearance requirements. 3.1 RRU Exterior This section describes the exterior and dimensions of an RRU. 3.2 RRU Ports This section describes ports on the RRU panels. An RRU has a bottom panel, cabling cavity panel, and indicator panel. 3.3 RRU Indicators This section describes six indicators on an RRU. They indicate the running status of the RRU. 3.4 Installation Options This section describes RRU installation options. RRU installation supports the centralized mode. 3.5 Installation Clearance Requirements of an RRU This section describes the requirements for the installation clearance of multiple RRUs and the requirements for the installation spacing between RRUs. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 6 RRU3261 Installation Guide 3.1 RRU Exterior 3 Information About the Installation This section describes the exterior and dimensions of an RRU. Figure 3-1 shows the exterior of an RRU. Figure 3-1 RRU exterior Figure 3-2 shows RRU dimensions. Figure 3-2 RRU dimensions You can obtain the RRU frequency band and power supply information from the configuration label on the cover plate and obtain the RRU name from the nameplate on the side of RRU that accommodates the conversion bracket. Figure 3-3 shows the positions of the configuration label and nameplate on the RRU. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 7 RRU3261 Installation Guide 3 Information About the Installation NOTE The actual label and nameplate may differ from what is shown in the figure. Figure 3-3 Positions of the label and nameplate
(1) Configuration label
(4) Power supply module
(2) Nameplate
(3) Frequency band
(5) Module name
-
3.2 RRU Ports This section describes ports on the RRU panels. An RRU has a bottom panel, cabling cavity panel, and indicator panel. Figure 3-4 shows the ports on the RRU panels. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 8 RRU3261 Installation Guide 3 Information About the Installation Figure 3-4 Ports on the RRU panels Table 3-1 describes ports and indicators on the RRU panels. Table 3-1 Ports and indicators on the RRU panels Item Silkscreen Remarks
(1) Bottom ports ANT_TX/RXA TX/RX port A, supporting RET signal transmission ANT_TX/RXC TX/RX port C ANT_TX/RXD TX/RX port D ANT_TX/RXB TX/RX port B, supporting RET signal transmission EXT_ALM Alarm monitoring port used for monitoring one RS485 signal and two dry contact signals RET RTN(+) NEG(-) Communication port for the RET antenna, supporting RET signal transmission Power supply socket, for details about RRU power cable experience and specifications, see RRU Power Cable.
(2) Ports in the cabling cavity Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 9 RRU3261 Installation Guide 3 Information About the Installation Item Silkscreen Remarks Optical/electrical port 0, connected to the BBU Optical/electrical port 1, connected to the BBU For details, see 3.3 RRU Indicators. CPRI0 CPRI1 RUN ALM ACT VSWR CPRI0 CPRI1
(3) Indicator NOTE l The port for transmitting RET signals is determined by the software. l Connect the CPRI0 port to the BBU by default in the single-mode scenario. 3.3 RRU Indicators This section describes six indicators on an RRU. They indicate the running status of the RRU. For detailed positions of RRU indicators, see 3.2 RRU Ports. Table 3-2 describes RRU indicators. Table 3-2 RRU Indicators Indicator RUN Color Green Status Steady on Steady off Blinking (on for 1s and off for 1s) Blinking (on for 0.125s and off for 0.125s) Meaning The power input is available, but the board is faulty. No power input is available or the board is faulty. The board is running properly. The board software is being loaded or the board is not working. ALM Red Steady on Alarms are generated, and the module must be replaced. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 10 RRU3261 Installation Guide 3 Information About the Installation Indicator Color Status Meaning Blinking (on for 1s and off for 1s) ACT Green Steady off Steady on Alarms are generated. The alarms may be caused by faults on the related board or ports. Therefore, you need to locate the fault before deciding whether to replace the module. No alarms are generated. The board is working properly when TX channels are enabled or software is being loaded to a board that is not started. Blinking (on for 1s and off for 1s) The board is running with TX channels disabled. VSWR Red Steady off No voltage standing wave ratio (VSWR) alarm is generated. CPRI0 Red and green CPRI1 Red and green Blinking (on for 1s and off for 1s) VSWR alarms are generated on the ANT_TX/RXB port. Steady on VSWR alarms are generated on the ANT_TX/RXA port. Blinking (on for 0.125s and off for 0.125s) VSWR alarms are generated on the ANT_TX/RXA and ANT_TX/RXB ports. Steady green The CPRI link is running properly. Steady red Blinking red (on for 1s and off for 1s) Steady off An optical module fails to receive or transmit signals possibly because the optical module is faulty or the optical fiber is broken. The CPRI link is out of lock because of faults on the mutual lock of dual-mode clock sources or mismatched data rates on CPRI ports. The optical module cannot be detected or is powered off. Steady green The CPRI link is running properly. Steady red Blinking red (on for 1s and off for 1s) Steady off An optical module fails to receive or transmit signals possibly because the optical module is faulty or the optical fiber is broken. The CPRI link is out of lock because of faults on the mutual lock of dual-mode clock sources or mismatched data rates on CPRI ports. The optical module cannot be detected or is powered off. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 11 RRU3261 Installation Guide NOTE 3 Information About the Installation VSWR indicators on RRUs providing one or more than two TX channels have two types of status:
l Steady off: No VSWR alarm is generated. l Steady on: VSWR alarms are generated on one or more ports. 3.4 Installation Options This section describes RRU installation options. RRU installation supports the centralized mode. Figure 3-5 shows the diameter of a pole for installing an RRU. Figure 3-5 Diameter of a pole NOTICE l The diameter of a pole for installing an RRU ranges from 60 mm (2.36 in.) to 114 mm (4.49 in.). The recommended diameter is 80 mm (3.15 in.). l When the diameter of a pole ranges from 60 mm (2.36 in.) to 76 mm (2.99 in.), a maximum of three RRUs can be installed on the pole and the side-mounted installation is recommended. l Only a pole whose diameter ranges from 76 mm (2.99 in.) to 114 mm (4.49 in.) supports more than three RRUs. l The recommended thickness of the pole wall is 3.5 mm (0.14 in.) or above. Figure 3-6 shows two RRUs installed in centralized mode. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 12 RRU3261 Installation Guide 3 Information About the Installation Figure 3-6 Two RRUs installed in centralized mode Figure 3-7 shows three RRUs installed in centralized mode. Figure 3-7 Three RRUs installed in centralized mode Figure 3-8 shows four RRUs installed in centralized mode. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 13 RRU3261 Installation Guide 3 Information About the Installation Figure 3-8 Four RRUs installed in centralized mode NOTE For details about how to install RRUs on an IFS06, see DBS3900 (ICR) Installation Guide. 3.5 Installation Clearance Requirements of an RRU This section describes the requirements for the installation clearance of multiple RRUs and the requirements for the installation spacing between RRUs. 3.5.1 Installation Clearance for Multiple RRUs This section describes the recommended and minimum installation clearance for multiple RRUs. Recommended Installation Clearance for Multiple RRUs Installed in Centralized Mode Figure 3-9 shows the recommended installation clearance for multiple RRUs installed in centralized mode. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 14 RRU3261 Installation Guide 3 Information About the Installation Figure 3-9 Recommended installation clearance for multiple RRUs installed in centralized mode Minimum Installation Clearance for Multiple RRUs Installed in Centralized Mode Figure 3-10 shows the minimum installation clearance for multiple RRUs installed in centralized mode. Figure 3-10 Minimum installation clearance for multiple RRUs installed in centralized mode Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 15 RRU3261 Installation Guide 3 Information About the Installation 3.5.2 Installation Spacing Between RRUs This section describes the horizontal and vertical spacing between RRUs. Figure 3-11 shows the recommended horizontal spacing between RRUs. Figure 3-11 Recommended horizontal spacing between RRUs Figure 3-12 shows the recommended vertical spacing between RRUs. Figure 3-12 Recommended vertical spacing between RRUs Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 16 RRU3261 Installation Guide 4 Unpacking the Equipment 4 Unpacking the Equipment This chapter describes how to unpack and check the delivered equipment to ensure that all the materials are included and intact. Context NOTE When transporting, moving, or installing the equipment, components, or parts, you must:
Prevent them from colliding with doors, walls, shelves, or other objects. l l Wear clean gloves, and avoid touching the equipment, components, or parts with bare hands, sweat-
soaked gloves, or dirty gloves. NOTICE l After a cabinet or an BBU is unpacked, it must be powered on within 7 days. l After an RRU is unpacked, it must be powered on within 24 hours. Procedure Step 1 Check the total number of articles in each case according to the packing list. If ... Then ... The total number tallies with the packing list Go to Step 2. The total number does not tally with the packing list Find out the cause and report any missing articles to the local Huawei office. Step 2 Check the exterior of the packing case. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 17 RRU3261 Installation Guide 4 Unpacking the Equipment If ... Then ... The outer packing is intact Go to Step 3. The outer packing is severely damaged or soaked Find out the cause and report it to the local Huawei office. Step 3 Check the type and quantity of the equipment in the cases according to the packing list. If ... Then ... Types and quantity of the article tally with those on the packing list Sign the Packing List with the customer. Either shipment shortage, wrong shipment or damaged articles. Report to the local Huawei office. CAUTION l To protect the equipment and prevent damage to the equipment, you are advised to keep the unpacked equipment and packing materials indoors, take photos of the stocking environment, packing case or carton, packing materials, and any rusted or eroded equipment, and then file the photos. l Verify that the insulation layers of all RRU cables are intact. If the insulation layers are damaged or broken, water will penetrate into the cables, which may cause damages to RRUs or human injury.
----End Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 18 RRU3261 Installation Guide 5 Installation Process 5 Installation Process The installation process involves installing an RRU and RRU cables, checking the RRU hardware installation, and powering on the RRU. Figure 5-1 shows the process of installing an RRU. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 19 RRU3261 Installation Guide 5 Installation Process Figure 5-1 Process of installing an RRU Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 20 RRU3261 Installation Guide 6 Installing the RRU 6 Installing the RRU About This Chapter This chapter describes the procedure for installing the RRU. The procedure for installing the RRU varies depending on installation options. 6.1 Mounting Kits for an RRU This section describes the mounting kits for an RRU in centralized mode. 6.2 Installing the RRU on a Pole This section describes the procedure for installing the RRU on a pole in centralized mode. 6.3 Installing the RRU on a Tower This section describes the procedure for installing the RRU on a tower in centralized mode. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 21 RRU3261 Installation Guide 6 Installing the RRU 6.1 Mounting Kits for an RRU This section describes the mounting kits for an RRU in centralized mode. Figure 6-1 shows the mounting kits for an RRU in centralized mode. Figure 6-1 Mounting kits for an RRU
(1) Bracket assembly
(2) Backplane
(3) L plate 6.2 Installing the RRU on a Pole This section describes the procedure for installing the RRU on a pole in centralized mode. Procedure Step 1 Install the upper mounting bracket on the pole, use a level to check that the mounting support is level, and tighten the screws on the mounting bracket to 40 Nm (354.03 lbfin.) to 45 Nm
(398.28 lbfin.), as shown in Figure 6-2. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 22 RRU3261 Installation Guide 6 Installing the RRU Figure 6-2 Securing the upper mounting bracket on the pole Step 2 Install screws on the backplane, and secure the backplane to the RRU by tightening the screws to 5 Nm (44.25 lbfin.), as shown in Figure 6-3. Figure 6-3 Securing the backplane to the RRU NOTICE The installing method in Figure 6-4 is incorrect. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 23 RRU3261 Installation Guide 6 Installing the RRU Figure 6-4 Incorrect installing method Step 3 Install the RRU on the upper mounting bracket, and tighten the screws on the bracket to 40 Nm
(354.03 lbfin.) to 45 Nm (398.28 lbfin.), as shown in Figure 6-5. Figure 6-5 Installing the RRU on the upper mounting bracket Step 4 Install the lower mounting bracket on the RRU and pole (An L plate is required at the bottom of the backplane), use a level to check that the mounting support is level, and tighten the screws on the bracket to 40 Nm (354.03 lbfin.) to 45 Nm (398.28 lbfin.), as shown in Figure 6-6. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 24 RRU3261 Installation Guide 6 Installing the RRU Figure 6-6 Securing the lower mounting bracket Step 5 Install the backplane on the second RRU, similar to step2. Step 6 Install the second RRU on the upper mounting bracket on the pole, and tighten the screws on the bracket to 40 Nm (354.03 lbfin.) to 45 Nm (398.28 lbfin.),as shown in Figure 6-7. Figure 6-7 Installing the RRU on the pole Step 7 Install the backplane and L plate on the lower mounting bracket, and tighten the screws on the bracket to 40 Nm (354.03 lbfin.) to 45 Nm (398.28 lbfin.), as shown in Figure 6-8. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 25 RRU3261 Installation Guide 6 Installing the RRU Figure 6-8 Installing the backplane and L plate on the lower mounting bracket NOTE Install the third RRU and the RRU on the other side of the pole the same way as the second RRU. The tightening torque is similar to that for the first RRU.
----End 6.3 Installing the RRU on a Tower This section describes the procedure for installing the RRU on a tower in centralized mode. Procedure Step 1 Hoist the RRU onto a tower. 1. Install upper and lower mounting brackets on a pole, and then bind the pole using a lifting sling, as shown in Figure 6-9. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 26 RRU3261 Installation Guide 6 Installing the RRU Figure 6-9 Installing upper and lower mounting brackets and binding the pole
(1) Traction sling Install the backplane on the RRU, and bind the RRU using a lifting sling and traction sling, as shown in Figure 6-10.
(2) Lifting sling 2. Figure 6-10 Installing the backplane and binding the RRU
(1) Handle
(2) Lifting sling
(3) Traction eye
(4) Traction sling Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 27 RRU3261 Installation Guide 6 Installing the RRU NOTICE l The handle has a capacity of bearing at least four times the weight of the RRU. l The binding methods in Figure 6-11 and Figure 6-12 are incorrect. Figure 6-11 Incorrect binding method (1) Figure 6-12 Incorrect binding method (2) 3. Hoist the pole onto the tower, as shown in Figure 6-13. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 28 RRU3261 Installation Guide 6 Installing the RRU Figure 6-13 Hoisting the pole onto the tower
(1) Traction sling
(2) Lifting sling
(3) Fixed pulley 4. Hoist the RRU onto the tower, as shown in Figure 6-14. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 29 RRU3261 Installation Guide 6 Installing the RRU Figure 6-14 Hoisting the RRU onto the tower
(1) Lifting sling
(2) Fixed pulley
(3) Traction sling Step 2 Install the RRU on the tower. 1. Align the backplane with the holes on the upper mounting bracket, install screws on the holes, and secure the backplane to the upper mounting bracket by tightening the screws, as shown in Figure 6-15. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 30 RRU3261 Installation Guide 6 Installing the RRU Figure 6-15 Installing the RRU on the pole 2. Install the backplane and the L plate on the lower mounting bracket, as shown in Figure 6-16. Figure 6-16 Installing the backplane and the L plate on the lower mounting bracket
----End Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 31 RRU3261 Installation Guide 7 Installing RRU Cables 7 Installing RRU Cables About This Chapter This chapter describes the procedure for installing RRU cables. 7.1 Cabling Requirements Cables must be laid out according to the specified cabling requirements to prevent signal interference. 7.2 RRU Cable Connections This section describes RRU cable connections. 7.3 Installing RRU Cables This chapter describes the procedure for installing RRU cables. 7.4 RRU Cables This section describes RRU cable connections. 7.5 Installing an RRU PGND Cable This section describes the procedure for installing an RRU PGND cable. 7.6 Installing an RRU RF Jumper This section describes the procedure for installing an RRU RF jumper. 7.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable This section describes the procedures for installing an RRU AISG multi-wire cable and AISG extension cable. 7.8 Installing an RRU Alarm Cable This section describes the procedure for installing an RRU alarm cable. 7.9 Opening the Cover Plate of an RRU Cabling Cavity This section describes the procedure for opening the cover plate of an RRU cabling cavity. 7.10 Installing a CPRI Optical Cable This section describes the procedure for installing a CPRI optical cable. 7.11 Installing an RRU Power Cable This section describes the procedure for installing an RRU power cable. 7.12 Closing the Cover Plate of an RRU Cabling Cavity Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 32 RRU3261 Installation Guide 7 Installing RRU Cables This section describes the procedure for closing the cover plate of an RRU cabling cavity. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 33 RRU3261 Installation Guide 7 Installing RRU Cables 7.1 Cabling Requirements Cables must be laid out according to the specified cabling requirements to prevent signal interference. NOTE If a cable listed below is not required, skip the cabling requirements of the cable. General Cabling Requirements Bending radius requirements l The bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.), and the bending radius of a 5/4'' feeder must be greater than 380 mm (14.96 in.). l The bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.). The bending radius of a super-flexible 1/2'' jumper must be greater than 50 mm (1.97 in.), and the bending radius of an ordinary 1/2'' jumper must be greater than 127 mm (5 in.). l The bending radius of a power cable or PGND cable must be at least three times its diameter. l The bending radius of a fiber optic cable is at least 20 times of its diameter, and the bending radius of a breakout cable is at least 30 mm (1.18 in.). l The bending radius of an E1/T1 cable must be at least three times its diameter. l The bending radius of a signal cable must be at least five times its diameter. Cable binding requirements l Cables of the same type must be bound together. l Different types of cables must be separately laid out and bound, with a minimum distance of 30 mm (1.18 in.) from each other. l The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged. l The cable ties must face the same direction, and those at the same horizontal line must be in a straight line. l The excess of the indoor cable ties is cut off. The excess of 5 mm (0.197 in.) of the outdoor cable ties is reserved, and the cut surfaces are smooth without sharp edges. l After cables are installed, labels or nameplates must be attached to the cables at their ends, curves, and interconnection positions. Security requirements l When routing cables, avoid sharp objects, for example sharp edges on the wall. If necessary, use tubes to protect the cables. l When routing cables, keep the cables away from heat sources and use heat insulation materials to insulate the cables from the heat sources. l Reserve a proper distance (0.1 m or 3.937 in. is recommended) between equipment and cables especially at the cable curves to protect the cables and equipment. Indoor cabling requirements l Route each cable into the room through the feeder window. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 34 RRU3261 Installation Guide 7 Installing RRU Cables l Reserve drip loops for all cables outside the feeder window before routing them into the room. Ensure that the radiuses of the drip loops are greater than or equal to the minimum bending radiuses of the cables. l When routing a cable into the room, ensure that a person is assisting you in the room. l Apply waterproof treatment to the feeder window. Outdoor Cabling Requirements l After being connected to a ground clip on power cables, a ground cable must be routed downwards to prevent water from entering the equipment to which the power cables connect. l Protect outdoor cables against potential damage. For example, put the cables through tubes. l The cables to be protected include AC power cables, transmission cables, and cables laid out underground. l When routing cables through tubes on the ground below the cabinet, put a 30 mm to 50 mm (1.18 in. to 1.97 in.) length of the tubes into the base of the cabinet but do not put the tubes into the cabinet. Use waterproof tape or waterproof silicon gel to block both ends of the tubes and use sheet metal tabs to secure the tubes to the cable holes in the base. l When routing cables through tubes along a metal cable trough below the cabinet, do not put the tubes into the base of the cabinet but cover the cable trough and connect the tubes to the cable holes in the base. l When routing RRU cables, ensure that the highest positions of the routes of all RRU cables
(except RF cables and AISG cables) must be lower than the bottom of the RRU. l Use clips to secure cables outdoors. For the method of installing a clip, see the installation guide delivered with the clip. l Arrange cables neatly along the routing direction and use clips to secure the cables. l Determine the positions where the clips are installed according to the actual situation. For example, 7/8" feeders are secured with clips at an interval of 1.5 m to 2 m (4.92 ft to 6.56 ft), CPRI fiber optic cables and power cables are secured with clips at an interval of 1 m to 1.5 m (3.28 ft to 4.92 ft). Ensure that the clips are evenly spaced and in the same direction. l When fastening cables with a clip, ensure that the cables are aligned neatly and are routed through the holes in the clip. Do not stretch the cables too tightly. NOTE There are two types of clips: 3-hole clip and 6-hole clip, which are described as follows:
l A 3-hole clip is shown by illustration a in the following figure. It is often used to fasten feeders. A 6-hole clip is shown by illustration b in the following figure. It is often used to fasten power cables and CPRI fiber optic cables. l Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 35 RRU3261 Installation Guide Figure 7-1 Exterior of the clips 7 Installing RRU Cables
(1) Cable hole for feeders
(2) Cable hole for fiber optic cables
(3) Cable hole for power cables The following figure shows the cables secured on a cable tray. Figure 7-2 Cables secured on a cable tray
(1) 3-hole clip
(2) 6-hole clip The following figure shows the cables secured on a tower. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 36 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-3 Cables secured on a tower
(1) 3-hole clip
(2) 6-hole clip Special Cabling Requirements Cabling of power cables l Power cables must be installed in the position specified in engineering design documents. l If the length of power cables is insufficient, replace the cables rather than adding connectors or soldering joints to lengthen the cables. l Cables can only be laid out under well-planned instructions. The cabling activities of fiber optic cables are allowed only when qualified personnel and communication facilities are available. l Do not circle and twist cables. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 37 RRU3261 Installation Guide 7 Installing RRU Cables l After routing a DC power cable onto the platform on a tower, route it along the shortest path to the rails surrounding the platform, and route it along the inside of the rails. l After routing a DC power cable close to the equipment on a tower, use clips to secure the power cable onto a pole or the rails surrounding the platform. Ensure that there is no excessively long distance between the equipment and the position where the power cable is secured. Cabling of PGND cables l PGND cables for a base station must be connected to the same group of ground bars. l PGND cables must be buried in the ground or routed indoors. l The external conductor of the coaxial wire and the shield layer of the shielded cable must have proper electrical contact with the metal surface of the equipment to which they are connected. l PGND cables and signal cables must be installed separately. A certain distance must be reserved between them to prevent interference from each other. l Switches or fuses must not be installed on the PGND cables. l Other devices must not be used for electrical connections of the PGND cables. l All the metal parts in the housing of the equipment must be reliably connected to the ground terminal. Cabling of E1 cables l E1 cables must not cross power cables, PGND cables, or RF cables when laid out. If transmission cables are laid out with power cables, PGND cables, or RF cables in parallel, the spacing between them must be greater than 30 mm (1.18 in.). l E1 cables are lined up straight and bound neatly with cable ties. l Sufficient slack is provided for E1 cables at turns. l E1 cables must not be pressed by the door of the cabinet when routed, as shown in the following figure. Figure 7-4 E1 cables routed in the cabinet Cabling of fiber optic cables l At least three people are required for laying out fiber optic cables. The cabling activities of fiber optic cables are allowed only when qualified personnel and communication facilities are available. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 38 RRU3261 Installation Guide 7 Installing RRU Cables l The operating temperature of fiber optic cables ranges from -40C to +60C (-40F to
+140F). If the actual temperature is beyond this range, take protective measures or select another route. l Do not circle and twist cables. l Do not bind a fiber optic cable at the position where it bends. l Do not stretch, step on, or place heavy objects on fiber optic cables. Keep the fiber optic cables away from sharp objects. l When fiber optic cables are routed, the excess of the fiber optic cables must be coiled around special devices, such as a fiber coiler. l An unarmored fiber optic cable must be bound using binding straps. If a fiber optic patch cord needs to be secured in a cabinet or a piece of equipment, use binding straps to bind it and then use cable ties to secure the binding straps to the cabinet or equipment. Ensure that the fiber optic cables can flexibly move in the cable ties. Do not bend the fiber optic cables sharply. The following figure shows how to bind the fiber optic cables correctly. Figure 7-5 Binding fiber optic cables l When coiling fiber optic cables, apply even strength. Do not bend the fiber optic cables with force. l Unused optical connectors must be covered with dustproof caps. l The fiber optic cables must not be pressed by the door of the cabinet when routed, as shown in the following figures. Figure 7-6 CPRI fiber optic cables routed in the cabinet (1) Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 39 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-7 CPRI fiber optic cables routed in the cabinet (2) Figure 7-8 FE/GE fiber optic cables routed in the cabinet l After routing a fiber optic cable onto the platform on a tower, route it along the shortest path to the rails surrounding the platform, and route it along the inside of the rails. l After routing a fiber optic cable close to the equipment on a tower, use clips to secure the fiber optic cable onto a pole or the rails surrounding the platform. Ensure that there is no excessively long distance between the equipment and the position where the cable is secured. l Coil the excess of the fiber optic cables near the equipment on the tower before securing the cables on the tower. 7.2 RRU Cable Connections This section describes RRU cable connections. NOTE The RRU does not support power cable cascading. Figure 7-9 shows the cable connections of a single RRU. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 40 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-9 Cable connections of a single RRU
(1) RRU PGND cable
(2) RRU RF jumper
(3) RRU AISG multi-wire cable
(4) RRU AISG extension cable
(5) RRU power cable
(6) CPRI optical fiber
(7) RRU alarm cable
-
-
Figure 7-10 shows the cable connections of multiple RRUs. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 41 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-10 Cable connections of multiple RRUs
(1) RRU PGND cable
(4) CPRI optical fiber
(2) RRU RF jumper
(3) RRU power cable
-
-
7.3 Installing RRU Cables This chapter describes the procedure for installing RRU cables. Figure 7-11 shows the procedure for installing RRU cables. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 42 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-11 Procedure for installing RRU cables 7.4 RRU Cables This section describes RRU cable connections. Table 7-1 lists RRU cables. Table 7-1 RRU cables Cable One End Connector The Other End Connector Installation Position RRU PGND Cable OT terminal
(M6, 16 mm2 or 0.025 in.2) Ground terminal on the RRU OT terminal
(M8, 16 mm2 or 0.025 in.2) Installation Position Ground terminal on the ground bar Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 43 RRU3261 Installation Guide 7 Installing RRU Cables Cable One End Connector The Other End Connector Installation Position RRU Power Cable Tool-less female connector
(pressfit type) NEG(-) and RTN(+) ports on the RRU Depending on the power supply equipment Installation Position External power equipment RRU Alarm Cable DB15 male connector CPRI Fiber Optic Cable DLC connector EXT_ALM port on the RRU CPRI0 port on the RRU Cord end terminal External alarm device DLC connector RRU RF Jumper DIN male connector RF ports on the RRU DIN male connector RRU AISG Multi-Wire Cable DB9 waterproof male connector RET port on the RRU Standard AISG female connector CPRI port on a board in the BBU Antenna system Standard AISG male connector on the RCU or on the AISG extension cable RRU AISG Extension Cable Standard AISG male connector Standard AISG female connector Standard AISG male connector on the RCU Standard AISG female connector on the AISG multi-wire cable 7.5 Installing an RRU PGND Cable This section describes the procedure for installing an RRU PGND cable. Context The cross-sectional area of an RRU PGND cable is 16 mm2 (0.025 in.2). The cable has an M6 OT terminal at one end and an M8 terminal at the other end. DANGER Install RRU PGND cables by strictly following the following operations. Otherwise, damage to the RRU or personal injury may occur. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 44 RRU3261 Installation Guide Procedure 7 Installing RRU Cables Step 1 According to the actual cable route, cut the PGND cable into a proper length to prepare an RRU PGND cable. Then, add an OT terminal at each end of the cable according to the instructions in Assembling the OT Terminal and the Power Cable. Step 2 Install the RRU PGND cable. Connect the M6 OT terminal at one end of the PGND cable to the ground terminal at the RRU bottom and the M8 OT terminal at the other end to the external ground bar, as shown in Figure 7-12. Figure 7-12 Installing an RRU PGND cable NOTE Crimp OT terminals in correct positions, as shown in Figure 7-13. Figure 7-13 Correct position of an OT terminal Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 45 RRU3261 Installation Guide 7 Installing RRU Cables Step 3 Label the installed cable according to the instructions in Attaching a Cable-Tying Label.
----End 7.6 Installing an RRU RF Jumper This section describes the procedure for installing an RRU RF jumper. Procedure Step 1 Connect the DIN male connector at one end of the RRU RF jumper to the ANT port on the RRU, and use a torque wrench to tighten the connector to 25 Nm (221.27 lbfin.), as shown in Figure 7-14. Figure 7-14 Installing an RRU RF jumper NOTICE On AC-powered electric railways, such as high-speed railways, when leaky cables are connected to RRUs installed in tunnels, high-voltage-resistance DC blocks must be installed between RRU RF jumpers and the leaky cables to protect the RRUs against damage. Step 2 Connect the other end of the RF jumper to the external antenna system. Step 3 Waterproof the connectors of the RF jumper by referring to Figure 7-15. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 46 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-15 Waterproofing a connector of the RF jumper
(1) Waterproof tape
(2) PVC insulation tape NOTE l Before wrapping waterproof tape, stretch the tape evenly until the length of the tape becomes twice its original length. l Do not stretch the PVC insulation tape when wrapping the PVC insulation tape. l Wrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlaps more than 50% of the preceding layer. Ensure that neighboring layers are stuck to each other. l Ensure that the adhesive surface of the tape overlaps the lower layer. l When cutting off the cable ties, reserve a redundant length of 3 mm (0.12 in.) to 5 mm (0.2 in.). 1. Wrap three layers of waterproof tape on the connector, first from bottom up, then from top down, and finally from bottom up. Start wrapping the connector at a position 50 mm (1.97 in.) away below the bottom of the connector to the top of the connector, first from bottom up, then from top down, and finally from bottom up. Cut off the redundant tape after three layers are wrapped. Wrap each layer of tape around the connector tightly. 2. Wrap three layers of PVC insulation tape. Start the wrapping at a position 30 mm (1.18 in.) away below the bottom of the waterproof tape to the top of the connector, first from bottom up, then from top down, and finally from bottom up. Cut off the redundant tape after three layers are wrapped. Wrap each layer of tape around the connector tightly. Start binding cable ties to the cable at a position 3 mm (0.12 in.) to 5 mm (0.2 in.) away from one end of the PVC insulation tape. 3. Step 4 Check the dustproof caps on antenna connectors. In outdoor scenarios, dustproof caps must be waterproofed, as shown in Figure 7-16. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 47 RRU3261 Installation Guide 7 Installing RRU Cables NOTICE Do not remove dustproof caps from vacant antenna connectors. Figure 7-16 Waterproofing a dustproof cap
(1) Dustproof cap
(2) Waterproof tape
(3) PVC insulation tape NOTE l Before wrapping waterproof tape, stretch the tape evenly until the length of the tape becomes twice its original length. l Do not stretch the PVC insulation tape when wrapping the PVC insulation tape. l Wrap each layer of tape around the connector tightly and neatly, and ensure that each layer of tape overlaps more than 50% of the preceding layer. Ensure that neighboring layers are stuck to each other. l Ensure that the adhesive surface of the tape overlaps the lower layer. l When cutting off the cable ties, reserve a redundant length of 3 mm (0.12 in.) to 5 mm (0.2 in.). 1. Verify that dustproof caps are not removed. 2. Wrap three layers of waterproof tape on the connector, first from bottom up, then from top down, and finally from bottom up. Wrap each connector with three layers of waterproof tape, from bottom up, then from top down, and finally from bottom up. Do not cut the tape until all the three layers of the tape are already wrapped. Cut off the redundant tape after three layers are wrapped. Wrap each layer of tape around the connector tightly. 3. Wrap three layers of PVC insulation tape. Wrap each connector with three layers of waterproof tape, from bottom up, then from top down, and finally from bottom up. Do not cut the tape until all the three layers of the tape are already wrapped. Cut off the redundant tape after three layers are wrapped. Wrap each layer of tape around the connector tightly. Start binding cable ties to the cable at a position 3 mm (0.12 in.) to 5 mm (0.2 in.) away from one end of the PVC insulation tape. 4. Step 5 Route the cables according to the instructions in Cabling Requirements, and then use cable ties to bind the cables. Step 6 Label the installed cables according to the instructions in Attaching a Sign Plate Label. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 48 RRU3261 Installation Guide 7 Installing RRU Cables Step 7 Attach color-coding to the installed RF jumper according to the instructions in Attaching the Color Ring.
----End 7.7 Installing an RRU AISG Multi-Wire Cable and AISG Extension Cable This section describes the procedures for installing an RRU AISG multi-wire cable and AISG extension cable. Context Procedure When the distance between an RRU and a Remote Control Unit (RCU) is longer than 5 m (16.4 ft.), an AISG multi-wire cable is not long enough to connect the RRU and the RCU. In this case, an AISG extension cable is used to extend the AISG multi-wire cable. l Install an AISG multi-wire cable that is not configured with an AISG extension cable. 1. Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RET 2. port and remove the dustproof cap. Link the waterproofed DB9 connector at one end the AISG multi-wire cable to the RET port on the RRU bottom, as shown in Figure 7-17. Figure 7-17 Installing an RRU AISG multi-wire cable Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 49 RRU3261 Installation Guide 7 Installing RRU Cables 3. Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproof DB9 connector to 0.4 Nm (3.54 lbfin.). 4. Connect the other end of the cable to the standard AISG male connector on the RCU. 5. Route the cables according to the instructions in Cabling Requirements, and then use cable ties to bind the cables. Label the installed cables according to the instructions in Attaching an L-Shaped Label. l Install an AISG multi-wire cable that is configured with an AISG extension cable. 1. Use an M3 flat-head screwdriver to loosen the screws on the dustproof cap on the RET port and remove the dustproof cap. Link the waterproofed DB9 connector at one end of the AISG multi-wire cable to the RET port on the RRU bottom, and link the other end to the standard AISG male connector of the AISG extension cable, as shown in Figure 7-18. 6. 2. Figure 7-18 Installing an RRU AISG multi-wire cable 3. Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproof DB9 connector to 0.4 Nm (3.54 lbfin.). 4. Connect the other end of the AISG extension cable to the standard AISG male connector on the RCU, as shown in Figure 7-19. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 50 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-19 Installing an RRU AISG extension cable 5. Route the cables according to the instructions in Cabling Requirements, and then use cable ties to bind the cables. Label the installed cables according to the instructions in Attaching an L-Shaped Label. 6.
----End 7.8 Installing an RRU Alarm Cable This section describes the procedure for installing an RRU alarm cable. Procedure Step 1 Use an M3 Phillips screwdriver to loosen the screws on the dustproof cap on the EXT_ALM port and remove the dustproof cap. Step 2 Connect the waterproof DB15 connector at one end of the RRU alarm cable to the EXT_ALM port on the RRU, as shown in Figure 7-20. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 51 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-20 Installing an RRU alarm cable NOTE Install the waterproof DB15 male connector on the RRU alarm cable with caution, preventing the pin assignment from being damaged. Step 3 Use an M3 Phillips screwdriver to tighten the posts on both sides of the waterproof DB15 male connector to 0.4 Nm (3.54 lbfin.). Step 4 Connect the eight cord end terminals at the other end to external alarm devices. NOTE l Remove insulated protective tubes from the cord end terminals before connecting the cord end terminals to devices, as shown in Figure 7-21. l Use insulating adhesive tapes to wrap cord end terminals that are not in use and fix them at a proper position based on the onsite situations. This prevents false alarm reporting and equipment damage due to contact of exposed cables. Figure 7-22 shows the method for handling cord end terminals not in use. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 52 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-21 Removing insulated protective tubes from the cord end terminals Figure 7-22 Method for handling cord end terminals that are not in use Step 5 Route the cables according to the instructions in Cabling Requirements, and then use cable ties to bind the cables. Step 6 Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End 7.9 Opening the Cover Plate of an RRU Cabling Cavity This section describes the procedure for opening the cover plate of an RRU cabling cavity. Procedure Step 1 Wear ESD gloves. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 53 RRU3261 Installation Guide 7 Installing RRU Cables NOTICE Take proper ESD protection measures, for example, wear ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic components. Step 2 Use an M5 Phillips screwdriver to loosen the three screws on the cover plate of the RRU cabling cavity, and open the cover plate, as shown in Figure 7-23. Figure 7-23 Opening the cover plate of the RRU cabling cavity
(1) Cover plate
(2) Cabling cavity
(3) Clip
(4) Cable trough for the power cable
(5) Waterproof block (6) Cable trough for the fiber optical cable Step 3 Loosen the screws on the clip using an M4 Phillips screwdriver, and open the clip, as shown in Figure 7-24. NOTE Open the clip only for the associated cable. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 54 RRU3261 Installation Guide Figure 7-24 Opening clips 7 Installing RRU Cables Step 4 Remove the waterproof block. NOTE Remove only the waterproof blocks for the cables to be installed.
----End 7.10 Installing a CPRI Optical Cable This section describes the procedure for installing a CPRI optical cable. Prerequisites Before the installation, single-mode optical modules can be distinguished from multimode optical modules in either of the following ways:
l SM and MM labels on an optical module: SM indicates a single-mode optical module, and MM indicates a multimode optical module. l Color of the puller on an optical module: Blue indicates a single-mode optical module, and black or gray indicates a multimode optical module. NOTICE The optical modules to be installed must match CPRI rates. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 55 RRU3261 Installation Guide Context Procedure 7 Installing RRU Cables l A CPRI optical cable transmits CPRI signals between a BBU and an RRU. Step 1 Lower the pullers of two optical modules, insert one optical module into the CPRI0 port on the RRU and the other optical module into the CPRI port on the BBU, and raise the pullers, as shown in Figure 7-25. Figure 7-25 Installing an optical module NOTICE The performance of an optical module that is exposed to the air for more than 20 minutes may be abnormal. Therefore, you must insert an fiber optic cable into an unpacked optical module within 20 minutes. Step 2 Connect the end labeled 1A and 1B of the optical cable to the optical module on the RRU side, as shown in Figure 7-26. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 56 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-26 Installing a CPRI optical cable NOTICE To avoid any damage to optical cables, the cables connected to the RRU must be installed according to the installation process. For details about the installation process, see 7.3 Installing RRU Cables. Step 3 Connect the end labeled 2A and 2B of the optical cable to the optical module on the BBU side. Step 4 Route the cables according to the instructions in Cabling Requirements, and then use cable ties to bind the cables. Step 5 Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End 7.11 Installing an RRU Power Cable This section describes the procedure for installing an RRU power cable. Prerequisites l A tool-less female connector (pressfit type) is added to the RRU power cable on the RRU side. For details, see 10.1 Adding a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 57 RRU3261 Installation Guide Context l A connector or OT terminals are added to the RRU power cable on the power device side. For details, see DBS3900 Installation Guide. 7 Installing RRU Cables If a power device provided by the customer is used, the recommended specification of the circuit breaker on this power device is 20 A to 30 A. Table 7-2 describes the RRU power cable. On the Power Device Side Tool-less female connector
(pressfit type) EPC5 connector Pow er Devi ce EPU DCD U-11 B DCD U-12 B Color A cable with a black jacket and two wires inside l North American standards: The RTN(+) wire is black and the NEG(-) wire is blue. l European standards: The RTN
(+) wire is brown and the NEG
(-) wire is blue. Table 7-2 RRU power cable Cable On the RRU Side RRU power cable Tool-less female connector
(pressfit type) CAUTION l Before installing the RRU power cable, ensure that the upper-level circuit breaker is switched off and the power cable has no voltage. l A drip loop is required for the position between the RRU port and the cable, preventing rain from damaging the RRU. l When installing the RRU power cable, connect the power cable to the RRU connector first and then to the power equipment connector. Incorrect connection sequence or reverse connection of positive and negative poles may damage the RRU or cause personal injury. Procedure Step 1 Connect the tool-less female connector (pressfit type) at one end of the RRU power cable to the power supply socket on the RRU, as shown in Figure 7-27. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 58 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-27 Installing an RRU power cable NOTICE Ensure that the exposed shield layer of the power cable is properly tightened using the clip. Step 2 Connect the connector at the other end of the RRU power cable to the corresponding position on the power device. NOTE l A DCDU-11B/DCDU-12B can supply power to a maximum of six RRUs. Ensure that the RRU power cable is connected to one of LOAD0 to LOAD5 ports on the DCDU-11B/DCDU-12B. l One EPU can supply power to a maximum of six RRUs. Ensure that the RRU power cable is connected to one of RRU0 to RRU5 ports on the EPU. l When the RRU power cable is connected to the EPU, the blue core wire in the tool-less female connector
(pressfit type) is connected to the upper port on the EPU, and the black/brown core wire is connected to the lower port on the EPU. Step 3 Route the cables according to the instructions in Cabling Requirements, and then use cable ties to bind the cables. Step 4 Label the installed cables according to the instructions in Attaching a Cable-Tying Label.
----End 7.12 Closing the Cover Plate of an RRU Cabling Cavity This section describes the procedure for closing the cover plate of an RRU cabling cavity. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 59 RRU3261 Installation Guide Procedure 7 Installing RRU Cables Step 1 Close the clips for the installed cables. Use an M4 torque screwdriver to tighten the screws on each clip to 1.4 Nm (12.39 lbfin.), as shown in Figure 7-28. NOTICE Ensure that the exposed shield layer of the power cable is properly tightened using the clip. Figure 7-28 Closing clips Step 2 Insert waterproof blocks into vacant cable troughs in the cabling cavity, as shown in Figure 7-29. NOTICE Ensure that cables and waterproof blocks are properly inserted into troughs. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 60 RRU3261 Installation Guide 7 Installing RRU Cables Figure 7-29 Correct placement of waterproof blocks Step 3 Close the cover plate of the RRU cabling cavity. Use an M5 torque screwdriver to partially tighten the screws on the cover plate in the sequence shown in Figure 7-30. Then tighten the screws to 2 Nm (17.7 lbfin.) in the same sequence. NOTICE The RRU cabling cavity must be securely tightened to prevent water. Figure 7-30 Closing the cover plate of an RRU cabling cavity Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 61 RRU3261 Installation Guide Step 4 Take off the ESD gloves, and pack up all the tools.
----End 7 Installing RRU Cables Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 62 RRU3261 Installation Guide 8 Checking the RRU Hardware Installation 8 Checking the RRU Hardware Installation Table 8-1 provides the checklist for the RRU hardware installation. Table 8-1 Checklist for the RRU hardware installation SN Item 1 2 3 4 5 6 7 8 9 10 11 12 The position for each device conforms to the engineering drawing and meets the space requirement. Sufficient space is reserved for equipment maintenance. The RRU is securely installed. The cover plate is securely installed on the RRU cabling cavity. Waterproof blocks are securely installed in vacant cable troughs of the RRU cabling cavity, and the cover plate for the cabling cavity is securely installed. In addition, vacant RF ports are covered with dustproof caps and the caps are tightened. There are no connectors or joints on each power cable or PGND cable. The terminals at two ends of each power cable or PGND cable are securely soldered or crimped. None of power cables and PGND cables can be short-circuited or reversely connected. In addition, these cables are not damaged or broken. Power cables and PGND cables are separately bound from other cables. The protection grounding of the RRU and the surge protection grounding of the building share one group of ground conductors. The connectors of each signal cable are intact and securely linked, and these cables are not damaged or broken. Labels are correct, legible, and complete at both ends of each cable, feeder, and jumper. All ground cables are properly grounded. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 63 RRU3261 Installation Guide 9 Powering On an RRU 9 Powering On an RRU After all the devices are installed, check the power-on status of an RRU. NOTICE After you unpack an RRU, you must power on it within 24 hours. If you power off the RRU for maintenance, you must restore power to the RRU within 24 hours. Figure 9-1 shows the RRU power-on check process. NOTE For details about how to power on an RRU, see Powering On an RRU. For details about how to power off an RRU, see section "Powering-Off the RRU" in RRU Maintenance Guide. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 64 RRU3261 Installation Guide 9 Powering On an RRU Figure 9-1 RRU power-on check process
(a) The normal input voltage of an RRU is -48 V DC. The voltage of the external power supply should range from -36 V DC to -57 V DC.
(b) The RUN indicator on the RRU is on for 1s and off for 1s. The ALM indicator is steady off. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 65 RRU3261 Installation Guide 10 Appendix 10 Appendix About This Chapter 10.1 Adding a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side This section describes the procedure for adding a tool-less female connector (pressfit type) to the RRU power cable on the RRU side. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 66 RRU3261 Installation Guide 10 Appendix 10.1 Adding a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side This section describes the procedure for adding a tool-less female connector (pressfit type) to the RRU power cable on the RRU side. Context Figure 10-1 shows the cable diagram on labels. Figure 10-1 Cable diagram on labels
(1) Cable diagram on labels NOTICE Prepare a Tool-Less Female Connector (Pressfit Type) to the RRU Power Cable on the RRU Side by strictly following the following operations. Otherwise, damage to the RRU or personal injury may occur. Procedure Step 1 Determine the length of the power cable for different operations based on the labels, as shown in Figure 10-2. Figure 10-2 Determining the length of the power cable Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 67 RRU3261 Installation Guide 10 Appendix Step 2 Strip the specified length of the sheath off the power cable, as shown in Figure 10-3. Figure 10-3 Stripping the specified length of sheath Step 3 Strip a specified length of sheath off each core wire. The length must be consistent with the length of the notch in the tool-less female connector (pressfit type), as shown in Figure 10-4. Figure 10-4 Stripping the sheath off each core wire Figure 10-5 Matched length Step 4 Add a tool-less female connector (pressfit type) to two core wires. 1. Tighten the screws using a Phillips screwdriver, as shown in Figure 10-6. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 68 RRU3261 Installation Guide Figure 10-6 Tightening screws 10 Appendix 2. Connect the blue core wire labeled NEG(-) to the - port and the black/brown core wire labeled RTN(+) to the + port on the tool-less female connector (pressfit type), and then tighten the screws using a Phillips screwdriver, and then use a torque screwdriver to tighten the M4 screws to 1.4 Nm (12.39 lbfin.), as shown in Figure 10-7. DANGER Do not reversely connect the positive and negative poles. Reverse connection of positive and negative poles may result in equipment malfunctions or personal injury. Therefore, check the power cable connection before powering on the RRU. Figure 10-7 Adding a tool-less female connector (pressfit type) to two core wires 3. After the core wires are installed, ensure that each core wire is securely installed after being dragged with a torque of 30 Nm and all copper wires are inserted in the connector terminal socket. Step 5 Strip the specified length of the sheath off the power cable to expose the intact shield layer, as shown in Figure 10-8. Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 69 RRU3261 Installation Guide 10 Appendix Figure 10-8 Stripping the sheath off the power cable NOTICE Each core wire is exposed outside the tool-less female connector (pressfit type) for 1.5 mm
(0.059 [in.]), as shown in Figure 10-9. Figure 10-9 Inserting core wires into the tool-less female connector (pressfit type)
----End Issue Draft A (2015-07-24) Huawei Proprietary and Confidential Copyright Huawei Technologies Co., Ltd. 70
frequency | equipment class | purpose | ||
---|---|---|---|---|
1 | 2015-08-27 | 2630 ~ 2680 | TNB - Licensed Non-Broadcast Station Transmitter | Original Equipment |
app s | Applicant Information | |||||
---|---|---|---|---|---|---|
1 | Effective |
2015-08-27
|
||||
1 | Applicant's complete, legal business name |
Huawei Technologies Co.,Ltd
|
||||
1 | FCC Registration Number (FRN) |
0007419963
|
||||
1 | Physical Address |
Administration Building, Headquarters of Huawei
|
||||
1 |
Shenzhen, N/A
|
|||||
1 |
China
|
|||||
app s | TCB Information | |||||
1 | TCB Application Email Address |
V******@tuvam.com
|
||||
1 | TCB Scope |
B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
|
||||
app s | FCC ID | |||||
1 | Grantee Code |
QIS
|
||||
1 | Equipment Product Code |
RU3261
|
||||
app s | Person at the applicant's address to receive grant or for contact | |||||
1 | Name |
Z**** X******
|
||||
1 | Telephone Number |
+86-7********
|
||||
1 | Fax Number |
+86-7********
|
||||
1 |
z******@huawei.com
|
|||||
app s | Technical Contact | |||||
n/a | ||||||
app s | Non Technical Contact | |||||
n/a | ||||||
app s | Confidentiality (long or short term) | |||||
1 | Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | Yes | ||||
1 | Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | Yes | ||||
1 | If so, specify the short-term confidentiality release date (MM/DD/YYYY format) | 02/21/2016 | ||||
if no date is supplied, the release date will be set to 45 calendar days past the date of grant. | ||||||
app s | Cognitive Radio & Software Defined Radio, Class, etc | |||||
1 | Is this application for software defined/cognitive radio authorization? | No | ||||
1 | Equipment Class | TNB - Licensed Non-Broadcast Station Transmitter | ||||
1 | Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant) | Remote Radio Unit | ||||
1 | Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application? | No | ||||
1 | Modular Equipment Type | Does not apply | ||||
1 | Purpose / Application is for | Original Equipment | ||||
1 | Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization? | No | ||||
1 | Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization? | No | ||||
1 | Grant Comments | Power output listed is conducted per port. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307. | ||||
1 | Is there an equipment authorization waiver associated with this application? | No | ||||
1 | If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded? | No | ||||
app s | Test Firm Name and Contact Information | |||||
1 | Firm Name |
Huawei Technologies Co., LTD
|
||||
1 | Name |
Z****** F********
|
||||
1 | Telephone Number |
86-75********
|
||||
1 | Fax Number |
86-75********
|
||||
1 |
z******@huawei.com
|
|||||
Equipment Specifications | |||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line | Rule Parts | Grant Notes | Lower Frequency | Upper Frequency | Power Output | Tolerance | Emission Designator | Microprocessor Number | |||||||||||||||||||||||||||||||||
1 | 1 | 27 | 2622.5 | 2687.5 | 32.14 | 0.00109 ppm | 4M48D9W | ||||||||||||||||||||||||||||||||||
1 | 2 | 27 | 2625 | 2685 | 32.74 | 0.00109 ppm | 8M95D9W | ||||||||||||||||||||||||||||||||||
1 | 3 | 27 | 2627.5 | 2682.5 | 33.5 | 0.00109 ppm | 13M4D9W | ||||||||||||||||||||||||||||||||||
1 | 4 | 27 | 2630 | 2680 | 32.81 | 0.00109 ppm | 17M9D9W |
some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details
This product uses the FCC Data API but is not endorsed or certified by the FCC