Countertop Bevi Installation Guide Countertop Machine V1.0 780-0005 REV05 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 1 REV 05 SAFETY NOTICE CAUTION: No user servicing/serviceable parts. This appliance must be properly installed on a GFCI protected circuit. Maximum water inlet supply pressure: 87PSI (0.9 MPa). This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance. Appliance is only to be installed in locations where it can be overseen by trained personnel. The appliance must not be cleaned by a water jet. For indoor use only. 10-32C (50-90F). Appliance shall not be installed in an area where a water jet could be used. Do not store explosive substances such as aerosol cans with a flammable propellant near the appliance. This appliance is climatic class 0: 20C (68F), 50% RH, 9.3C dew point, 7.3 g/kg water vapor mass in dry air. Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed, and maintained in accordance with federal, state, and local codes. Product package is single use and must be discarded and product not reused upon removal from the equipment. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 2 REV 05 Introduction & Table of Contents In this document you will find a step-by-step guide to install the Bevi Countertop Unit. The areas covered are as follows:
Page 4: Video Links and Compliance Statement Page 5: Pre-Installation Requirements Page 6: Tubing Drill Hole Template Page 7: Cabinet Layout Page 12: Installation Donts Page 13: Water Filter Setup Page 14: Filter Head Mounting Hole Template Page 15: Chiller/Carbonator Setup Page 18: Suggested Recirculation Line Routing Page 19: Power Strip Setup Page 20: Power Strip Mounting Hole Template Page 21: Console and Flavor Setup Page 23: Connecting Console to Chiller/Carbonator Page 24: Connecting Console to Power Strip Page 25: Connecting Power Strip to Outlet via Grommet Page 26: CO2 Tank Setup Page 27: CO2 Tank Brackets Mounting Hole Template Page 28: Insulating the Recirculation Lines Page 29: Filling the Ice Bank Page 30: Installing the Backflow Preventer Page 31: Service Panel Startup Page 32: Internet Connection Setup Page 33: Flavors, CO2, & Filter Selection Page 34: Sparkling Flow Rate Calculation Page 35: Touchscreen ID & Incubation Setup Page 36: Technical Support Information 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 3 REV 05 Video Links and Compliance Statement In addition, you can watch the entire installation video online, or view specific stages from the links below:
Full Installation Video bit.ly/ctinstallation Requirements bit.ly/ctrequirements Filter Setup bit.ly/ctfilter Chiller/Carbonator Setup bit.ly/ctcarbonator Power Strip Setup bit.ly/ctpowersetup Console and Flavor Setup bit.ly/ctconsole CO2 Tank Setup bit.ly/ctco2tank Software Setup bit.ly/ctsoftware Changes or modifications not expressly approved by Bevi could void the users authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense. This device contains license-exempt transmitter(s)/receiver(s) that comply with Innovation, Science and Economic Development Canadas license-exempt RSS(s). Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. Cet appareil contient des metteurs/rcepteurs exempts de licence qui sont conformes aux RSS sans licence d'Innovation, Sciences et Dveloppement conomique Canada. L'exploitation est autorise aux deux conditions suivantes : (1) l'appareil ne doit pas produire de brouillage, et (2) l'appareil doit accepter tout brouillage radiolectrique subi, mme si le brouillage est susceptible d'en compromettre le fonctionnement. This equipment complies with FCC and ISED radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with a minimum distance of 20cm between the radiator and your body. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 4 REV 05 Pre-Installation Requirements Or you can watch it here!
bit.ly/ctrequirements Water source Dedicated 3/8 plumbing line, rated for minimum of 145 psi Minimum supply pressure of 50 psi & 5 liters per minute flowrate Note: After measuring static water pressure, dispense 1 L of water from the fully opened water valve and time how long it takes to fill. A completion time of 10 seconds or less should indicate sufficient pressure. Power source 110-120V AC Outlet Internet Access Wi-Fi (2.4-GHz 802.11N Wireless Network) Bevi-approved Mobile Hotspot/Router (3G/4G Cellular Connection) Ethernet Connection (RJ-45) CO2 Tank Either a 5 or 10 lb tank fits in the cabinet Tools & Materials List 10 Adjustable Wrench Power Drill (Corded) and Drill Bit Set 4 Hole Saw Paper Towels Flat Head Screwdriver Extra 3/8 Polyethylene Tubing (Black) Utility Knife Tube Cutter Pitcher or Bucket with 1 L marking Double-Sided Tape (Very High Bond) Countertop Hole Venting Requirements 4 diameter hole in counter, directly over placement of chiller/carbonator. Center of hole must be more than 7 away from wall to allow heat to vent. See Countertop Hole Template on Page 6 for details See Ventilation Guide on Page 7 for details. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 5 REV 05 Tubing Drill Hole Template A minimum of 5 distance is required between the back wall and the edge of the drilled hole, or 7 to the center of the drilled hole. 7 4 Hole through top of counter 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 6 REV 05 Want to easily walk through this decision?
Scan here Cabinet Layout How many cabinets do you have available?
Note: you can use the under sink as a cabinet if you:
Clear the space of any cleaning agents Place BIBs on a tray or shelf 1 (see page 8) 2 (Ideal) Great! It ensures that the avor BIBs are far enough away from the heat generating carbonator, ultimately protecting the avors from any type of degradation. See below. Two-Cabinet Layout Options Layout option #1: If you have more than 24 width in a cabinet Cabinet A Components Cabinet A Dimensions Carbonator +
Co2 Tank Minimum 24 in width 24 in depth 28 in height Cabinet A Ventilation*
Minimum 15 in *
Cabinet B Components Cabinet B Dimensions Cabinet B Ventilation
4 x BIBs 12 in width 24 in depth 28 in height n/a *
2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 7 REV 05 Cabinet Layout Layout option #2: If you have 18 - 24 width in a cabinet Cabinet A Components Cabinet A Dimensions Cabinet A Ventilation*
Carbonator Minimum 18 in width 24 in depth 28 in height Minimum 12 in *
Cabinet B Components Cabinet B Dimensions Cabinet B Ventilation Co2 Tank +
4 x BIBs Minimum 18 in width 24 in depth 28 in height n/a *
*Ventilation Guide for 2 cabinets Tool 1.5 Hole Saw 1.75 Hole Saw 2 Hole Saw 2.5 Hole Saw Sawzall Ventilation Geometry
(15 in) Ventilation Geometry
(12 in) 9 holes 7 holes 5 holes 3 holes 1 x 15 rectangle 7 holes 5 holes 4 holes 3 holes 1 x 12 rectangle Toe Kick Ventilation Drill into the overhang that typically protrudes at the base of a cabinet, or toe kick. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 8 REV 05 Cabinet Layout: Single Cabinet Is the cabinet at least 34?
Yes Great! A single cabinet conguration is the least desirable for ventilation, but if no other option is available, follow the congurations shown below. Follow one of the install layouts below to ensure safety of all components. No Unfortunately, the cabinet conguration does not meet Bevis requirements. Please consult Support to discuss alternatives at 1-866-704-2384. Layout #3: Single Cabinet, 34+, chiller venting out front Note: Stack the avor BIBs only two boxes high right next to one another with the spout at the front or side (not facing upwards Ensure that they are closer to the front of the cabinet so that they are close to the ventilation holes Cabinet A Components Cabinet A Dimensions Cabinet A Ventilation**
Carbonator +
Co2 Tank +
4 x BIBs Minimum 34 in width 24 in depth 28 in height Minimum 25 in **
2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 9 REV 05 Cabinet Layout: Single Cabinet Layout #4: Single Cabinet, 34+, chiller venting sideways (not to wall) Cabinet A Components Cabinet A Dimensions Cabinet A Ventilation**
Carbonator +
Co2 Tank +
4 x BIBs Minimum 34 in width 24 in depth 28 in height Minimum 25 in **
Layout #5: Single Cabinet, 34+, chiller venting out front, 4 stacked BIBs If BIBs are stacked 4 high, in addition to the toeboard ventilation, two door vents also need to be installed on the cabinet Cabinet A Components Cabinet A Dimensions Cabinet A Ventilation**
Carbonator +
Co2 Tank +
4 x BIBs Minimum 34 in width 24 in depth 28 in height Minimum 25 in
(toeboard)
+ 2 door vents
(110 in) **
2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 10 REV 05 Cabinet Layout: Single Cabinet
**Ventilation Guide for 1 cabinet Tool 1.5 Hole Saw 1.75 Hole Saw 2 Hole Saw 2.5 Hole Saw Sawzall Ventilation Geometry
(25 in) 15 holes 11 holes 8 holes 5 holes 1 x 25 rectangle 1 x 12.5 rectangle
(x2) Toe Kick Ventilation Drill into the overhang that typically protrudes at the base of a cabinet, or toe kick. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 11 REV 05 Installation Donts DO NOT STAND BIBS UP WITH SPOUTS ON TOP DO NOT PROP BIBS UP ON OTHER ITEMS IN CABINET DO NOT PLACE OTHER ITEMS IN CABINET (E.G. CLEANING SUPPLIES, FOOD, ETC.) DO NOT COVER VENTILATION HOLES DO NOT PLACE THE HEAD UNIT ONLY PARTIALLY OVER THE COUNTERTOP HOLE DO NOT PLACE POWER STRIP OR OPTCONNECT ON TOP OF CARBONATOR 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 12 REV 05 Step 1: Water Filter Setup Filter Head Water Block Assembly Filter Cartridge Or you can watch it here!
bit.ly/ctfilter Screws and locking clips located in Hardware bag in Box 1 of 3 Filter should be installed under sink, next to water source Drill screw holes according to Filter Housing Hole Template, Page 14.
#8 Wood Screws To Chiller/
Carbonator Ensure there is a water shutoff valve installed by the tap water source in case of emergency. Show shutoff valve locations to customer before finishing installation. Tap Water Source 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 13 REV 05 Filter Head Mounting Hole Template Step 1: Cut out and tape template to desired installation location. Make sure you have enough clearance for the filter to be mounted correctly. Step 2: Drill 1/8 pilot holes in each of the marked locations. Step 3: Install Filter Head using #8 wood screws. 1 1/
2 1 5/
8 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 14 REV 05 Step 2: Chiller/Carbonator Setup Or you can watch it here!
bit.ly/ctcarbonator Chiller/Carbonator device located in Box 3 of 3 Attach fittings with locking clip as illustrated below Sparkling Out Fitting In CO2 Fitting Still Out Fitting Components for this step located in Carbonator connectors bag within Valves and Connectors bag located in Box 1 of 3 Ice Bank Fill/Empty Fitting Water In Fitting 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 15 REV 05 Step 2: Chiller/Carbonator Setup Or you can watch it here!
bit.ly/ctcarbonator Attach components using locking clips from Hardware bag Flow Compensator NOTE: ARROWS INDICATE DIRECTION OF WATER IN FLOW COMPENSATOR Manual Valve Remove recirculation jumper Overflow Tube Pressure Regulator Front View Components for this step located in Valves and Connectors bag and power cord from the Power bag located in Box 1 of 3 Manual Valve Power Cord NOTE: ENSURE THAT ARROW ON PRESSURE REGULATOR IS IN THE SAME DIRECTION AS THE WATER FLOW Leak Detector 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 16 REV 05 Step 2: Chiller/Carbonator Setup Or you can watch it here!
bit.ly/ctcarbonator Connect fittings using the tubing cut to specified length NOTE: Wrap exposed tubes and fittings from the recirculation line with foam insulation tape from Console Mounting bag to prevent condensation Sparkling Out In CO2 Ice Bank Fill/Empty Water In Attach recirculation lines from console tube bundle Still Out Water Source from Filter Tip: Wrap paper towel around the Leak Detector while doing the install to avoid tripping the valve Front View 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 17 REV 05 Step 3: Suggested Recirculation Line Routing NOTE: Avoid slopes and curves in the recirculation line, which allows water from condensation to pool in the line 1 Run recirculation line directly down from attachment point to carbonator 4 Route line straight up through countertop hole to console 2 Use 90 degree turns when routing the line 3 If possible, use the carbonator tray as a channel to guide the line 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 18 REV 05 Step 4: Power Strip Setup Or you can watch it here!
bit.ly/ctpowersetup Components located in Power and Hardware bag located in Box 1 of 3 Mounting Instructions:
Install via included #4 wood screws. Drill holes according to Power Strip Mounting Template, Page 20. x4 Power Strip Mount power strip Note: Page 25 includes to instructions/options for side of cabinet, with connecting the power easy access to power strip to an outlet button from the cabinet door When mounting the power strip, the on/off switch should be in an easy-to-access location. Show this switch to the customer before finishing installation. NOTE: DO NOT PLACE POWER STRIP IN A LOCATION THAT HAS INCREASED CHANCES OF WATER EXPOSURE 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 19 REV 05 S t e p 3
U s e
4 w o o d s c r e w s t o i n s t a l l P o w e r S t r i p
. S t e p 2
D r i l l 1
1 6 p i l o t h o e s l i n e a c h o f t h e m a r k e d l o c a t i o n s
. e n o u g h c l e a r a n c e f o r t h e p o w e r s t r i p t o b e m o u n t e d c o r r e c t l y
. S t e p 1
C u t o u t a n d t a p e l t e m p a t e t o d e s i r e d i n s t a l l a t i o n l o c a t i o n
. M a k e s u r e y o u h a v e 3 7
1 6 2 9
3 2 M o u n t i n g H o e T e m p a t e l l P o w e r S t r i p 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 20 REV 05 Step 5: Console & Flavor Setup Console located in Box 2 of 3 Or you can watch it here!
bit.ly/ctconsole Make sure console is placed directly above the Chiller/Carbonator unit completely covering the 4 hole. Edge of 4 hole must be at least 5 from the back wall See page 22 for instructions on securing console to the counter Drill countertop hole according to Countertop Hole Template, Page 6. Flavor valves for this setup located in Valves and Connectors bag in Box 1 of 3 Connect flavor lines to boxed flavor concentrates Do not install the unit next to a dishwasher Connect still water, sparkling water, and ice bank recirculation lines to corresponding tubes in the insulated bundle, see Page 17. Keep the flavors as low as possible if they are in the same cabinet with the Chiller/Carbonator, but generally we recommend they be separated from the Chiller/Carbonator. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 21 REV 05 Step 5: Console & Flavor Setup Foam sealing tape Apply foam sealing tape from Console Mounting bag along the edges on the bottom of the console Overlap the tape at the corners so the console bottom is entirely sealed CONSOLE INTERIOR COUNTER COUNTER Secure console with the C-Clamps provided in the Console Mounting bag It is critical that the console unit fully cover the countertop hole. Any exposed gaps will reduce the ability of the console to create a proper seal on the countertop. This will reduce air movement through the system and will result in overheating of the cabinet. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 22 REV 05 Step 6: Connecting Console to Chiller/Carbonator Or you can watch it here!
bit.ly/ctconsole CHILLER/CARBONATOR MUST BE POWERED OFF FOR THIS STEP To Console Remove cable caps from water lines Still Water & Sparkling Water Valves Ice Bank Recirculation Lines Attach on carbonator From Chiller/Carbonator 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 23 REV 05 Step 7: Connecting Console to Power Strip Or you can watch it here!
bit.ly/ctconsole Connector from Console 24VDC Adapter Power Strip 24V DC adapter located in Power bag in Box 1 of 3 Connector from 24VDC Adapter 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 24 REV 05 Step 8: Connecting Power Strip to Outlet Starting in July 2022, a hole with a pre-installed grommet has been added to the back panel of the console that allows for the passage of any of the following cables:
Power Strip Cable Countertop Console Power Cable Carbonator Power Cable Ethernet Cable Under no circumstances can any items other than the above listed cables be routed through the grommet (i.e. no routing of water lines nor other non-listed cables)
cable The grommet is useful if the nearest available wall outlet is located above the countertop. In these scenarios, mount the power strip under the countertop (per step 4) with the cable routed up through the console and out of the console via the grommet. Connect the power strip cable to the 110v wall outlet above the countertop. Connect the console and carbonator power cables to the mounted power strip under the countertop (per step 7). There may be scenarios where the unit needs to connect to an ethernet jack above the countertop. For those scenarios, route the the ethernet cable through the console and out the grommet. A typical example scenario is pictured below:
2020 Bevi. All Rights Reserved 2020 Bevi. All Rights Reserved 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 support@bevi.co (866)-704-2384 support@bevi.co (866)-704-2384 Page 25 REV 05 REV 05 REV 05 Step 9: CO2 Tank Setup Components for these tasks located in Hardware bag in Box 1 of 3 NOTE: Either a 5 or 10 lb tank fits in the cabinet Drill holes according to CO2 Tank Brackets Mounting Hole Template, Page 26.
#8 Wood Screws Set to 87 psi (6 bar) Use a flathead screwdriver to adjust the pressure. Clockwise: Increase Pressure Counter-Clockwise: Decrease Pressure To Chiller/Carbonator Or you can watch it here!
bit.ly/ctco2tank There will be extra locking clips at the end of installation Tank Strap Make sure the CO2 regulator fits in the cabinet Strap around middle of tank Place tank + mounting hardware in any cabinet, except next to Chiller/Carbonator 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 26 REV 05 CO2 Tank Brackets Mounting Hole Template Step 1: Cut out and tape template to desired installation location. Make sure you have enough clearance for the CO2 tank to be mounted correctly. Step 2: Drill 1/8 pilot holes in each of the marked locations. Step 3: Use #8 wood screws to install the CO2 Tank Brackets, included in the Hardware bag. 4 2 1/8 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 27 REV 05 Step 10: Insulating the Recirculation Lines The insulation tape can be found in the Console Mounting bag Recirculation Loop Insulation Use the tape to completely wrap any exposed tubes extending from the recirculation line bundle, which could develop condensation Use the tape to also wrap the fittings attached to the recirculation tubes, which can also develop condensation 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 28 REV 05 Step 11: Filling the Ice Bank Or you can watch it here!
bit.ly/ctco2tank Ice Bank Fill/Empty Water In Overflow Tube Detach the water inlet line from the carbonator and reattach to the Ice Bank Fill fitting Detach the overflow tube from the securing clips on the front of the carbonator Place the end of the overflow tube in a bucket Open the water source valve to fill the ice bank until water trickles into the bucket Once water starts to fill the bucket, close the water source valve Replace the overflow tube in the securing clips on the front of the carbonator Detach the water inlet line from Ice Bank Fill fitting and reattach to the Water In fitting 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 29 REV 05 12:
Assemble the backflow preventer per the included one page instructions (995-0002) that shipped in the backflow preventer kit. The assembly SOP is also found as a tech tip on partners.bevi.co. Once assembled, follow step 10 for installation. Page 30 REV 05 REVREVREV 05 Step 13: Service Panel Startup Or you can watch it here!
bit.ly/ctsoftware 4 2 3 1. Enter the Service Panel. 2. When prompted, select Start Service. 3. Select the Pencil icon to open the Unit Info popup window. 4. Fill out the Unit Info popup window. When finished, select SAVE. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 31 REVREV 005 Step 14: Internet Connection Setup Or you can watch it here!
bit.ly/ctsoftware 5 SirHeroTheDog 6 7 5. 6. 7. 8. Find the icon, and select RECONNECT to bring up the Internet popup window. If using a Wifi connection, select Connect Wirelessly on the Internet popup window. Select the appropriate Wifi network from the list. If connecting via OptConnect or Ethernet, select the appropriate option on the Internet popup window, and follow the instructions. The icon should now be green. If not, you will need to troubleshoot the connection. 8 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 32 REV 05 Step 14: Flavors, CO2, & Filter Selection 9 10 12 11 9. 10. 11. 12. Select RESTOCK for each flavor. You will be prompted to key in the corresponding flavor number. Prime each flavor line using the red PRIME button. Find the CO2 section and select RESTOCK. Select the appropriate tank type on the popup window. Find the Filter section and select RESTOCK. For Countertop Bevi units, select the 3M Filter option. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 33 REV 05 Step 15: Sparkling Flow Rate Calculation 14 15 16 17 13. Use a 1L measured container (water bottle or collapsible bucket with gradiation). 14. Under Filter tap on Check Flow Rate. Press and hold the SPARKLING button to dispense. 15. Hold a sparkling dispense until 1L has been dispensed into the container. The panel will automatically calculate the flow rate. 16. Once flow rate is calculated, hit save if the number is between 3L/in and 3.5 L/min. 17. 18. If the number is lower/higher, use a 6mm hex wrench or flathead screwdriver to tighten/loosen the flow compensator. Tightening lowers the flow rate and loosening increases the flow rate. Exit the service panel and follow the steps above 13-16 until calibration meets requirements. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 34 REV 05 Step 16: Touchscreen ID & Incubation Setup 19 20 16 21 19. If needed, you can find the Touchscreen ID above the pencil icon. 20. When all other software steps are complete, find the Other section, and select START INCUBATION to bring up the Incubation popup window. 21. 22. Select START INCUBATION to begin the Incubation process. Exit the service panel. You should see an Incubation timer screen. NOTE: INCUBATION IS A MANDATORY PART OF THE INSTALLATION PROCESS. WITHOUT IT, THE BEVI TEMPERATURE WILL BE TOO HIGH TO PROPERLY OPERATE. DO NOT SKIP THIS STEP. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 35 REV 05 Congratulations!
You have now completed the Countertop Bevi installation. If you have any questions or issues, call our support line at (866)-704-2384, or email us at support@bevi.co. 2020 Bevi. All Rights Reserved support@bevi.co (866)-704-2384 Page 36 REV 05