all | frequencies |
|
|
|
exhibits | applications |
---|---|---|---|---|---|---|
manuals |
app s | submitted / available | |||||||
---|---|---|---|---|---|---|---|---|
1 2 |
|
Users Manual Part 1 | Users Manual | 576.72 KiB | ||||
1 2 |
|
Users Manual Part 2 | Users Manual | 1.33 MiB | ||||
1 2 |
|
Users Manual Part 3 | Users Manual | 1.11 MiB | ||||
1 2 | Cover Letter(s) | |||||||
1 2 | Cover Letter(s) | |||||||
1 2 | Cover Letter(s) | |||||||
1 2 | Cover Letter(s) | |||||||
1 2 | External Photos | |||||||
1 2 | Internal Photos | |||||||
1 2 | ID Label/Location Info | |||||||
1 2 | ID Label/Location Info | |||||||
1 2 | RF Exposure Info | |||||||
1 2 | Test Report | |||||||
1 2 | Test Report | |||||||
1 2 | Test Setup Photos |
1 2 | Users Manual Part 1 | Users Manual | 576.72 KiB |
Natural Gas Solutions 100G Datalogging Installation Guide -
Direct Mount Identification 100G Datalogging Installation Guide - Direct Mount 03/6/2009 TDC-0823-000 Endpoint Part Numbers: 100G Endpoint: ERG-5000-001, ERG-5000-002, ERG-5000-003, ERG-5000-004, ERG-5000-005, ERG-5000-006, ERG-5000-007, ERG-5000-008 100G Datalogging Endpoint: ERG-5002-001, ERG-5002-002, ERG-5002-003, ERG-5002-004, ERG-5002-005, ERG-5002-006, ERG-5002-007, ERG-5002-008 Copyright 2009 Itron, Inc. All rights reserved. Applicable Patents U.S. Patent Numbers: 4,614,945; 4,753,169; 4,768,903; 4,799,059; 4,867,700 Canadian Patent Numbers: 1,254,949; 1,267,936; 1,282,118 Compliance Statement This device complies with Part 15 of the FCC Rules. Operation of this device is subject to the following two conditions:
This device may not cause harmful interference. This device must accept any interference that may cause undesirable operation. This device must be permanently mounted such that it retains a distance of 20 centimeters (7.9 inches) from all persons in order to comply with FCC RF exposure levels. Compliance Statement This equipment has been tested and found to comply with the limits, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. Operation is subject to the following conditions:
This device may not cause interference. This device must accept any interference that may cause undesired operation of the device. Compliance Statement This equipment complies with policies RSS-210 and RSS-GEN of the Industry Canada rules. Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. Trademark Notice Itron and Endpoint-Link are registered trademarks of Itron, Inc. All other product names and logos in this documentation are used for identification purposes only and may be trademarks or registered trademarks of their respective companies. Suggestions If you have comments or suggestions on how we may improve this documentation, send them to TechnicalCommunicationsManager@itron.com If you have questions or comments about the software or hardware product, contact Itron Technical Support:
Contact Internet: www.itron.com Mail: Itron, Inc. Attention: Customer Care, 2111 N Molter Road, Liberty Lake, WA 99019 E-mail: support@itron.com Phone: 1 800 635 8725 WARNING! Follow these procedures to avoid injury to yourself or others:
The lithium battery may cause a fire or chemical burn if it is not disposed of properly. Do not recharge, disassemble, heat above 100 Celsius (212 Fahrenheit), or incinerate the lithium battery. Keep the lithium battery away from children. Replace the lithium battery only with batteries meeting Itron specifications. Any other battery may cause a fire or explosion. WARNING! Only authorized Itron personnel should attempt repairs on Itron equipment. Attempts to do so by others might void any maintenance contract with your company. Unauthorized service personnel might also be subject to shock hazard on some Itron equipment if removal of protective covers is attempted. WARNING! To prevent ignition of flammable or combustible atmospheres, disconnect power before servicing. WARNING! Substitution of components may impair intrinsic safety. 100G Datalogging Installation Guide - Direct Mount ii Transportation Classification The Federal Aviation Administration prohibits operating transmitters and receivers on all commercial aircraft. When powered, the 100G Datalogging Endpoint is considered an operating transmitter and receiver and cannot be shipped by air. All product returns must be shipped by ground transportation. Modifications and Repairs To ensure system performance, this device and antenna shall not be changed or modified without the expressed approval of Itron. Any unauthorized modification will void the user's authority to operate the equipment. Meter Installation/Removal In the event of malfunction, all repairs should be performed by Itron. It is the responsibility of users requiring service to report the need for service to Itron. 100G Datalogging Installation Guide - Direct Mount iii Document Conventions The following documentation conventions are used:
CAUTION! This type of note warns the user that failure to heed the information in the note could result in loss of data. Be sure to carefully read a CAUTION note and heed the advice/instructions. WARNING! This type of note is used to warn of potential physical harm to the user or hardware. It is critical that you pay strict attention to WARNING notes, read the information carefully, and heed the advice, instructions. This type of note provides the user with extra hints/tips to make a task easier to perform or a concept easier to understand. This type of note supplies generic information to the user. The information could be ignored and the user could still continue with a task without suffering any adverse consequences. 100G Datalogging Installation Guide - Direct Mount iv Contents Programming the 100G Datalogging Gas Endpoint Assembly ......................................................... 25 Attaching the 100G Datalogging Gas Endpoint Assembly to the Sensus Meter .............................. 27 Programming the 100G Datalogging Gas Endpoint Assembly ......................................................... 16 Attaching the 100G Datalogging Gas Endpoint Assembly to the Elster American Meter ................. 18 Transmission Modes ........................................................................................................................... 1 Specifications ...................................................................................................................................... 2 Related Documents .................................................................................................................. 2 Meter Compatibility List ....................................................................................................................... 2 Installation Prerequisites ..................................................................................................................... 8 Chapter 1 100G Datalogging Gas Endpoint ................................................................ 1 Chapter 2 Elster American Meter Installation ........................................................... 11 Chapter 3 Sensus/Rockwell Meter Installation ......................................................... 21 Chapter 4 Itron/Actaris Meter Installation ................................................................. 31 Chapter 5 National/Lancaster Meter Installation ...................................................... 47 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation ........ 57 Chapter 7 Sensus/Rockwell Commercial Meter Installation ................................... 73 Programming the 100G Datalogging Gas Endpoint Assembly ......................................................... 34 Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter ....................... 36 Attaching the 100G Datalogging Gas Endpoint Assembly to Flat-faced Itron/Actaris Meters 39 Securing Brass Meter Tags to Flat-faced Meters ................................................................... 43 Removing the Index/ Index Assembly from the Meter ...................................................................... 58 Programming the 100G Datalogging Commercial Gas Endpoint ..................................................... 60 Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter 67 Programming the 100G Datalogging Gas Endpoint Assembly ......................................................... 53 Attaching the 100G Datalogging Gas Endpoint Assembly to the National/Lancaster Meter ............ 55 Removing the Index/ Index Assembly from the Meter ...................................................................... 73 Programming the 100G Datalogging Gas Endpoint .......................................................................... 74 Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter ............................................................................................................................... 76 100G Datalogging Installation Guide - Direct Mount v Contents Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation ......................... 81 Installation Prerequisites ......................................................................................................... 81 Installation Examples .............................................................................................................. 82 Programming the 100G Datalogging Gas Endpoint Assembly ......................................................... 83 B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information .................................................................................................................. 85 B3, LMMA and S3A CTR/TC Meter Drive Rates: Residential Direct Drive Programming* ... 87 Installing the Residential 100G Datalogging Gas Endpoint Assembly to the Dresser ROOTS Rotary Meter ........................................................................................................................ 89 Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter ... 90 Programming the 100G Datalogging Commercial Gas Endpoint Assembly .......................... 91 B3, LMMA, and S3A CD/TD Dresser ROOTS Series Meter Drive Rates .............................. 93 To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter ............................. 95 Completed Installation Examples ............................................................................................ 97 vi 100G Datalogging Installation Guide - Direct Mount C H A P T E R 1 100G Datalogging Gas Endpoint Itron 100G Datalogging Gas Endpoints are radio-frequency (RF) devices designed to transmit meter data to an RF meter reading device within transmission distance of the endpoint. 100G Datalogging Gas Endpoints have the same increased output power as the first generation 100G Gas Endpoints for greater RF transmission distance. The 100G direct-
mount endpoint reads and transmits a Standard Consumption Message (SCM) with magnetic-tamper and tilt-tamper data. The Itron 100G Datalogging direct-mount endpoint adds functionality by storing up to 40 days of hourly data. This installation guide provides step-by-step instructions for installing the 100G Gas Endpoint and the 100G Datalogging Gas Endpoint on a wide variety of meters. This installation guide refers to both 100G endpoint versions as the 100G Datalogging Endpoint. Mechanical installation procedures are identical for both modules. 100G Datalogging Gas Endpoint compatible meters are listed in the Meter Compatibility List. Transmission Modes The 100G Datalogging Gas Endpoint transmits in one of three modes:
Fixed Network Mode In this mode, a 100G Datalogging Gas Endpoint transmits a high-powered RF message every 60 seconds. Output power in this mode is 250 milliwatts or +24dBm; expected battery life is 20 years. Mobile and Handheld Mode In this mode, a 100G Datalogging Gas Endpoint transmits a medium-powered RF message every 15 seconds. Output power in this mode is 10 milliwatts or +10dBm; expected battery life is 20 years.
(Optional) Hard to Read Mobile and Handheld Mode In this mode, a 100G Datalogging Gas Endpoint transmits a high-powered RF message every 30 seconds. Output power in this mode is 250 milliwatts or +24dBm; expected battery life decreases to 15 years in this mode. The Hard to Read Mobile and Handheld Mode should only be used for exceptionally hard-to-read applications (such as meters installed on roof tops or in sub-basements). An FCC license is not required to read 100G Datalogging Gas Endpoint. 100G Datalogging Installation Guide - Direct Mount 1 Chapter 1 100G Datalogging Gas Endpoint Specifications Functional Specifications Power Source 100G 100G Datalogging Tamper Detection FCC Compliance Industry Canada Compliance Intrinsically Safe per Product Identification Construction Materials Operational Specifications Operating Temperatures Operating Humidity Program Frequency Transmit Frequency Data Integrity Description Two "A" cell lithium batteries One "A" cell lithium battery Tilt tamper and magnetic tamper Part 15 certified RSS-210 certified UL Class I, Division 1, Groups C and D Numeric and barcoded endpoint type and serial number Gray polycarbonate housing and back plate with encapsulated electronics Description
-40 to 158 F (-40 to +70 C) 5 to 95 percent relative humidity 908 MHz Spread spectrum 908 to 924 MHz ISM band Verified in every data message Related Documents Document Title Gas Endpoint Meter Compatibility List Gas Endpoint Ordering Guide 100G Datalogging Specification Sheet Endpoint Link Programming Guide Document Part Number PUB-0117-002 PUB-0117-001 Publication 100941SP-01 TDC-0744 Meter Compatibility List The Meter Compatibility table lists meters compatible with the 100G Datalogging Gas Endpoint. Due to continuous research, product improvements, and enhancements, Itron reserves the right to change this list without notice. Note On rare occasions the location of endpoint-to-meter mounting holes on older diaphragm gas meters might not match up with the mounting holes on the 100G Datalogging Gas Endpoint. This can prevent the 100G Datalogging Gas Endpoint from properly mounting to the meter. 2 100G Datalogging Installation Guide - Direct Mount 100G Series Meter Compatibility List Mfg. Model Description Class Comments Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian W75AL AL-175 AT-175 ALC-175 AT-210 Residential Residential Residential Residential Residential AL-225 Canada only Residential AL-250 AR-250 AC-250 AM-250 AL-310 AL-350 AT-350 AL-425 AC-630 Residential Residential Residential Residential Residential Residential Residential Residential Residential 5B 225 Aluminum case Residential Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only 35B 60B 80B 250B 500B Iron case Commercial Iron case Commercial Iron case Commercial Must have front reading index. Iron case Commercial Iron case Commercial AL800 Commercial Aluminum case meters only 100G Datalogging Installation Guide - Direct Mount Meter Compatibility List Endpoint Type 100G 100G Datalogging Endpoint Part No. ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G Datalogging ERG-5000-001 ERG-5002-001 100G 100G 100G 100G 100G 100G ERG-5000-007 ERG-5000-007 ERG-5000-007 ERG-5000-007 ERG-5000-007 ERG-5000-007 3 Chapter 1 100G Datalogging Gas Endpoint Mfg. Model Description Class Comments Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Elster American/
Canadian Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell AL1000 AL1400 AL2300 AL3000 AL5000 Commercial Commercial Commercial Commercial Commercial R-175 11-tooth Residential Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only Aluminum case meters only 24- and 30-tooth gears are not compatible. R-200 11-tooth Residential RT-200 11-tooth Residential RC-225 11-tooth
(Canada only) Residential RT-230 11-tooth Residential Endpoint Type 100G 100G 100G 100G 100G Endpoint Part No. ERG-5000-007 ERG-5000-007 ERG-5000-007 ERG-5000-007 ERG-5000-007 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 R-275 11-tooth Residential 24- and 30-tooth gears are not compatible. 100G 100G Datalogging ERG-5000-002 ERG-5002-002 RT-275 11-tooth Residential R-315 11-tooth Residential 250 310 11-tooth Residential 11-tooth Residential S-110 11-tooth Residential S-200 11-tooth Residential 175-S 18-tooth Residential RT-100 18-tooth Residential S-190 18-tooth Residential 24- and 30-tooth gears are not compatible. 24- and 30-tooth gears are not compatible. 24- and 30-tooth gears are not compatible. 24- and 30-tooth gears are not compatible 24- and 30-tooth gears are not compatible. 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-004 ERG-5002-004 100G 100G Datalogging ERG-5000-004 ERG-5002-004 100G 100G Datalogging ERG-5000-004 ERG-5002-004 4 100G Datalogging Installation Guide - Direct Mount Mfg. Model Description Class Comments Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell Sensus/Invensys/
Equimeter/Rockwell MR8
(R-275 Metric) MR12
(R-415 Metric) 750 1000 1600 3000 5000 Sensus/Invensys/
Equimeter/Rockwell 10000 National/ Lancaster 175 National/ Lancaster U175 UL175 National/ Lancaster 250 S-120 11-tooth Residential T-120 11-tooth Residential T-110 11-tooth Residential R-415 18-tooth Residential RT-360 18-tooth Residential 16-tooth Residential 16-tooth Residential Commercial Commercial Commercial Commercial Commercial Commercial Residential Residential Residential Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague 175 3-hole index box Residential 175 WC 3-hole index box Residential Meter Compatibility List Endpoint Type Endpoint Part No. 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-002 ERG-5002-002 100G 100G Datalogging ERG-5000-004 ERG-5002-004 100G 100G Datalogging ERG-5000-004 ERG-5002-004 100G 100G Datalogging ERG-5000-003 ERG-5002-003 100G 100G Datalogging ERG-5000-003 ERG-5002-003 100G 100G 100G 100G 100G 100G 100G ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-006 100G ERG-5000-006 100G ERG-5000-006 100G 100G ERG-5000-005 ERG-5000-005 Older meters may have endpoint-to-meter mounting hole variations that can make them incompatible. Vertical index only Vertical index only Vertical index only Actaris/Schlumberger/
Sprague direct-read
(odometer) indexes cannot be used. Actaris/Schlumberger/
Sprague direct-read
(odometer) indexes cannot be used. Actaris/Schlumberger/
Sprague direct-read
(odometer) indexes cannot be used. Index boxes with 3 mounting holes Index boxes with 3 mounting holes 100G Datalogging Installation Guide - Direct Mount 5 Chapter 1 100G Datalogging Gas Endpoint Mfg. Model Description Class Comments 175 Combination 3-hole index box Integrated regulator Residential Index boxes with 3 mounting holes Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Itron/Actaris/
Schlumberger/
Sprague Endpoint Type Endpoint Part No. 100G ERG-5000-005 100G 100G 100G 100G 100G 100G 100G 100G 100G 100G ERG-5000-005 ERG-5000-005 ERG-5000-005 ERG-5000-005 ERG-5000-005
+ CFG-0015-001 ERG-5000-005 ERG-5000-005 ERG-5000-005 ERG-5000-005 ERG-5000-005 +
CFG-0015-001 100G ERG-5000-005 100G 100G 100G 100G ERG-5000-005 ERG-5000-005 ERG-5000-005 ERG-5000-007 100G ERG-5000-007 210 240 Residential Canadian Version of 250 Residential 240 Combination Integrated regulator Residential Residential 240 240 240 250 250 WC Residential Residential Residential 1-hole cover flat face Residential Requires Itron 1A Adapter P/N CFG-0015-001 Kit 2-hole cover Residential 250 Combination Integrated regulator 1A METRIS 250 Flat face Includes 3-dial, 2cf indexes. 3-hole index box Slant-faced Residential Requires Itron 1A adapter kit, CFG-0015-001 Residential Index boxes with 3 mounting holes 305 Combination Integrated regulator Residential 400 Slant-faced Residential 400A Slant-faced Residential 675A Top-mount index Commercial 800A Top-mount index Commercial Requires Itron/Actaris adapter p/n 80005901-001;
purchase from Itron/Actaris Requires Itron/Actaris adapter p/n 80005901-001;
purchase from Itron/Actaris 6 100G Datalogging Installation Guide - Direct Mount Mfg. Model Description Class Comments 1000A Top-mount index Commercial Requires Itron/Actaris adapter p/n 80005901-001;
purchase from Itron/Actaris Meter Compatibility List Endpoint Type 100G Endpoint Part No. ERG-5000-007 Itron/Actaris/
Schlumberger/
Sprague EMCO EMCO EMCO EMCO EMCO
#2
#3
#4
#4
#5 Commercial Commercial Commercial Commercial Commercial Commercial Dresser ROOTS Series B3 8C - 56M 8C - 16M CTR TC
(No pulser, No instrument drive) Dresser ROOTS Series A1
(LMMA) 1.5M - 5M CTR
(No pulser, No instrument drive) Commercial Dresser ROOTS Dresser ROOTS Series A1
(LMMA) 7M - 16M Series A1
(LMMA) 1.5M - 16M CTR
(No pulser No instrument drive) TC
(No pulser No instrument drive) Commercial Commercial Dresser ROOTS 5C/8C15 Series Z compact meter Commercial 100G 100G 100G 100G 100G To attach an Elster American endpoint, install Dresser's Elster American AMR adapter kit. To attach an Elster American endpoint, install Dresser's Elster American AMR adapter kit. To attach an Elster American endpoint, install Dresser's Elster American adapter kit. To attach an Elster American endpoint, install Dresser's Elster American AMR adapter kit. To attach an Elster American endpoint, install Dresser's Elster American adapter kit. 100G 100G Datalogging Dresser adapter P/N 059599-000 100G 100G Datalogging Dresser adapter P/N 058530-610 100G 100G Datalogging Dresser adapter P/N 058531-610 100G 100G Datalogging Dresser adapter P/N 058224-641 100G 100G Datalogging Dresser adapter P/N 059847-000 ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-008 ERG-5000-001 ERG-5002-001 ERG-5000-001 ERG-5002-001 ERG-5000-001 ERG-5002-001 ERG-5000-001 ERG-5002-001 ERG-5000-001 ERG-5002-001 Dresser ROOTS B3/LMMA Instrument drive CD/TD Commercial Standard index drive and no instrument. 100G ERG-5000-007 100G Datalogging Installation Guide - Direct Mount 7 Chapter 1 100G Datalogging Gas Endpoint Installation Prerequisites Prior to installation, verify you have the following items:
1. 100G Datalogging Gas Endpoints designed for your specific brand of residential or commercial gas meters (endpoints include new tamper seals). 2. A compatible meter (see the Meter Compatibility List on page 2). 3. A compatible index. Itron 100G Datalogging Gas Endpoints are compatible with standard dial and direct-read (odometer) indexes. Exceptions are noted on the Meter Compatibility List on page 2. 4. Installation tools (provided by installer or customer) Small and medium flat-blade or Phillips screwdrivers - to remove and tighten index and index-cover screws. Side-cutting plier/wire snips - to cut wire seals, if applicable. Small putty knife - residential meters. Meter seals, wire seal, and seal press - to protect the meter from tampering, if applicable. 11/32-inch nut driver or other blunt tool - to securely seat new tamper plugs over screw holes. FC200SR handheld computer with Endpoint-Link or EndPoint-Link Pro software - to program and check 100G Datalogging Gas Endpoint installation and operation. Caution The 100G Datalogging Gas Endpoints can only be programmed using FC200SR Handheld Computers loaded with EndPoint-Link or EndPoint-Link Pro software version 5.3 or later. 8 100G Datalogging Installation Guide - Direct Mount Installation Prerequisites Replacement screws - to mount the 100G Datalogging Gas Endpoint assembly to the meter and the index to the endpoint housing:
Replacement Screws Meter Elster American Sensus/Rockwell Itron/Actaris To mount the 100G Datalogging Gas Endpoint on the meter:
1/4 - 20 x 5/8" slotted, Fillister head 10 - 24 x 5/8" slotted Fillister head 10 - 24 x 5/8" slotted Fillister head Itron Part Number National/Lancaster 10 - 24 x 3/4" Phillips flat-
SCR-0014-004 head stainless steel Commercial Meter To mount the 100G Datalogging Commercial endpoint on the meter:
Itron Part Number Elster American 2A x 3.25" length, slotted round-head drilled to accept utility-approved wire seals SCR-0062-001
(Elster American) Sensus/Rockwell 2A x 3.63" length, slotted round-head drilled to accept utility-approved wire seals SCR-0062-002 To mount the index on the 100G Datalogging Gas Endpoint housing:
8 - 32 x 3/16" slotted, round pan-head 6 - 32 x 5/8" slotted, round pan-head 10 - 24 x 1/4" slotted, round pan-head 6 - 19 x 3/8" thread-forming, Phillips pan-head to mount indexes with legs 6 - 19 x 3/8" thread-forming, Phillips, Fillister head to mount indexes with screw holes To mount the index (and index assembly, if applicable) on the 100G Datalogging Commercial endpoint housing:
12 - 24 x 1/2" slotted, Fillister head machine screws, drilled to accept utility-approved wire seals 2A x 2.94" length, slotted round-head Itron Part Number SCR-0015-001 SCR-0037-001 Itron Part Number SCR-0062-003 100G Datalogging Installation Guide - Direct Mount 9 Chapter 1 100G Datalogging Gas Endpoint 10 100G Datalogging Installation Guide - Direct Mount C H A P T E R 2 Elster American Meter Installation This chapter provides instructions to install the 100G Datalogging Gas Endpoint on an Elster American Meter. Installing the 100G Datalogging Gas Endpoint involves four tasks:
1. Removing the index from the meter. 2. Assembling the 100G Datalogging Gas Endpoint and index. 3. Programming the 100G Datalogging Gas Endpoint assembly. 4. Attaching the 100G Datalogging Gas Endpoint assembly to the meter. Note Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. To remove the index from the meter 1. Remove the four index cover screws and the index cover from the Elster American meter. Alternate screw removal following the numbered pattern in the photo. 100G Datalogging Installation Guide - Direct Mount 11 Chapter 2 Elster American Meter Installation 2. Examine the mounting screws. If they are 5/8" long and not corroded, keep them to re-
attach the 100G Datalogging Gas Endpoint assembly. If the screws are not the correct length or if the screws are corroded, discard. Note You may use the removed index cover as a temporary storage container for screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. 3. Unscrew one index mounting screw completely. Hold one hand under the index to catch the screw. While removing the other mounting screw, pull the index away from the meter to keep the index backplate against the back of the screw. Remove the screw completely after the index is free of the meter. Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index will be mounted to the endpoint later in this procedure. Verify the index mounting screws are 3/16" long and not corroded. If the screws are the correct length and not corroded, retain for later use. If the original screws were discarded, use the correct replacement screws (see Installation Prerequisites on page 8.) 4. Remove the old gasket, gasket residue and dirt from the meter (if applicable). The meter face must be free of gasket residue before you install the 100G Datalogging Gas Endpoint. 12 100G Datalogging Installation Guide - Direct Mount Installation Prerequisites To Assemble the 100G Datalogging Gas Endpoint and Index 1. Separate the 100G Datalogging Gas Endpoint housing from the cover by pulling the cover straight out from the housing. 2. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. The cover will be used later in this installation procedure. 100G Datalogging Installation Guide - Direct Mount 13 Chapter 2 Elster American Meter Installation Note Elster American meter indexes are available in different models:
Index wrigglers on one-foot meters with drive slots Index meters on two-foot meters with drive posts An Elster American index with mounting screw holes An Elster American index with mounting slots If your index has mounting screw slots, skip steps 3 and 4. If your index has mounting screw holes, perform steps 3 and 4, and skip steps 5 and 6. 3. Using the original index mounting screw or a replacement screw, if necessary, place one 8 - 32 3/16" screw into the index's right-hand mounting screw hole. 14 100G Datalogging Installation Guide - Direct Mount Installation Prerequisites 4. Attach the screw to the endpoint housing's right-index mounting post just enough to hold the screw and the right end of the index in place. 5. Screw one 8 - 32 x 3/16" screw into the right index mounting post one or two turns. Do not tighten the screw. 6. Place the right index mounting screw slot under the screw head. Do not tighten the screw. 7. Slide the index drive post into the endpoint wriggler. Verify positive engagement. Caution If the index wriggler has a drive slot, place the endpoint wriggler's drive post into the index drive slot. Failure to mate the endpoint wriggler with the index drive post (or slot) can cause binding and lead to poor registration or meter failure. 8. Install and tighten the left index mounting screw (for indexes with either mounting screw slots or holes). Tighten the right index mounting screw. 100G Datalogging Installation Guide - Direct Mount 15 Chapter 2 Elster American Meter Installation 9. Slide the endpoint cover over the index and housing. Verify the cover is installed correctly. The endpoint label should be clearly visible and easily read. Programming the 100G Datalogging Gas Endpoint Assembly The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information. 16 Caution The 100G Datalogging Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Gas Endpoint Assembly The endpoint is programmed based on the meter's drive rate. Take note of the index drive rate shown on a lower left dial on the index. The endpoint is programmed based on the drive rate. Elster American meter index drive rates are either 1-cubic foot or 2-cubic feet. To Program the 100G Datalogging Gas Endpoint 1. Program the meter drive rate into the 100G Datalogging Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly after assembly. Caution Do not turn the drive wriggler faster than one turn per second. 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. 100G Datalogging Installation Guide - Direct Mount 17 Chapter 2 Elster American Meter Installation Attaching the 100G Datalogging Gas Endpoint Assembly to the Elster American Meter After 100G Datalogging Gas Endpoint programming is complete, attach the endpoint assembly to the Elster American Meter. Warning For 5B Meters only: If the 100G Datalogging Gas Endpoint will be installed on a 5B-225 aluminum meter, cut 1/16" off each endpoint wriggler post to prevent the wriggler from rubbing on the face of the nut holding the meter drive dog in place. To Attach the 100G Datalogging Gas Endpoint 1. Align the endpoint wriggler to connect with the drive post (or slot) of the meter. For one-foot meters: Align the endpoint assembly wriggler perpendicular to the meter drive post. For two-foot meters: Align the endpoint assembly wriggler perpendicular to the meter drive slot. The pin on the endpoint wriggler may be installed inside or outside the meter drive slot. For easy assembly, Itron recommends installing the pin on the 100G Datalogging Gas Endpoint wriggler outside the meter drive slot. 18 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Elster American Meter 2. Carefully align the endpoint's four screw holes with the holes on the meter. Attach using the original mounting screws if they are the correct size and are not corroded
(1/4 - 20 x 5/8" screws.) If the original screws were discarded, use the correct replacement screws (see Installation Prerequisites on page 8). Tighten in an alternating, diagonal pattern as shown in the photo:
Insert first screw and tighten 1/4 to 1/2 turn after the screw contacts the meter connection. Insert the second screw and tighten 1/4 to 1/2 turn after contact with the meter connection. Insert the third screw and tighten 1/4 to 1/2 turn after contact with the meter connection. Insert the last screw and tighten 1/4 to 1/2 turn after contact with the meter connection. Return to the first screw and tighten. Continue with the second, third and last screw until all screws are tight. Use equal screw tension to tighten each screw. Note Meter manufacturers should torque the mounting screws 15 to 20 inch-
pounds. 3. Place new tamper seals over the two screws with tamper seal mounts. Press tamper seals into place using the 11/32" nut driver or similar blunt tool. 100G Datalogging Installation Guide - Direct Mount 19 Chapter 2 Elster American Meter Installation 4. Complete necessary paperwork and verify all excess materials are removed from the customer's premises. 100G Datalogging Gas Endpoint installation on the Elster American meter is complete. 20 100G Datalogging Installation Guide - Direct Mount
1 2 | Users Manual Part 2 | Users Manual | 1.33 MiB |
C H A P T E R 3 Sensus/Rockwell Meter Installation This chapter provides instructions to install the 100G Datalogging Gas Endpoint on a Sensus/Rockwell Meter. These instructions apply to 11-tooth, 16-tooth, and 18-tooth Sensus 100G Datalogging Gas Endpoints. Note Sensus meters are also known as Invensys, Equimeter, and Rockwell. For these instructions, all meter types are referred to as Sensus meters. 100G Datalogging Gas Endpoint Sensus 11-tooth Sensus 16-tooth Sensus 18-tooth 100G Datalogging Installation Guide - Direct Mount 21 Chapter 3 Sensus/Rockwell Meter Installation To Remove the Index from the Meter 1. Remove the four index cover screws and the index cover from the Sensus meter. Alternate screw removal following the numbered pattern as shown in the photo. 2. Examine the mounting screws. If they are 5/8" long and not corroded, keep them to attach the 100G Datalogging Gas Endpoint assembly. If the screws are not the correct length or if the screws are corroded, discard. Note You may use the removed index cover as a temporary storage container for screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. 3. Unscrew one index mounting screw completely. Hold one hand under the index to catch the screw. While removing the other mounting screw, pull the index away from the meter to keep the index backplate against the back of the screw. Remove the screw completely after the index is free of the meter. Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index will be mounted in the endpoint later in this procedure. Verify the index mounting screws are 5/8" long and not corroded. If the screws are the correct length and not corroded, retain for later use. If the original screws are discarded, use the correct replacement screws (see Installation Prerequisites on page 8.) 22 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Elster American Meter 4. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free of gasket residue or dirt before you install the 100G Datalogging Gas Endpoint. To Assemble the 100G Datalogging Gas Endpoint and Index 1. Separate the 100G Datalogging Gas Endpoint housing from the cover by pulling the cover straight out from the housing. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. The cover will be used later in this installation procedure. 2. Place the index drive gear (1) in the housing wriggler gear cup (2) of the endpoint. The example shows an 11-tooth drive gear. Your index may be a 16- or 18-tooth gear. Use the appropriate 100G Datalogging Gas Endpoint for your specific meter. See the Meter Compatibility List on page 2 for more information. 100G Datalogging Installation Guide - Direct Mount 23 Chapter 3 Sensus/Rockwell Meter Installation 3. After the drive gear is aligned with the wriggler gear, the mounting holes will line up. 4. Using the original index mounting screw or a replacement screw (if necessary), place one 6 - 32 5/8" screw into the index's right mounting screw hole. Attach the screw to the endpoint housing's right-index mounting post just enough to hold the screw and the right end of the index in place. Install and tighten the left index mounting screw. Tighten the right index mounting screw completely. 24 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Gas Endpoint Assembly 5. Slide the endpoint cover over the index and housing. Verify the cover is installed correctly. The endpoint label should be clearly visible and easily read. Programming the 100G Datalogging Gas Endpoint Assembly The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information. Caution The 100G Datalogging Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. 100G Datalogging Installation Guide - Direct Mount 25 Chapter 3 Sensus/Rockwell Meter Installation Take note of the index drive rate shown on a lower left dial on the index. The endpoint is programmed based on the drive rate. Sensus meter index drive rates are typically 2-cubic feet. To Program the 100G Datalogging Gas Endpoint 1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly after assembly. Caution Do not turn the drive wriggler faster than one turn per second. 26 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Sensus Meter 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. Attaching the 100G Datalogging Gas Endpoint Assembly to the Sensus Meter After 100G Datalogging Gas Endpoint programming is complete, attach the endpoint assembly to the Sensus meter. To Attach the 100G Datalogging Gas Endpoint 1. Gently place the ERT module assembly against the front of the meter at angle. Endpoint-to-meter mounting screws are installed and tightened in an alternating fashion. Align the top right mounting screw-hole on the meter with the top right screw-hole on the endpoint. Insert the top-right cover mounting screw and tighten the screw enough to hold it in place. Do not completely tighten. Rotate the Endpoint assembly counterclockwise until the remaining three endpoint screw holes line up with the holes in the meter. Use the original mounting screws if they were the correct size and not corroded. If the original screws were discarded, use the correct replacement screws (see Installation Prerequisites on page 8.) 100G Datalogging Installation Guide - Direct Mount 27 Chapter 3 Sensus/Rockwell Meter Installation Install the remaining three mounting screws and tighten in the pattern shown. Insert lower left mounting screw and tighten to snug position. Tighten upper right mounting screw to snug position. Insert upper left mounting screw and tighten to snug position. Insert lower right mounting screw and tighten to snug position. Each mounting screw should be tightened evenly. Important Meter manufacturers should torque the mounting screws 15 to 20 inch-pounds. 2. Place a new tamper seal over the two screws with tamper seal cups. Press the new tamper seals into place using the 11/32-inch nut driver (or similar blunt tool). 3. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the customer premises. 28 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Sensus Meter 100G Datalogging Gas Endpoint installation on the Sensus Meter is complete. 100G Datalogging Installation Guide - Direct Mount 29 Chapter 3 Sensus/Rockwell Meter Installation 30 100G Datalogging Installation Guide - Direct Mount C H A P T E R 4 Itron/Actaris Meter Installation This chapter provides instructions to install the 100G Datalogging Gas Endpoint on an Itron/Actaris Meter. Note Itron/Actaris meters are also known as Sprague and Schlumberger meters. For these instructions, all meters will be referred to as Itron/Actaris meters. To remove the index from the meter 1. Remove the index cover screws and the index cover from the Itron/Actaris meter. Examine the mounting screws. If they are 5/8" long and not corroded, keep them to re-
attach the 100G Datalogging Gas Endpoint assembly. If the screws are not the correct length or if the screws are corroded, discard. Note Use the removed index cover as a temporary storage container for screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. 100G Datalogging Installation Guide - Direct Mount 31 Chapter 4 Itron/Actaris Meter Installation 2. Loosen the index mounting screws 1/2 to one turn. Slide the index to the left and off the mounting screws and remove from the meter. Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index will be mounted in the endpoint later in this procedure. Verify the index mounting screws are 1/4" long and not corroded. If the screws are the correct length and not corroded, retain for later use. If the original screws are discarded, use the correct replacement screws (see Installation Prerequisites on page 8.) 3. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free of gasket residue or dirt before you install the 100G Datalogging Gas Endpoint. To assemble the 100G Datalogging Gas Endpoint and index 1. Separate the 100G Datalogging Gas Endpoint housing from the cover by pulling the cover straight out from the housing. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. The cover will be used later in this installation procedure. 32 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Sensus Meter 2. Screw the 10 - 24 x 1/4" screws into the index mounting posts two turns. Do not tighten the screws. 3. Align the index wriggler (1) with the endpoint drive post (2). Carefully slide the index onto the mounting screws. Verify the 100G Datalogging Gas Endpoint's housing drive post makes positive engagement with the index wriggler. Hold the index in place and tighten the index mounting screws. Caution Indexes have varying drive mechanism styles. The diagrams show a bar-
type (left) and "Scottish Yoke" type (right). Failure to align the endpoint wriggler with the index drive post can cause binding and lead to poor registration or meter failure. To verify proper engagement of the index to the endpoint housing, spin the wriggler one clockwise rotation, then one-counterclockwise rotation. Do not spin more than one complete rotation. The wriggler should spin freely, with little or no resistance. 100G Datalogging Installation Guide - Direct Mount 33 Chapter 4 Itron/Actaris Meter Installation 4. Slide the endpoint cover over the index and housing. Verify the cover is installed correctly. The endpoint label should be clearly visible and easily read. Programming the 100G Datalogging Gas Endpoint Assembly The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information. Caution The 100G Datalogging Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. 34 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Gas Endpoint Assembly Take note of the index drive rate shown on the drive dial on the index. The endpoint is programmed based on the drive rate. Itron/Actaris meter index drive rates are typically 2-
cubic feet. To program the 100G Datalogging Gas Endpoint 1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly after assembly. Caution Do not turn the drive wriggler faster than one turn per second. 100G Datalogging Installation Guide - Direct Mount 35 Chapter 4 Itron/Actaris Meter Installation 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter After the 100G Datalogging Gas Endpoint has been programmed, attach it to the Itron/Actaris meter. To attach the 100G Datalogging Gas Endpoint 1. Align the white wriggler (1) so one of its four drive slots lines up with the meter's drive dog (2). 2. Carefully place the 100G Datalogging Gas Endpoint on the meter. Warning Failure to correctly align the meter drive post and endpoint drive slot can cause binding and lead to poor registration or meter failure. If there is a gap between the endpoint gasket and the meter, it may be the drive slot of the endpoint assembly's wriggler is not correctly aligned with the meter drive slot. Remove the 100G Datalogging Gas Endpoint assembly and repeat the alignment procedure. You must establish proper engagement of the meter drive dog within the endpoint wriggler slot. 36 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter 3. Endpoint to meter mounting screws must be installed in an alternating fashion. Use the original mounting screws if they were the correct size and not corroded. If the original screws were discarded, use the correct replacement screws (see Installation Prerequisites on page 8.) Insert the right index cover mounting screw and tighten the screw enough to hold it in place. Do not completely tighten. Install the left index cover mounting screw and tighten to a snug fit. Finish by tightening the right mounting screw to a snug fit. Each mounting screw must be tightened evenly. Important Meter manufacturers should torque the mounting screws 15 to 20 inch-pounds. 1. Place a new tamper seal over the two screws in the tamper seal cups. Press the new tamper seals into place using the 11/32-inch nut driver (or similar blunt tool). 2. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the customer premises. 100G Datalogging Installation Guide - Direct Mount 37 Chapter 4 Itron/Actaris Meter Installation 100G Datalogging Gas Endpoint installation on the Itron/Actaris Meter is complete. 38 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter Attaching the 100G Datalogging Gas Endpoint Assembly to Flat-faced Itron/Actaris Meters 100G Datalogging Gas Endpoint installation on a flat-faced Itron/Actaris meter requires the Itron Adapter Shim Kit (CFG-0015-001). Itron Adapter Shim Kit (CFG-0015-001) 1 2 3 4 Adapter Shim Plate Clear Cover Mounting Screws Drive Dog Adapter Plate Mounting Screws To Attach the 100G Datalogging Gas Endpoint Assembly 1. Verify the kit includes the materials listed in the Itron Adapter Shim Kit Table. 100G Datalogging Installation Guide - Direct Mount 39 Chapter 4 Itron/Actaris Meter Installation Warning The Adapter Shim Plate must fit flush against the meter face. Some older Schlumberger/Sprague meters are not compatible with the adapter plate. The following examples illustrate the potential obstruction (problem) areas between the adapter plate and meter. Failure to mount adapter plate flush on the front of a meter could result in a binding condition and lead to poor registration or meter failure. 2. Remove the drive dog from the flat-faced Itron/Actaris meter. Replace it with the extended drive dog included in the kit. Hand-tighten to snug. Warning The meter drive dog shaft is surrounded by a gasket. A gas leak could result if the gasket is damaged. Do not use a tool to install or tighten the new drive dog. Hand-tighten only. 40 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter 3. Attach the Adapter Shim Plate to the meter with the gasket against the meter face. Secure with the two adapter plate mounting screws in an alternating fashion. Insert the right adapter plate screw and tighten the screw enough to hold it in place. Install the left mounting screw and tighten to a snug fit. Finish by tightening the right mounting screw to a snug fit. Each adapter plate screw must be tightened evenly. Note 100G Datalogging Gas Endpoints must be assembled and programmed following the instructions in To Assembe the 100G Datalogging Gas Endpoint and Index on page 32 and Programming the 100G Datalogging Gas Endpoint Assembly on page 34 prior to installation on the meter. 4. Align the white wriggler (1) so one of its four drive slots lines up with the meter's drive dog (2). 5. Carefully place the 100G Datalogging Gas Endpoint assembly on the meter. Warning Failure to correctly align the meter drive post and endpoint drive slot can cause binding and lead to poor registration or meter failure. If there is a gap between the endpoint gasket and the meter, remove the 100G Datalogging Gas Endpoint assembly and repeat the alignment procedure. You must engage the meter drive dog in the endpoint wriggler slot. 6. Secure the endpoint to the meter by installing mounting screws in an alternating fashion. Use the original index cover mounting screws if they were the correct size and not corroded. If the original screws were discarded, use the correct replacement screws (see Installation Prerequisites on page 8.) Insert the right index cover mounting screw and tighten the screw enough to hold it in place. Do not completely tighten. Install the left index cover mounting screw and tighten to a snug fit. Finish by tightening the right mounting screw to a snug fit. Each mounting screw must be tightened evenly. Important Meter manufacturers should torque the mounting screws 15 to 20 inch-pounds. 100G Datalogging Installation Guide - Direct Mount 41 Chapter 4 Itron/Actaris Meter Installation 1. Place a new tamper seal over the two screws with tamper seal cups. Press the new tamper seals into place using the 11/32-inch nut driver or similar blunt tool. 2. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the customer premises. 100G Datalogging Gas Endpoint installation on the Itron/Actaris Meter is complete. 42 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter Securing Brass Meter Tags to Flat-faced Meters Some older Sprague meters have metal index covers with brass meter tags attached (by screws or rivets) to metal index covers. Typically, brass meter tags have mounting (screw/rivet) holes on each end of the tag. Note If the brass meter tag will be secured to the meter utilizing the endpoint-to-
meter mounting hole, it must be attached during the endpoint installation procedure described in Step 1 of Attaching the 100G Datalogging Gas Endpoint to the Itron/Actaris Meter on page 36. 100G Datalogging Installation Guide - Direct Mount 43 Chapter 4 Itron/Actaris Meter Installation To Secure Brass Meter Tags to Flat-faced Meters 1. After the metal index cover is removed from the meter, carefully remove the brass meter tag from the meter index cover. Do not damage the meter tag mounting holes. The Itron Adapter Shim Plate was designed with a tag mounting hole in the lower right corner. After the 100G Datalogging Gas Endpoint assembly is attached to the meter, secure the meter tag to the Shim Plate meter tag mounting hole with a utility-
approved wire security seal. Itron acceptable meter tag mounting methods are shown in the photos. 44 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter 2. If the meter tag mounting holes were damaged during removal so a wire security seal cannot be used, remove the 100G Datalogging Gas Endpoint index cover and place the meter tag inside the endpoint assembly to maintain meter security. (See To Assemble the 100G Datalogging Gas Endpoint on page 32.) Warning Placing the brass meter tag inside the 100G Datalogging Gas Endpoint assembly is not the preferred method of securing the tag to the meter. Use this method only if the brass meter tag mounting holes are damaged and cannot be used for mounting. This method does not secure the tag inside the endpoint. The brass meter tag may move out of view if the meter is bumped or jarred. 100G Datalogging Installation Guide - Direct Mount 45 Chapter 4 Itron/Actaris Meter Installation 46 100G Datalogging Installation Guide - Direct Mount C H A P T E R 5 National/Lancaster Meter Installation This chapter provides instructions to install the 100G Datalogging Gas Endpoint on 175 -
250 CFH National/Lancaster meters. To Remove the Index from the Meter 1. Remove any tamper seals from the index cover screws. Remove the index cover screws and the index cover from the meter. Discard the index cover mounting screws and index cover. The 100G Datalogging Gas Endpoint includes new, different-size endpoint mounting screws Note You may use the removed index cover as a temporary storage container for screws. Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. 100G Datalogging Installation Guide - Direct Mount 47 Chapter 5 National/Lancaster Meter Installation 2. Unscrew one index mounting screw completely. Hold one hand under the index to catch the screw. While removing the other mounting screw, pull the index away from the meter to keep the index backplate against the back of the screw. Remove the screw completely after the index is free of the meter. Set the index aside where it will not be damaged or fill with dirt, rain or snow. The index will be mounted in the endpoint later in this procedure. Discard the index mounting screws. The 100G Datalogging Gas Endpoint for National/Lancaster meters includes new, different-sized index mounting screws (see Installation Prerequisites on page 8 for screw information). 3. Remove the old gasket, gasket residue, and dirt from the meter (if applicable). The meter face must be free of gasket residue or dirt before you install the 100G Datalogging Gas Endpoint assembly. 48 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter To Assemble the 100G Datalogging Gas Endpoint and Index 1. Separate the 100G Datalogging Gas Endpoint housing from the cover by pulling the cover straight out from the housing. 2. Set the endpoint cover aside where it will not be damaged or fill with rain, dirt or snow. The cover will be used later in this installation procedure. 100G Datalogging Installation Guide - Direct Mount 49 Chapter 5 National/Lancaster Meter Installation Note National/Lancaster meter indexes are available in different models:
Some National/Lancaster Meter indexes have index legs to mount the index on the meter or endpoint. Some indexes have both legs and index mounting holes and some have just mounting holes. Mounting methods are dependent on the index. Index types require different mounting screws to attach the index to the 100G Datalogging Gas Endpoint housing (see Installation Prerequisites on page 8). Indexes with legs must be mounted to the endpoint housing mounting posts. Indexes with mounting holes must be attached to the endpoint housing's bracket mounting posts. 1 Bracket mounting posts (indexes with legs) 2 Housing mounting posts (indexes without legs) 50 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the Itron/Actaris Meter If your index has legs with mounting screw slots, skip steps 3 and 4. If your index has mounting screw holes in the index back plate (no legs), perform steps 3 and 4, and skip steps 5 and 6. 3. For indexes with mounting screw holes in the index back plate (no legs), use replacement index mounting screws (SCR-0037-001 - see Installation Prerequisites on page 8). Place one screw into the index's right-hand mounting screw hole. Note National/Lancaster index mounting screws are thread-forming screws and may require more torque. 4. Attach the screw to the endpoint housing's right-index mounting post just enough to hold the screw and the right end of the index in place. 5. For indexes with legs (mounting slots), screw one 6 - 19 x 3/16" screw (SCR-0015-
001 - see Installation Prerequisites on page 8 for screw information) into the right index mounting post one or two turns. Do not completely tighten the screw. 6. Place the right index mounting screw slot under the screw head. Do not completely tighten the screw. 7. Carefully slide the index drive post into the endpoint wriggler. Verify positive engagement of the index wriggler to the endpoint drive dog. (The following photos show three types of index/wrigglers with positive engagement.) Caution Verify the index drive slot engages with the 100G Datalogging Gas Endpoint wriggler. Failure to mate the endpoint wriggler with the index drive post
(or slot) can cause binding and lead to poor registration or meter failure. 100G Datalogging Installation Guide - Direct Mount 51 Chapter 5 National/Lancaster Meter Installation 8. Install and tighten the left index mounting screw (for indexes with either mounting screw slots or holes). Tighten the right index mounting screw. Each index mounting screw must be tightened evenly. 9. Slide the endpoint cover over the index and housing. Verify the cover is installed correctly. The endpoint label should be clearly visible and easily read. 52 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Gas Endpoint Assembly Programming the 100G Datalogging Gas Endpoint Assembly The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information. Caution The 100G Datalogging Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. Take note of the index drive rate shown on a top right dial on the index. The endpoint is programmed based on the drive rate. National/Lancaster meter index drive rates are typically 2-cubic feet. 100G Datalogging Installation Guide - Direct Mount 53 Chapter 5 National/Lancaster Meter Installation To Program the 100G Datalogging Gas Endpoint 1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly after assembly. Caution Do not turn the drive wriggler faster than one turn per second. 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. 54 If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Gas Endpoint Assembly to the National/Lancaster Meter Attaching the 100G Datalogging Gas Endpoint Assembly to the National/Lancaster Meter After the 100G Datalogging Gas Endpoint has been programmed, attach it to the National/Lancaster meter. To Attach the 100G Datalogging Gas Endpoint 1. Align the white wriggler (1) so one of its four drive slots lines up with the meter's drive dog (2). 2. Carefully place the 100G Datalogging Gas Endpoint on the meter. Warning Failure to correctly align the meter drive post and endpoint drive slot can cause binding and lead to poor registration or meter failure. If there is a gap between the endpoint gasket and the meter, it may be the drive slot of the endpoint assembly's wriggler is not correctly aligned with the meter drive slot. Remove the 100G Datalogging Gas Endpoint assembly and repeat the alignment procedure. You must engage endpoint wriggler in the meter drive dog. 3. Install endpoint to meter mounting screws in an alternating fashion. 100G Datalogging Gas Endpoints for National/Lancaster meters come with new, different-
size endpoint mounting screws (SCR-0014-004 - see Installation Prerequisites on page 8 for screw information.) Insert the right index cover mounting screw and tighten the screw enough to hold it in place. Do not completely tighten. Install the left index cover mounting screw and tighten to a snug fit. Finish by tightening the right mounting screw to a snug fit. Each endpoint mounting screw must be tightened evenly. Important Meter manufacturers should torque the mounting screws 15 to 20 inch-pounds. 100G Datalogging Installation Guide - Direct Mount 55 Chapter 5 National/Lancaster Meter Installation 4. Place new tamper seals over the screws. Press the new tamper seals into place using the 11/32-inch nut driver or similar blunt tool. 5. Complete any necessary paperwork and properly dispose excess installation materials and scrap from the customer premises. 100G Datalogging Gas Endpoint installation on the National/Lancaster Meter is complete. 56 100G Datalogging Installation Guide - Direct Mount
1 2 | Users Manual Part 3 | Users Manual | 1.11 MiB |
C H A P T E R 6 Elster American and Itron Actaris Commercial Meter Installation This chapter provides instructions to install the 100G Datalogging Gas Endpoint on Elster American and Itron/Actaris Commercial Meters. Warning Handle the commercial 100G Datalogging Gas Endpoint carefully so the metal passive radiator antenna is not damaged. 100G Datalogging Installation Guide - Direct Mount 57 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation Removing the Index/ Index Assembly from the Meter Commercial 100G Datalogging Gas Endpoints can be mounted on Elster American Meters in various configurations. These instructions show metal mounting plates without tamper seal cups and plastic mounting plates with tamper seal cups to represent mounting plate options. Mounting plate with tamper seal cups Mounting plate without tamper seal cups Indexes may be mounted on the 100G Datalogging Commercial Elster American Gas Endpoint without mounting plates. Index covers may (or may not) have tamper seal cups (on the back of the cover) for added security. Index removal assumes the installer will remove any tamper seals or wires before continuing with these instructions. 58 Note It may not be necessary to dismantle your commercial index assembly (index and cover). These instructions do not include index/cover assembly for those applications. Some diaphragm commercial meters do not require an index assembly mounting plate. Indexes can be mounted directly to the endpoint. 100G Datalogging Installation Guide - Direct Mount Removing the Index/ Index Assembly from the Meter To Remove the Index Assembly 1. Remove any tamper seals (1) (or wire seals) from the index cover and mounting plate screws (2). Set the index/cover assembly aside. You will re-install it later in these instructions. 2. Remove the index cover screws from the meter. Verify screws are 1/2" long and are not corroded. If the screws are the correct length and are not corroded, keep them to re-install the 100G Datalogging Gas Endpoint assembly later in this procedure. If the screws are damaged or not the correct length, discard. Note Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. 100G Datalogging Installation Guide - Direct Mount 59 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation 3. Remove the gasket from the index cover mounting plate (if applicable). Set it aside where it will not be damaged. Remove the tamper seals from the mounting plate. Remove the mounting plate screws and separate the mounting plate from the meter. Place the mounting plate where it will not be damaged. You will use it later in this installation. Programming the 100G Datalogging Commercial Gas Endpoint The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information. Caution The 100G Datalogging Commercial Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. 60 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Commercial Gas Endpoint Take note of the index drive rate shown on the index. The endpoint is programmed based on the drive rate. Elster American commercial meter index drive rates may be 5-, 10- or 100 cubic feet. To Program the 100G Datalogging Commercial Gas Endpoint 1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly. Caution Do not turn the drive wriggler faster than one turn per second. 100G Datalogging Installation Guide - Direct Mount 61 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. To Attach the 100G Datalogging Commercial Gas Endpoint to the Elster American Commercial Meter Warning Handle the 100G Datalogging Commercial Gas Endpoint carefully so the metal passive radiator antenna is not damaged. 1. Tilt the 100G Datalogging Commercial Gas Endpoint at an angle and turn the wriggler until the drive notches line up with the meter wriggler's drive teeth. 62 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Commercial Gas Endpoint 2. Align the endpoint so the screw holes line up with the meter's top screw holes. Carefully lower the endpoint on the meter with the wriggler notches lining up with the meter's wriggler teeth. Warning The INLET label on the 100G Datalogging Commercial Gas Endpoint must line up with the INLET label on the meter case. 3. Verify the bottom of the endpoint and the top of the meter meet. The endpoint housing should rest on top of the meter without gaps. Warning Do not press down on the 100G Datalogging Commercial Gas Endpoint if a gap exists between the endpoint and the meter. A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, slowly turn the endpoint's upper wriggler back and forth until the endpoint aligns with the meter's drive teeth. 100G Datalogging Installation Guide - Direct Mount 63 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation 4. Place the index cover mounting plate on the commercial 100G Datalogging Gas Endpoint so the printing "FLOW FRONT AL800 AL1000 AL1400 AL2300 AL5000 TURBINE ROTARY" stamped on the plate is toward the front of the meter. (A gap between the mounting plate and meter at the screw locations is normal.) 5. Install four mounting screws (SCR-0062-001 - see Installation Prerequisites on page 8 for screw information) and tighten them in an alternating diagonal sequence. For metal mounting plates with a flat screw surface, use endpoint mounting screws with internal tooth washers. For plastic mounting plates with tamper screw cups, use endpoint mounting screws (AS-568A-011, 5/16" ID x 7/16" OD o-rings may be used for a maximum moisture seal). Turn each screw 1/4 to 1/2 turn after it contacts the mounting plate. If you have access to a torque driver, tighten mounting screws to 72 inch-pounds. 6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press into place with an 11/32" nut driver or similar blunt tool. 64 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Commercial Gas Endpoint To Attach the Index/Cover Assembly on the Elster American Commercial Meter 1. Place the mounting plate gasket (previously removed) on the index cover mounting plate. Align the gasket and index cover mounting plate screw holes. 2. Place the index/cover assembly on the index mounting plate. (The index must face the direction it faced before removal.) Attach the index/cover assembly on the mounting plate using original index screws. Insert one screw and tighten two turns to hold it in place on the mounting plate. Insert the second mounting screw and tighten until secure. Completely tighten the first mounting screw. Each index cover mounting screw must be tightened evenly. 3. Turn the commercial 100G Datalogging Gas Endpoint wriggler so it intersects with the index wriggler. Carefully lower the index-cover mounting plate assembly onto the 100G Datalogging Gas Endpoint. 4. Install four endpoint mounting screws (SCR-0062-001, see Installation Prerequisites on page 8). Tighten screws in an alternating diagonal pattern. Insert the first screw and tighten enough to hold index assembly in place. Insert the second screw diagonal to first screw and tighten two to three turns. Tighten the first, 2nd, and third screw until secure. Turn each screw 1/4 to 1/2 Insert the third screw, tightening two or three turns. Insert the fourth screw and tighten until secure. turn after it contacts the cover. Each endpoint mounting screw must be tightened evenly. If you have access to a torque-driver, tighten mounting screws to 72-inch pounds. 100G Datalogging Installation Guide - Direct Mount 65 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation 5. Install new tamper or wire seals. If tamper seals are installed, press into place with an 11/32 nut driver or similar blunt tool. Crimp the seal if utility-approved wire seals are installed. This completes installation of the 100G Datalogging Commercial Gas Endpoint on an Elster American Commercial meter. 66 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter This section provides instructions for installing the 100G Datalogging Commercial Gas Endpoint on Itron/Actaris 675A, 800A, and 1000A commercial meters. Installation requires an Itron/Actaris adapter kit from Itron/Actaris. Itron/Actaris Adapter Kit (Part Number 80005901-01) Adapter plate Endpoint mounting screws (4) Screw bushings (4) Tamper seals Extension driver Before You Begin Follow To Remove the Index/Index Assembly from the Meter on page 57 to prepare the Itron-Actaris meter for installation. Program the Commercial 100G Datalogging Gas Endpoint (see Programming the 100G Datalogging Gas Endpoint Assembly on page 60) prior to installation. 100G Datalogging Installation Guide - Direct Mount 67 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter 1. Turn the 100G Datalogging Commercial Gas Endpoint over and place the four mounting screw bushings into the screw holes on the endpoint. 2. Turn the 100G Datalogging Commercial Gas Endpoint on its side and align the wriggler with the Itron-Actaris Commercial meter's drive dog. 68 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter 3. Inlet lettering on the 100G Datalogging Commercial Gas Endpoint must line up with Inlet lettering on the meter. Slowly lower the endpoint on the Itron-Actaris Commercial meter aligning the drive dog and wriggler. The endpoint housing should rest on the top of the meter without gaps. Warning Do not press down on the 100G Datalogging Gas Endpoint if a gap exists between the endpoint and the meter. A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, remove the 100G Datalogging Gas Endpoint and repeat steps 2 and 3. To Attach the Index on the Itron-Actaris Commercial Meter 1. Place the Itron-Actaris adapter plate on the 100G Datalogging Commercial Gas Endpoint with the two small screw holes in the adapter plate to the back of the meter. Meter Front 100G Datalogging Installation Guide - Direct Mount 69 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation 2. Place the extension driver on the 100G Datalogging Commercial Gas Endpoint wriggler. 3. Align the index wriggler with the commercial 100G Datalogging Commercial Gas Endpoint wriggler driver extension. 4. Install the two index mounting screws. Tighten the first screw two or three turns. Install second screw and tighten to secure. Tighten the first screw to a snug fit. Each index mounting screw must be tightened evenly. 70 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter 5. Place the index cover over the index with the clear side covering the index dials for easy reading. Align the holes in the index cover with the endpoint adapter plate mounting holes. Secure with the four mounting screws from the adapter kit. Tighten the mounting screws in a diagonal alternating pattern. Insert the first screw and tighten enough to hold the index in place. Insert the second screw and tighten two to three turns. Insert the third mounting screw and tighten two to three turns. Insert the fourth mounting screw and tighten. Tighten the first, third and second screw. Turn each screw 1/4 to 1/2 turn after the screw contacts the index cover. Each index mounting screw must be tightened evenly. If you have access to a torque-driver, tighten mounting screws to 72-inch pounds. 6. Insert tamper seals in the tamper seal cups on the index cover and press into place with an 11/32 nut driver or similar blunt tool. 100G Datalogging Installation Guide - Direct Mount 71 Chapter 6 Elster American and Itron Actaris Commercial Meter Installation This completes installation of the commercial 100G Datalogging Gas Endpoint on the Itron-
Actaris Commercial meter. 72 100G Datalogging Installation Guide - Direct Mount C H A P T E R 7 Sensus/Rockwell Commercial Meter Installation This chapter provides instructions to install the 100G Datalogging Commercial Gas Endpoint on a Commercial Sensus/Rockwell diaphragm meter. Removing the Index/ Index Assembly from the Meter 100G Datalogging Commercial Gas Endpoints can be mounted on Sensus/Rockwell Commercial Meters in various configurations. These instructions show the index assembly mounted without a mounting plate. Note Sensus/Rockwell diaphragm commercial meters do not require an index assembly mounting plate. Indexes can be mounted directly to the endpoint. To Remove the Index/Index Assembly from the Meter 1. Remove any tamper seals (or wire seals) from the index cover and remove the index cover mounting screws. You will re-install it later in these instructions. 100G Datalogging Installation Guide - Direct Mount 73 Chapter 7 Sensus/Rockwell Commercial Meter Installation 2. Remove the index screws from the meter. Set the index cover aside where it will not be damaged or fill with dirt, rain or snow. You will re-install the index later in this procedure. Note Properly dispose all unused screws, old index covers, gaskets, tamper seals, and other leftover materials. Do not leave materials on customer premises. Programming the 100G Datalogging Gas Endpoint The 100G Datalogging Commercial Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide (TDC-0744) for more complete programming information. Caution The 100G Datalogging Commercial Sensus/Rockwell Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. 74 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Gas Endpoint Take note of the index drive rate shown on the index. The endpoint is programmed based on the drive rate. Sensus/Rockwell commercial meter index drive rates may be 5-, 10- or 100-
cubic feet. The seven-dial index shown is a 100-cubic feet drive rate. To Program the 100G Datalogging Commercial Gas Endpoint 1. Program the index drive rate into the commercial endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly. Caution Do not turn the drive wriggler faster than one turn per second. 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. 100G Datalogging Installation Guide - Direct Mount 75 Chapter 7 Sensus/Rockwell Commercial Meter Installation Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter Warning Handle the 100G Datalogging Commercial Gas Endpoint carefully so the metal passive radiator antenna is not damaged. To Attach the 100G Datalogging Commercial Endpoint 1. Tilt the 100G Datalogging Commercial Gas Endpoint at an angle and turn the wriggler until the drive notches line up with the meter wriggler's drive teeth. 2. Align the 100G Datalogging Commercial Gas Endpoint so the screw holes line up with the meter's top screw holes. Carefully lower the endpoint on the meter so the wriggler's bars line up with the meter drive dog. Itron recommends installation with one bar inserted into the meter drive dog's u-shaped gear. Warning The INLET label on the 100G Datalogging Commercial Gas Endpoint must line up with the INLET label on the Sensus/Rockwell meter case. 76 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter 3. Verify the bottom of the 100G Datalogging Commercial Gas Endpoint and the top of the meter meet. The endpoint housing should rest on top of the meter without gaps. Warning Do not press down on the 100G Datalogging Commercial Gas Endpoint if a gap exists between the endpoint and the meter. A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, slowly turn the 100G Datalogging Commercial Gas Endpoint's upper wriggler back and forth until the endpoint aligns with the meter's drive teeth. 4. Align the 100G Datalogging Commercial Gas Endpoint with the index mounting holes. Verify the index drive dog intersects with the endpoint's wriggler. Install the endpoint mounting screws (SCR-0062-003 see Installation Prerequisites on page 8 for screw information). Turn each screw 1/4 to 1/2 turn after it contacts the index/endpoint assembly. 100G Datalogging Installation Guide - Direct Mount 77 Chapter 7 Sensus/Rockwell Commercial Meter Installation 5. Install the index cover. For index covers with flat-surface screw holes, use screws
(SCR-0062-002), flat washers (WSH-0020-005), and cork washers (WSH-0032-001). For index covers with tamper seal cups, use screws, (AS-568A-011, 5/16" ID x 7/16 OD) o-rings, and tamper seals. 6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press into place with an 11/32" nut driver or similar blunt tool. If your mounting assembly requires a utility-approved wire seal, pass wires through holes in the screw heads and crimp the approved wire seal. 78 100G Datalogging Installation Guide - Direct Mount Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter This completes installation of the 100G Datalogging Gas Endpoint on the Sensus/Rockwell Commercial Diaphragm meter. 100G Datalogging Installation Guide - Direct Mount 79 Chapter 7 Sensus/Rockwell Commercial Meter Installation 80 100G Datalogging Installation Guide - Direct Mount C H A P T E R 8 Dresser ROOTS Commercial Rotary Meter Installation This chapter provides the instructions to mount 100G Datalogging Gas Endpoints
(residential and commercial) on Dresser ROOTs Commercial Rotary Meters. Some commercial AMR applications require a Dresser ROOTS Rotary Meter with a residential 100G Datalogging Gas Endpoint. Only Elster American version residential 100G Datalogging Gas Endpoints are compatible with Dresser ROOTS series rotary gas meters. This chapter provides the instructions to mount an Elster American residential 100G Datalogging Gas Endpoint on Dresser ROOTS AMR-ready Rotary Commercial Meters. Installation requires an AMR adapter kit supplied by Dresser. Refer to the Meter Compatibility List on page 2 for Dresser AMR adapter kit part numbers. Installation Prerequisites Materials Supplied By Itron 100G Datalogging Gas Endpoint New tamper seals - if applicable Materials Supplied by You AMR-ready Dresser ROOTS Rotary Meter Adapter Kit from Dresser Note Follow the Dresser Field Installation Instructions to modify the AMR-ready Dresser ROOTS Meter for 100G Datalogging Gas Endpoint installation. Contact Dresser distributor or Dresser representative for installation instructions specific to the required AMR adapter kit. 100G Datalogging Installation Guide - Direct Mount 81 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation Installation Examples The following pictures show typical installations. Dresser B3 CTR/TC Dresser LMMA CTR Dresser LMMA TC Dresser 8C15 82 100G Datalogging Installation Guide - Direct Mount Programming the 100G Datalogging Gas Endpoint Assembly Programming the 100G Datalogging Gas Endpoint Assembly The 100G Datalogging Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information. Caution The 100G Datalogging Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. The endpoint is programmed based on the meter's drive rate. See B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information on page 85. To Program the 100G Datalogging Gas Endpoint 1. Program the meter drive rate into the 100G Datalogging Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros (0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 100G Datalogging Installation Guide - Direct Mount 83 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly after assembly. Caution Do not turn the drive wriggler faster than one turn per second. 3. Read the 100G Datalogging Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Gas Endpoint. 84 100G Datalogging Installation Guide - Direct Mount B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information Use the information in the following tables to program Dresser Roots Series B3, LMMA, and S3A Non-compensated Counter (CTR) and Temperature Compensated Counter (TC) registers. Reference the Meter Compatibility List on page 2 to confirm compatibility. Settings for Series B3 Registers Model CTR TC Meter size 8C-15C and 2M-11M 16M-56M 8C-15C and 2M-11M 16M Settings Number of dials: 5 Drive rate: 10 PCOMP factor: NONE Number of dials: 6 Drive rate: 100 PCOMP factor: NONE Number of dials: 5 Drive rate: 100 PCOMP factor: NONE Number of dials: 6 Drive rate: 1000 PCOMP factor: NONE 100G Datalogging Installation Guide - Direct Mount 85 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation Settings for LMMA Registers Model CTR TC Meter size 1.5M-11M 16M 1.5M-11M 16M Settings for Series S3A Registers Meter Size 1.5M - 11M 16M 1.5M - 11M 16M Model CTR TC Settings Number of dials: 5 Drive rate: 10 PCOMP factor: NONE Number of dials: 6 Drive rate: 100 PCOMP factor: NONE Number of dials: 5 Drive rate: 50 PCOMP factor: NONE Number of dials: 6 Drive rate: 500 PCOMP factor: NONE Settings Number of dials: 5 Drive rate: 10 PCOMP factor: NONE Number of dials: 6 Drive rate: 100 PCOMP factor: NONE Number of dials: 5 Drive rate: 100 PCOMP factor: NONE Number of dials: 6 Drive rate: 1000 PCOMP factor: NONE 86 100G Datalogging Installation Guide - Direct Mount B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information B3, LMMA and S3A CTR/TC Meter Drive Rates:
Residential Direct Drive Programming*
B3 CTR Meter Size B3 CTR Meter Drive Rate 8C 11C 15C 2M 3M 5M 7M 11M 16M 23M 38M 56M 10 10 10 10 10 10 10 10 100 100 100 100 Drive rates in this table are for direct-mount residential style endpoints only
(NOT commercial or remote endpoints). B3 TC Meter Drive Rate 100 100 100 100 100 100 100 100 1000 LMMA CTR Meter Drive Rate 10 10 10 10 10 100 B3 TC Meter Size 8C 11C 15C 2M 3M 5M 7M 11M 16M LMMA CTR Meter Size 1.5M 3M 5M 7M 11M 16M 100G Datalogging Installation Guide - Direct Mount 87 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation 50 50 50 50 50 500 LMMA TC Meter Size LMMA TC Meter Drive Rate 1.5M 3M 5M 7M 11M 16M S3A CTR Meter Size S3A CTR Meter Drive Rate 1.5M 3M 5M 7M 11M 16M S3A TC Meter Size 1.5M 3M 5M 7M 11M 16M 10 10 10 10 10 100 S3A TC Meter Drive Rate 100 100 100 100 100 1000 Note S3A rotary meters are LMMA meters retrofitted with Series 3 End Bell Adapter. 88 100G Datalogging Installation Guide - Direct Mount Installing the Residential 100G Datalogging Gas Endpoint Assembly to the Dresser ROOTS Rotary Meter Installing the Residential 100G Datalogging Gas Endpoint Assembly to the Dresser ROOTS Rotary Meter After 100G Datalogging Gas Endpoint programming is complete, attach the 100G Datalogging residential endpoint assembly to the Dresser ROOTS Rotary Meter. This mounting procedure applies to B3 CTR/TC, LMMA CTR/TC, and 8C15 series Dresser ROOTS Meters. To Attach the 100G Datalogging Gas Endpoint 1. The 100G Datalogging Gas Endpoint must be mounted on the adapter plate in an upright position. Align the 100G Datalogging Gas Endpoint wriggler with the opening between the tabs of the adapter's drive dog. Insert one endpoint mounting screw and tighten enough to hold the endpoint. Do not completely tighten. Insert the second mounting screw and tighten two turns. Insert the third mounting screw and tighten two turns. Insert the last mounting screw and tighten until snug. Tighten the remaining mounting screws in an alternating, diagonal pattern until snug. All mounting screws must be tightened evenly. Warning A gap may be caused by misalignment of the endpoint wriggler and meter wriggler's drive teeth. Pushing down on the endpoint could damage the endpoint wriggler or meter drive teeth. To eliminate a gap, remove the endpoint assembly and re-align the endpoint wriggler with the meter drive dog. 2. Complete necessary paperwork and verify all excess materials are removed from the customer's premises. 100G Datalogging Residential Gas Endpoint installation on the Dresser ROOTS Rotary Meter is complete. 100G Datalogging Installation Guide - Direct Mount 89 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter The information in this section guides you through the installation of the 100G Datalogging Commercial Gas Endpoint on Dresser ROOTS rotary meters. Note A Dresser ROOTS rotary gas meter with an instrument drive is required for this installation procedure. These instructions show an Elster American 100G Datalogging Commercial Gas Endpoint. The installation procedure is the same for the Sensus/Rockwell 100G Datalogging Commercial Gas Endpoint. 100G Datalogging Elster American 100G Datalogging Sensus/Rockwell Commercial Gas Endpoint Commercial Gas Endpoint Installation Requisites Installation requires the following items:
Drive cover kit 100G Datalogging Commercial Gas Endpoint A flat, slot-drive screwdriver 90 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter Programming the 100G Datalogging Commercial Gas Endpoint Assembly The 100G Datalogging Commercial Gas Endpoint must be programmed with the FC200SR handheld computer loaded with EndPoint-Link or Point-Link Pro software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide (TDC-0744) for more complete programming information. Caution The 100G Datalogging Commercial Gas Endpoint must be programmed before use. Follow the steps in this section to properly program the endpoint. The endpoint is programmed based on the meter's drive rate. See B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information on page 93. To Program the 100G Datalogging Commercial Gas Endpoint 1. Program the meter drive rate into the 100G Datalogging Commercial Gas Endpoint using the FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR as close to vertical as possible. For best success, keep the FC200SR within 6 feet of the target endpoint. Verify you have the correct programming mode (Fixed Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your application. Programming parameters are based on the mode defined by your system administrator. During programming, the 100G Datalogging Commercial Gas Endpoint is set to the nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros
(0). After programming is complete, the endpoint assembly will read to the nearest cubic foot. 100G Datalogging Installation Guide - Direct Mount 91 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation 2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the index drive rate. This verifies the endpoint is counting properly after assembly. Caution Do not turn the drive wriggler faster than one turn per second. 3. Read the 100G Datalogging Commercial Gas Endpoint using the FC200SR. If the read result is higher than the number programmed in Step 1, the 100G Datalogging Commercial Gas Endpoint is counting correctly. If the read result is not higher than the number programmed in Step 1, replace the 100G Datalogging Commercial Gas Endpoint. 92 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter B3, LMMA, and S3A CD/TD Dresser ROOTS Series Meter Drive Rates Use the information in the following tables to program 100G Datalogging Commercial Endpoints installed on Dresser Roots Series B3, LMMA, and S3A Non-compensated Counter with Instrument Drive (CD) and Temperature Compensated Counter with Instrument Drive (TD) registers. Reference the Meter Compatibility List on page 2 to confirm compatibility. Warning Drive rates listed in the following tables are for commercial endpoint programming. Do not use these settings to program residential or remote endpoints. B3 CD Meter Drive Rates 10 10 10 10 10 10 10 10 100 100 100 100 B3 TD Meter Drive Rate 100 100 100 100 100 100 100 100 1000 B3 CD Meter Size 8C 11C 15C 2M 3M 5M 7M 11M 16M 23M 38M 56M B3 TD Meter Size 8C 11C 15C 2M 3M 5M 7M 11M 16M 100G Datalogging Installation Guide - Direct Mount 93 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation LMMA CD Meter Drive Rate 10 10 10 10 10 100 LMMA TD Meter Drive Rate 100 100 100 100 100 1000 S3A CD Meter Drive Rate 100 100 100 1000 100 1000 S3A TD Meter Drive Rate 100 100 100 100 100 1000 LMMA CD Meter Size 1.5M 3M 5M 7M 11M 16M LMMA TD Meter Size 1.5M 3M 5M 7M 11M 16M S3A CD Meter Size 1.5M 3M 5M 7M 11M 16M S3A TD Meter Size 1.5M 3M 5M 7M 11M 16M Note S3A rotary meters are LMMA meters retrofitted with Series 3 End Bell Adapter. 94 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter Note A cover is installed on the 100G Datalogging Commercial Gas Endpoint mounted to a Dresser ROOTS Meter with S3A LMMA Accessory Units (or other Dresser ROOTs adapters with odometer gauges). 1. Locate the INSTRUMENT FACE stamp (2) and position the meter with the drive dog
(1) aligned (as shown). Warning Handle the commercial 100G Datalogging Commercial Gas Endpoint carefully so the metal passive radiator antenna is not damaged. 2. Locate the INLET (1) stamp on the endpoint and position the endpoint as shown. Verify the 100G Datalogging Commercial Gas Endpoint wriggler (3) and drive dog shaft (2) are aligned. 100G Datalogging Installation Guide - Direct Mount 95 Chapter 8 Dresser ROOTS Commercial Rotary Meter Installation 3. Verify the endpoint wriggler and drive dog shaft are engaged by turning the commercial endpoint wriggler. When properly engaged, you will feel resistance. 4. Place the index mounting plate on the endpoint and install the four mounting screws. Do not disturb the shaft alignment. 5. Install the four 100G Datalogging Commercial Gas Endpoint mounting screws
(supplied with the commercial endpoint). Tighten mounting screws in an alternating, diagonal sequence. Turn each screw 1/4 to 1/2 turn after it contacts the cover. If you can utilize a torque wrench, tighten to 72 inch-pounds. Each endpoint mounting screw must be tightened evenly. 6. Insert new utility-approved wire seals and crimp (if required). Note To mount an index and index cover on a rotary meter without an accessory odometer unit, remove the domed cover and reference To Attach the Index on the Itron-Actaris Commercial Meter on page 69. 96 100G Datalogging Installation Guide - Direct Mount Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter Completed Installation Examples 100G Datalogging Elster American Commercial Gas Endpoint mounted on a Dresser ROOTS Meter 100G Datalogging Sensus/Rockwell Commercial Gas Endpoint mounted on a Dresser ROOTS Meter 100G Datalogging Installation Guide - Direct Mount 97
frequency | equipment class | purpose | ||
---|---|---|---|---|
1 | 2009-05-27 | 908 ~ 924 | DSS - Part 15 Spread Spectrum Transmitter | Original Equipment |
2 | 908 ~ 908 | DXT - Part 15 Low Power Transceiver, Rx Verified |
app s | Applicant Information | |||||
---|---|---|---|---|---|---|
1 2 | Effective |
2009-05-27
|
||||
1 2 | Applicant's complete, legal business name |
Itron, Inc.
|
||||
1 2 | FCC Registration Number (FRN) |
0005861034
|
||||
1 2 | Physical Address |
2111 N. Molter Road
|
||||
1 2 |
Liberty Lake, Washington 99019
|
|||||
1 2 |
United States
|
|||||
app s | TCB Information | |||||
1 2 | TCB Application Email Address |
T******@ckccertification.com
|
||||
1 2 |
T******@ckccertification.com
|
|||||
1 2 | TCB Scope |
A4: UNII devices & low power transmitters using spread spectrum techniques
|
||||
1 2 |
A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
|
|||||
app s | FCC ID | |||||
1 2 | Grantee Code |
EO9
|
||||
1 2 | Equipment Product Code |
100GDLD
|
||||
app s | Person at the applicant's address to receive grant or for contact | |||||
1 2 | Name |
J******** R**** H******
|
||||
1 2 | Title |
R&D Spectrum Regulatory
|
||||
1 2 | Telephone Number |
509-8********
|
||||
1 2 | Fax Number |
509-8********
|
||||
1 2 |
j******@itron.com
|
|||||
app s | Technical Contact | |||||
1 2 | Firm Name |
Itron, Inc.
|
||||
1 2 | Name |
J****** H****
|
||||
1 2 | Physical Address |
2111 N. Molter Road
|
||||
1 2 |
Liberty lake, Washington 99019
|
|||||
1 2 |
United States
|
|||||
1 2 | Telephone Number |
509-8********
|
||||
1 2 | Fax Number |
509-8********
|
||||
1 2 |
j******@itron.com
|
|||||
app s | Non Technical Contact | |||||
n/a | ||||||
app s | Confidentiality (long or short term) | |||||
1 2 | Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | Yes | ||||
1 2 | Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | No | ||||
if no date is supplied, the release date will be set to 45 calendar days past the date of grant. | ||||||
app s | Cognitive Radio & Software Defined Radio, Class, etc | |||||
1 2 | Is this application for software defined/cognitive radio authorization? | No | ||||
1 2 | Equipment Class | DSS - Part 15 Spread Spectrum Transmitter | ||||
1 2 | DXT - Part 15 Low Power Transceiver, Rx Verified | |||||
1 2 | Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant) | AMR transceiver device for utility meters | ||||
1 2 | Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application? | No | ||||
1 2 | Modular Equipment Type | Does not apply | ||||
1 2 | Purpose / Application is for | Original Equipment | ||||
1 2 | Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization? | Yes | ||||
1 2 | Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization? | No | ||||
1 2 | Grant Comments | Power listed is conducted. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter. End Users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance. | ||||
1 2 | Is there an equipment authorization waiver associated with this application? | No | ||||
1 2 | If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded? | No | ||||
app s | Test Firm Name and Contact Information | |||||
1 2 | Firm Name |
Itron, Inc
|
||||
1 2 | Name |
J******** H********
|
||||
1 2 | Telephone Number |
509-8********
|
||||
1 2 | Fax Number |
507-8********
|
||||
1 2 |
j******@itron.com
|
|||||
Equipment Specifications | |||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line | Rule Parts | Grant Notes | Lower Frequency | Upper Frequency | Power Output | Tolerance | Emission Designator | Microprocessor Number | |||||||||||||||||||||||||||||||||
1 | 1 | 15C | CC | 908.00000000 | 924.00000000 | 0.1880000 | msp430 | ||||||||||||||||||||||||||||||||||
Line | Rule Parts | Grant Notes | Lower Frequency | Upper Frequency | Power Output | Tolerance | Emission Designator | Microprocessor Number | |||||||||||||||||||||||||||||||||
2 | 1 | 15C | CC | 908.00000000 | 908.00000000 | msp430 |
some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details
This product uses the FCC Data API but is not endorsed or certified by the FCC