MEAZON DINRAIL 3-PHASE ADVANCED Installation Guide 1 Table of Contents Features & Technical Specifications ...................................................................................................................... 2 General Installation instructions ........................................................................................................................... 5 Installation in a three-phase panel ....................................................................................................................... 6 CTs installation .............................................................................................................................................. 6 Power lines L1 L2 L3 installation ................................................................................................................... 6 Installation in a single phase Panel ....................................................................................................................... 7 Installation for loads up to 2400A ......................................................................................................................... 8 External Power Relay installation examples ......................................................................................................... 9 3-phase Power Relay installation .................................................................................................................. 9 1-phase Power Relay installation ................................................................................................................ 10 Indication contact installation examples ............................................................................................................ 11 Brief description .......................................................................................................................................... 11 Night tariff indication example ................................................................................................................... 11 Miniature circuit breaker (MCB) indication example.................................................................................. 11 About MEAZON ................................................................................................................................................... 12 MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 2 Features & Technical Specifications has DINRAIL developed 3-PHASE MEAZON ADVANCED, a 3-Phase electricity meter capable of remote monitoring controllingenergy consumption of a household and/or an industrial building. and It is a wireless metering system based on ZigBee Mesh network technology, featuring a unique design that combines low cost and high accuracy measurements. Every metering device on the ZigBee network is associated with a ZigBee gateway. The role of the gateway is to periodically collect all measurements, gathered by the devices, in order to forward them to the MEAZON Cloud for storage and further analysis. MEAZON Cloud gives users the ability to monitor the current energy consumption, set alarm rules, control their devices (on/off switching) and schedule them to operate in a desired pattern. MEAZON DINRAIL 3-PHASE ADVANCED is a rail-type device with small size (1.5 din), can be easily installed and is capable of monitoring, measurement logging and controlling:
up to three separate power lines / loads a three phased load an entire electrical panel (either single-phase, dual-phase or three-phase) It comes with three current transformers so as to measure any electrical load without limitations. It can drive a cold junction where a Power Relay could potentially be connected and control (on/off) the power supply to a load. The Relays control logic can be externally driven using On/Off commands or internally using MEAZON scheduling. Finally, MEAZON DINRAIL 3-PHASE ADVANCED is equipped with a general purpose indication contact, operating under Neutral detection logic, which can be used as an extra useful information input to your system. Communication Specifications Communication protocol Frequency band Simultaneous operation of multiple metering systems Data communication interval ZigBee Mesh Network 2.4GHz Yes 1 second (default 5 minutes) Response in case of communication loss Yes (Rerouting through igbee) Security - Communication Encryption Yes (AES encryption 128 bits) Data Storage Up to 25 days Electrical Specifications Operating Voltage (*) /
Frequency Power loss Response 100-285 Vac / 45-65 Hz Automatic resumption of operation after power loss Electrical parameters measured Ranges of measured parameters Electrical measurements Irms, Vrms, Active Power & Energy, Reactive Power & Energy Voltage: 0 to 285 Vac between phase and Neutral (**) Current: up to 2400 Amps (CT model depended) Tolerance
+10% of nominal load (I) Accuracy of measurements
<1% of reading measurement error (***)
(*) Make sure your purchased DINRAIL 3-PHASE ADVANCED meets your appliances Voltage
(**) At least one of the measured phases must have models nominal Voltage
(***) Accuracy refers to Electric Power Measurements N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 MEAZON ELECTRONIC SYSTEMS S.A. www.meazon.com 3 Mechanical and Environmental Specifications Power Consumption 5VA Dimensions (WxHxD) 27.8 x 80.0 x 58.3 in mm Mass 0.085 Kg Supply wiring requirements Operating Environment 16 or 18AWG Solid/ Stranded, torque 0.6Nm Temperature: -20C to 50C Relative Humidity: 10% to 90% RH Current Transformers (CT) provided CT 5, accuracy +1%
CT 63, accuracy+1%
CT 125, accuracy+1%
CT 250,accuracy+1%
CT 400A, accuracy +1%
CT 600A, accuracy +1%
Electrical contacts Connector 1 2 3 4 5 6 LED1 LED2 Description Phase L1 Phase L2 Phase L3 Neutral Id L1 L2 L3 N NT CTB Current Transformers Black Wires L1 L2 Relay On/Off Network status Night Tariff Connector 7 8 9 10 11 12 BUTTON Id RN
-
-
Description Power Relay 100~240Vac Neutral NO Connect NO Connect CTR1 Current Transformer 1 Red Wire CTR2 Current Transformer 2 Red Wire CTR3 Current Transformer 3 Red Wire Man/Machine interface Button B Device Status based on led indications L1-LED1 / L2-LED2 LED1On LED1 Off Relay Switch On Relay Switch Off LED1Slow Blinking LED2 Off Idle state, not associated with a network, waits for Man/Machine interaction LED1 Fast Blinking LED2 Off Beacon state, not associated with a network, in ready to join mode LED1 On/Off LED2 Fast Blinking Normal operation, network associated, collecting measurements, Relay Switch On or Off Both LEDS Off Device is not operating Both LEDS Blinking in different frequency Identifying state, network associated, collecting measurements, Relay Switch On or Off Both LEDS Blinking at the same time Operating error, device needs restart MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 4 Safety Information Use this product only in the manner described in this manual. If the equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired. Product may be cleaned with a clean soft towel. Do not use liquids to clean. Product is not water resistant. If the unit gets wet, do not touch it. Power off and allow it to dry thoroughly before further operation. Do not disassemble the product. There are no spare parts for this, it is not repairable. If physical damage to the product occurs, do not use. Replace with a new one. MEAZON DINRAIL 3-PHASE ADVANCED Diagram MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 5 General Installation instructions INSTALLATION REQUIREMENTS The instructions provided below, should be performed only by licensed electricians. Installation from non-
qualified individuals may lead to electrocution or heavy damage to the devices. Wiring requirements: 16 or 18AWG Solid/ Stranded, torque 0.6Nm. Make sure that the maximum amperage to be measured does not exceed the maximum value the provided MEAZON DINRAIL 3-PHASE ADVANCED can measure. MEAZON DINRAIL 3-PHASE ADVANCED must be protected with a 2A circuit breaker (3 pieces for 3-phase electrical panels, 1 piece for single-phase electrical panels). 1) Locate the main electrical panel. 2) Turn the power off for safety reasons. 3) Locate the current conductors to be measured. Current transformers will be added at those conductors WARNING! Current conductors should be between the electrical fuse and the circuit breaker (in case of metering electrical loads separately), or between protection relay and electrical fuse (in case of measuring total consumption). 4) Check inside the electrical panel for the optimal location to place the MEAZON DINRAIL 3-PHASE ADVANCED as well as the 2A protective circuit breaker. MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 6 5) Place the protective circuit breaker at the rail. 6) Place the DINRAIL having the protection clip downwards and lock it at the rail of the electrical panel In this installation guide DINRAIL 3-PHASE ADVANCED will be called DINRAIL for brevity reasons. Installation in a three-phase panel CTs installation Connect each of the three Current Transformers outputs (black wire) to contact 6 (CTB) of the DINRAIL. Connect each of the three Current Transformers inputs (red wire) to contact 10 (CTR1), 11 (CRT2) and 12(CRT3) of the DINRAIL respectively. Locate the current conductors to be measured starting from phase L1 and pass it through the coil of the CT (current transformer) by opening the coil of CT. Close the CTs coil again. The red wire of this CT must be connected to contact 10 (CTR1) of the DINRAIL. WARNING! Make sure the direction of the arrow illustrated at the CT terminals to the load. Reconnect the current conductor. Repeat the process for the other two phases (L2, L3). Power lines L1 L2 L3 installation Power the 2A protective circuit breakers from the main circuit breakers of the electrical panel Connect the output of each of the above circuit breakers with the terminal 1(L1), terminal 2(L2) and terminal 3(L3) respectively of the DINRAIL. WARNING! Make sure that the sequence of phases 1, 2 and 3 of the DINRAIL is strictly L1, L2 and L3, otherwise measurements will be incorrect. Connect the neutral conductor of the electrical panel to contact 4(N) of the DINRAIL. Check the entire procedure again before completing the installation
(sequence of the phases of the inputs of the DINRAIL, sequence of the Current Transformers connection, direction of the arrow of each CT). MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 7 Upon completion of the electrical installation of DINRAIL, the electrical panel should appear as below:
Electrical Panel with DINRAIL 3-PHASE ADVANCED in a 3-Phase Panel Installation in a single phase Panel WARNING! You can measure up to three (3) different loads. To do this, follow the instructions of 3-phase installation above. The only change in this procedure is that you have to bridge terminals 1(L1) 2(L2) - 3(L3). Electrical Panel with DINRAIL 3-PHASE ADVANCED at Single-Phase Panel MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 8 Installation for loads up to 2400A WARNING! The following instructions relate only for DINRAIL version 5A. Using 5A version you can monitor high current electrical loads up to 2400 Amperes (nominal load). PRECONDITION! The electrical installation must include current transformers with secondary winding current max output 5 Ampere. Follow the instructions of 3-phase installation above. Connect a wire to the -K- output of the secondary winding of phase L1 current transformer. Pass the wire through the coil of our DINRAIL current transformer provided (the red wire of this CT must be connected to contact 10 -CTR1- of the DINRAIL). The arrow illustrated on our CT must have K-to-L direction. Connect the remaining edge of wire to the -L- input of the secondary winding of phase L1 current transformer. Repeat the process for the other two current transformers. Electrical Panel with DINRAIL 3-PHASE ADVANCED version 5A in a 3-Phase Panel MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 9 External Power Relay installation examples WARNING! Use Power Relays with coil less than 50 VA. 3-phase Power Relay installation Place Power Relay at the rail. Disconnect the conductors from the loads to be controlled and connect them to the power input connectors of the Power Relay. Connect the power outputs of the Power Relay to the loads with the same order. Connect a conductor from any phase to the Power Relays Coil input connector. Connect a conductor from the Power Relays Coil output connector to the DINRAIL terminal 7 (RN). Electrical Panel with DINRAIL 3-PHASE ADVANCED at a 3-Phase Panel and external 3-phase power relay MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 10 1-phase Power Relay installation Electrical Panel with DINRAIL 3-PHASE ADVANCED at a single-Phase Panel and external single-phase power relay MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 11 Indication contact installation examples Brief description DinRail3-Phase Advanced connector 5 (NT) is a general purpose indication contact that can be used as a useful information input to your system, under certain circumstances. It operates under Neutral detection logic. The usage of this contact is shown on the following examples. Night tariff indication example Connect a conductor from the output of the night tariff indication led to the DINRAILS connector 5 (NT). The picture in the right shows how to connect night tariff indigation. DINRAIL would inform your system for the status of night tariff change
(enabled or disabled) in your appliance. Miniature circuit breaker (MCB) indication example WARNING! The following connection would have effect only for loads that include Neutral connection. It would not have any effect e.g. for 3-phase loads without neutral. WARNING! The following connection would have effect only for operating loads. If a load has been stopped e.g. by a switch, DINRAIL would not detect any change of the MCB. Connect a conductor from the output of the MCB to the DINRAIL connector 5 (NT). The picture in the right shows how to connect MCB indigation. DINRAIL would inform your system for the status of MCB change (enabled or disabled) in your appliance. MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com 12 About MEAZON MEAZON acts as a catalyst to the energy efficiency market. We design and manufacture revolutionary small size energy meters and integrate them with cloud technology. We build on open standards and provide insights in energy consumption of commercial and residential buildings. This way we drive significant energy efficiencies. For more information visit www.meazon.com. Contact Information N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Telephone: +30 2610 430000 24 Fokidos Str., 15126, Ampelokipoi, Athens, Greece Telephone: +30 210 8020205 E-mail:info@meazon.com Copyright 2014, MEAZON S.A. MEAZON ELECTRONIC SYSTEMS S.A. N.E.O PATRON ATHINON 57, 26442, PATRA, Greece Greeceinfo@meazon.com support@meazon.com +30 2610 430000 www.meazon.com NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
- Reorient or relocate the receiving antenna.
- Increase the separation between the equipment and receiver.
-Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.
-Consult the dealer or an experienced radio/TV technician for help Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:
(1) this device may not cause harmful interference, and