FCC ID: IHDT56AL4 Mobile Cellular Phone

by: Motorola Mobility LLC latest update: 2023-01-31 model: T56AL4

Six grants have been issued under this FCC ID on 01/31/2023 (this is one of two hundred and nineteen releases in 2023 for this grantee). Public details available include internal & external photos, frequency information, and manuals. some products also feature user submitted or linked password defaults, drivers, troubleshooting guides, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 GSG Users Manual pdf 1.25 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 LI Users Manual pdf 1.16 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 InPho Part1-3 Internal Photos pdf 5.58 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 InPho Part2-3 Internal Photos pdf 5.55 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 InPho Part3-3 r1 Internal Photos pdf 2.74 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 ExPho External Photos pdf 2.95 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 XT2317-1 E-Label and Step ID Label/Location Info pdf 69.65 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 XT2317-2 E-Label and Step ID Label/Location Info pdf 64.96 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 XT2317-3 E-Label and Step ID Label/Location Info pdf 70.21 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 XT2317DL E-Label and Step ID Label/Location Info pdf 71.21 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Antenna Spec r1 Test Report pdf 622.07 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Block Diagram Block Diagram pdf January 31 2023 confidential
1 2 3 4 5 6 OD Sample Product Equality Declaration Operational Description pdf January 31 2023 confidential
1 2 3 4 5 6 OperationDescription r2 Operational Description pdf January 31 2023 confidential
1 2 3 4 5 6 PartsLst Parts List/Tune Up Info pdf January 31 2023 confidential
1 2 3 4 5 6 Power Management Theory of Operation Operational Description pdf January 31 2023 confidential
1 2 3 4 5 6 SchemDic Schematics pdf January 31 2023 confidential
1 2 3 4 5 6 TestRpt HAC RF Test Report pdf 1.08 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix A Test Report pdf 533.34 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix B Test Report pdf 4.24 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix C Part1-2 Test Report pdf 4.99 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix C Part2-2 Test Report pdf 3.48 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix E Test Report pdf 1.36 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil Test Report pdf 1.19 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil VOIP Test Report pdf 919.47 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil VOIP Appendix A Test Report pdf 1.69 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil VOIP Appendix B Test Report pdf 717.88 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil Appendix A Test Report pdf 3.70 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil Appendix B Test Report pdf 3.63 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE 2G, 3G Part1-2 Test Report pdf 5.41 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE 2G, 3G Part2-2 Test Report pdf 2.31 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE 27D B30 r1 Test Report pdf 5.14 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE 90R B14 Test Report pdf 5.39 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE 90S B26 Test Report pdf 5.80 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part1-5 Test Report pdf 5.41 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part2-5 Test Report pdf 5.33 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part3-5 Test Report pdf 5.37 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part4-5 Test Report pdf 5.37 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part5-5 r1 Test Report pdf 3.45 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part1-5 r1 Test Report pdf 5.61 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part2-5 Test Report pdf 5.42 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part3-5 Test Report pdf 5.34 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part4-5 Test Report pdf 5.52 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part5-5 Test Report pdf 5.11 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 1-8 RF Exposure Info pdf 5.43 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 2-8 RF Exposure Info pdf 5.28 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 3-8 RF Exposure Info pdf 5.44 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 4-8 RF Exposure Info pdf 5.36 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 5-8 RF Exposure Info pdf 5.34 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 6-8 RF Exposure Info pdf 5.44 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 7-8 RF Exposure Info pdf 5.36 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 8-8 RF Exposure Info pdf 4.92 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup Antenna Spec r1 Test Setup Photos pdf 803.36 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup HAC RF Test Setup Photos pdf 202.87 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup HAC T-Coil Test Setup Photos pdf 290.98 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup HAC T-Coil VOIP Test Setup Photos pdf 184.39 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE 2G, 3G Test Setup Photos pdf 274.64 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE 27D B30 Test Setup Photos pdf 274.86 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE 90R B14 Test Setup Photos pdf 274.58 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE 90S B26 Test Setup Photos pdf 274.65 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE B2.4.5.12.13.17.25.26.66 Test Setup Photos pdf 296.73 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE B7.71.38.41.41C Test Setup Photos pdf 274.79 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup SAR Part1 Test Setup Photos pdf 831.72 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tune-up Parts List/Tune Up Info pdf January 31 2023 confidential
1 2 3 4 5 6 cvrltr Declaration Letter for HAC Cover Letter(s) pdf 106.00 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 cvrltr FCC Confidentiality Request Cover Letter(s) pdf 138.78 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Power of Attorney Letter Cover Letter(s) pdf 155.20 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Device SW Security Statement SDR Software/Security Inf pdf January 30 2023 confidential
1 2 3 4 5 6 TestRpt NII DFS Test Report pdf 999.00 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII U-NII-1,2 Part1-3 Test Report pdf 5.32 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII U-NII-1,2 Part2-3 Test Report pdf 5.42 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII U-NII-1,2 Part3-3 Test Report pdf 5.37 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup NII DFS Test Setup Photos pdf 248.23 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 Tsup NII U-NII-1,2 Test Setup Photos pdf 389.71 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 Test Report pdf January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup JBP&CXX r1 Test Setup Photos pdf 328.83 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 InPho Part3-3 Internal Photos pdf January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 TestRpt DTS BLE Test Report pdf 5.67 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt DTS WLAN 2.4G Part1-2 Test Report pdf 5.44 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt DTS WLAN 2.4G Part2-2 Test Report pdf 4.46 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup DTS BLE Test Setup Photos pdf 400.68 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 Tsup DTS WLAN 2.4G Test Setup Photos pdf 402.22 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 TestRpt DSS BT Part1-2 Test Report pdf 5.39 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt DSS BT Part2-2 Test Report pdf 1.54 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup DSS BT Test Setup Photos pdf 439.28 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 GSG Users Manual pdf 1.25 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 LI Users Manual pdf 1.16 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 InPho Part1-3 Internal Photos pdf 5.58 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 InPho Part2-3 Internal Photos pdf 5.55 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 InPho Part3-3 r1 Internal Photos pdf 2.74 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 ExPho External Photos pdf 2.95 MiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 XT2317-1 E-Label and Step ID Label/Location Info pdf 69.65 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 XT2317-2 E-Label and Step ID Label/Location Info pdf 64.96 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 XT2317-3 E-Label and Step ID Label/Location Info pdf 70.21 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 XT2317DL E-Label and Step ID Label/Location Info pdf 71.21 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Antenna Spec r1 Test Report pdf 622.07 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Test Report pdf 1.08 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix A Test Report pdf 533.34 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix B Test Report pdf 4.24 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix C Part1-2 Test Report pdf 4.99 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix C Part2-2 Test Report pdf 3.48 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC RF Appendix E Test Report pdf 1.36 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil Test Report pdf 1.19 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil VOIP Test Report pdf 919.47 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil VOIP Appendix A Test Report pdf 1.69 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil VOIP Appendix B Test Report pdf 717.88 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil Appendix A Test Report pdf 3.70 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt HAC T-Coil Appendix B Test Report pdf 3.63 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE 2G, 3G Part1-2 Test Report pdf 5.41 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE 2G, 3G Part2-2 Test Report pdf 2.31 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE 27D B30 r1 Test Report pdf 5.14 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE 90R B14 Test Report pdf 5.39 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE 90S B26 Test Report pdf 5.80 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part1-5 Test Report pdf 5.41 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part2-5 Test Report pdf 5.33 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part3-5 Test Report pdf 5.37 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part4-5 Test Report pdf 5.37 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B2.4.5.12.13.17.25.26.66 Part5-5 r1 Test Report pdf 3.45 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part1-5 r1 Test Report pdf 5.61 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part2-5 Test Report pdf 5.42 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part3-5 Test Report pdf 5.34 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part4-5 Test Report pdf 5.52 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt PCE LTE B7.71.38.41.41C Part5-5 Test Report pdf 5.11 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 1-8 RF Exposure Info pdf 5.43 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 2-8 RF Exposure Info pdf 5.28 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 3-8 RF Exposure Info pdf 5.44 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 4-8 RF Exposure Info pdf 5.36 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 5-8 RF Exposure Info pdf 5.34 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 6-8 RF Exposure Info pdf 5.44 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 7-8 RF Exposure Info pdf 5.36 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt SAR Part 1 Part 8-8 RF Exposure Info pdf 4.92 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup Antenna Spec r1 Test Setup Photos pdf 803.36 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup HAC RF Test Setup Photos pdf 202.87 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup HAC T-Coil Test Setup Photos pdf 290.98 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup HAC T-Coil VOIP Test Setup Photos pdf 184.39 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE 2G, 3G Test Setup Photos pdf 274.64 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE 27D B30 Test Setup Photos pdf 274.86 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE 90R B14 Test Setup Photos pdf 274.58 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE 90S B26 Test Setup Photos pdf 274.65 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE B2.4.5.12.13.17.25.26.66 Test Setup Photos pdf 296.73 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup PCE LTE B7.71.38.41.41C Test Setup Photos pdf 274.79 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 Tsup SAR Part1 Test Setup Photos pdf 831.72 KiB January 31 2023 / July 30 2023 delayed release
1 2 3 4 5 6 cvrltr Declaration Letter for HAC Cover Letter(s) pdf 106.00 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 cvrltr FCC Confidentiality Request Cover Letter(s) pdf 138.78 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Power of Attorney Letter Cover Letter(s) pdf 155.20 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII DFS Test Report pdf 999.00 KiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII U-NII-1,2 Part1-3 Test Report pdf 5.32 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII U-NII-1,2 Part2-3 Test Report pdf 5.42 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt NII U-NII-1,2 Part3-3 Test Report pdf 5.37 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup NII DFS Test Setup Photos pdf 248.23 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 Tsup NII U-NII-1,2 Test Setup Photos pdf 389.71 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 Test Report pdf January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup JBP&CXX r1 Test Setup Photos pdf 328.83 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 TestRpt DTS BLE Test Report pdf 5.67 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt DTS WLAN 2.4G Part1-2 Test Report pdf 5.44 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt DTS WLAN 2.4G Part2-2 Test Report pdf 4.46 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup DTS BLE Test Setup Photos pdf 400.68 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 Tsup DTS WLAN 2.4G Test Setup Photos pdf 402.22 KiB January 30 2023 / July 31 2023 delayed release
1 2 3 4 5 6 TestRpt DSS BT Part1-2 Test Report pdf 5.39 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 TestRpt DSS BT Part2-2 Test Report pdf 1.54 MiB January 30 2023 / January 31 2023
1 2 3 4 5 6 Tsup DSS BT Test Setup Photos pdf 439.28 KiB January 30 2023 / July 31 2023 delayed release

frequency equipment class purpose
1 2023-01-31 2580 ~ 2610 PCE - PCS Licensed Transmitter held to ear Original Equipment
2 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
3 JBP - Part 15 Class B Computing Device Peripheral
4 2412 ~ 2462 DTS - Digital Transmission System
5 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
6 859 ~ 894 CXX - Communications Rcvr for use w/ licensed Tx and CBs

Application Forms

app s Applicant Information
1 2 3 4 5 6 Effective 2023-01-31
1 2 3 4 5 6 Applicant's complete, legal business name Motorola Mobility LLC
1 2 3 4 5 6 FCC Registration Number (FRN) 0004321311
1 2 3 4 5 6 Physical Address Motorola Mobility LLC 222 W. Merchandise Mart Plaza
1 2 3 4 5 6 Motorola Mobility LLC
1 2 3 4 5 6 Chicago, IL
1 2 3 4 5 6 United States
app s TCB Information
1 2 3 4 5 6 TCB Application Email Address c******@sporton-usa.com
1 2 3 4 5 6 TCB Scope B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
app s FCC ID
1 2 3 4 5 6 Grantee Code IHD
1 2 3 4 5 6 Equipment Product Code T56AL4
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 Name J**** N********
1 2 3 4 5 6 Title Director Product Compliance
1 2 3 4 5 6 Telephone Number 847-6********
1 2 3 4 5 6 Fax Number 847-6********
1 2 3 4 5 6 E-mail n******@motorola.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)07/30/2023
1 2 3 4 5 6 07/31/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 Equipment ClassPCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 DTS - Digital Transmission System
1 2 3 4 5 6 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 CXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Mobile Cellular Phone
1 2 3 4 5 6 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 5 6 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 Grant CommentsOutput Power listed is ERP for operations below 1GHz; EIRP for operations above 1 GHz and conducted power for Part 90 (814-824 MHz). SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.07 W/kg, 1.44 W/kg, 1.44 W/kg, 1.58 W/kg and 3.54 W/kg, respectively. This device supports LTE of 1.4, 3, 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Bands 2, 4, 25 and 66; LTE of 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Band 7 and 71; LTE of 1.4, 3, 5 and 10 MHz bandwidth modes for FDD LTE Bands 5 and 12; LTE of 5 and 10 MHz bandwidth modes for FDD LTE Bands 13, 14,17 and 30; LTE of 1.4, 3, 5, 10 and 15 MHz bandwidth modes for FDD LTE Band 26; and LTE of 5, 10, 15 and 20 MHz bandwidth modes for TDD LTE Bands 38 and 41. This device also supports LTE uplink carrier aggregation as described in this filing. HAC Rating: M3 T3: 2011. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 4 5 6 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.18 W/kg, 1.19 W/kg, 0.31W/kg, 1.58 W/kg and 2.35 W/kg, respectively. HAC Rating: M3 T3: 2011. This device supports 20, 40 and 80 MHz bandwidths modes.
1 2 3 4 5 6 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. head, body-worn accessory, product specific (wireless router), and simultaneous transmission exposure conditions are 1.36 W/kg, 0.87 W/kg, 0.32 W/kg, and 1.58 W/kg, respectively. HAC Rating: M3 T3: 2011. This device supports 20 and 40 MHz bandwidth mode.
1 2 3 4 5 6 Output Power listed is the maximum conducted output power. SAR compliance for body- worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router) and simultaneous transmission exposure conditions are 0.13 W/kg, < 0.10 W/kg, < 0.10 W/kg and 1.58W/kg, respectively.
1 2 3 4 5 6 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 Firm Name Sporton International Inc. (Kunshan)
1 2 3 4 5 6 Name J******** T****
1 2 3 4 5 6 Telephone Number +86 0********
1 2 3 4 5 6 E-mail J******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 22H HC 824.2 848.8 0.5715 2.5 ppm 245KGXW
1 2 22H HC 824.2 848.8 0.1888 2.5 ppm 240KG7W
1 3 22H HC 826.4 846.6 0.0673 2.5 ppm 4M16F9W
1 4 24E HC 1850.2 1909.8 1.0666 2.5 ppm 244KGXW
1 5 24E HC 1850.2 1909.8 0.4775 2.5 ppm 240KG7W
1 6 24E HC 1852.4 1907.6 0.246 2.5 ppm 4M18F9W
1 7 27 HC 1712.4 1752.6 0.2564 2.5 ppm 4M17F9W
1 8 24E HC 1860 1900 0.2051 2.5 ppm 17M9G7D
1 9 24E HC 1860 1900 0.1679 2.5 ppm 17M9W7D
1 1 24E HC 1860 1905 0.208 2.5 ppm 17M9G7D
1 11 24E HC 1860 1905 0.1706 2.5 ppm 17M9W7D
1 12 27 HC 1720 1745 0.2223 2.5 ppm 18M4G7D
1 13 27 HC 1720 1745 0.1905 2.5 ppm 18M3W7D
1 14 22H HC 829 844 0.0621 2.5 ppm 9M09G7D
1 15 22H HC 829 844 0.0499 2.5 ppm 9M07W7D
1 16 27 HC 704 711 0.0488 2.5 ppm 9M09G7D
1 17 27 HC 704 711 0.0393 2.5 ppm 9M05W7D
1 18 27 HC 782 782 0.0382 2.5 ppm 9M09G7D
1 19 27 HC 782 782 0.031 2.5 ppm 8M99W7D
1 2 27 HC 709 711 0.046 2.5 ppm 9M09G7D
1 21 27 HC 709 711 0.0385 2.5 ppm 9M05W7D
1 22 22H HC 831.5 841.5 0.0628 2.5 ppm 13M4G7D
1 23 22H HC 831.5 841.5 0.0498 2.5 ppm 13M6W7D
1 24 27 HC 1720 1770 0.2259 2.5 ppm 18M4G7D
1 25 27 HC 1720 1770 0.1866 2.5 ppm 18M3W7D
1 26 27 HC 2510 2560 0.1959 2.5 ppm 17M9G7D
1 27 27 HC 2510 2560 0.1622 2.5 ppm 17M9W7D
1 28 27 HC 2580 2610 0.1991 2.5 ppm 17M9G7D
1 29 27 HC 2580 2610 0.1528 2.5 ppm 17M8W7D
1 3 27 HC 2506 2680 0.4989 2.5 ppm 17M9G7D
1 31 27 HC 2506 2680 0.4188 2.5 ppm 17M8W7D
1 32 27 HC 2506 2680 0.4355 2.5 ppm 37M7G7D
1 33 27 HC 2506 2680 0.3381 2.5 ppm 37M9W7D
1 34 27 HC 673 688 0.0543 2.5 ppm 18M4G7D
1 35 27 HC 673 688 0.045 2.5 ppm 18M2W7D
1 36 9 HC 824 824 0.175 2.5 ppm 13M4G7D
1 37 9 HC 824 824 0.1377 2.5 ppm 13M4W7D
1 38 9 HC 816.5 821.5 0.1786 2.5 ppm 4M50G7D
1 39 9 HC 816.5 821.5 0.1406 2.5 ppm 4M48W7D
1 4 9 HC 793 793 0.0357 1.25 ppm 9M03G7D
1 41 9 HC 793 793 0.0283 1.25 ppm 9M03W7G
1 42 27 HC 2310 2310 0.2355 2.5 ppm 9M01G7D
1 43 27 HC 2310 2310 0.1807 2.5 ppm 9M05W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC HC 5180 5240 0.0726
2 2 15E CC HC 5260 5320 0.0608
2 3 15E CC HC 5500 5720 0.0527
2 4 15E CC HC 5745 5825 0.0414
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2402 2480 0.0023
4 2 15C CC HC 2412 2462 0.3963
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15C CC 2402.00000000 2480.00000000 0.0092000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 15B CC 859 894
6 2 15B CC 729 756
6 3 15B CC 758 768
6 4 15B CC 717 728
6 5 15B CC 617 652
6 6 15B CC 88 108

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC