FCC ID: IHDT56AM4 Mobile Cellular Phone

by: Motorola Mobility LLC latest update: 2023-08-15 model: T56AM4

Seven grants have been issued under this FCC ID on 08/15/2023 (this is one of two hundred and nineteen releases in 2023 for this grantee). Public details available include manuals, internal & external photos, and frequency information. some products also feature user submitted or linked warrantee terms, password defaults, drivers, instructions, & troubleshooting guides.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 GSG Users Manual pdf 935.57 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 LI Users Manual pdf 1.01 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part1 Internal Photos pdf 5.61 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part2 Internal Photos pdf 5.65 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part3 Internal Photos pdf 5.67 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part4 Internal Photos pdf 2.22 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 ExPho External Photos pdf 2.31 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 ID Label/Location Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 BlckDic Block Diagram pdf August 01 2023 confidential
1 2 3 4 5 6 7 OD PED r1 Operational Description pdf August 01 2023 confidential
1 2 3 4 5 6 7 PartsLst Parts List/Tune Up Info pdf August 01 2023 confidential
1 2 3 4 5 6 7 SchemDic Schematics pdf August 01 2023 confidential
1 2 3 4 5 6 7 TestRpt JBP CXX Test Report pdf 820.01 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup JBP CXX Test Setup Photos pdf 293.60 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Attestation Statements pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Attestation Statements pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Cover Letter(s) pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Cover Letter(s) pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Test Report pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 OpDes r1 Operational Description pdf August 01 2023 confidential
1 2 3 4 5 6 7 TestRpt DSS BT Test Report pdf 4.97 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup Antenna Report Test Setup Photos pdf 594.03 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup DSS BT Test Setup Photos pdf 366.34 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup SAR Test Setup Photos pdf 1.53 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tune-up Parts List/Tune Up Info pdf August 01 2023 confidential
1 2 3 4 5 6 7 TestRpt DXX NFC Test Report pdf 1.06 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC RF Exposure Info pdf 1.63 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix A RF Exposure Info pdf 295.02 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix B RF Exposure Info pdf 270.72 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix C Part1-3 RF Exposure Info pdf 5.60 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix C Part2-3 RF Exposure Info pdf 4.93 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix C Part3-3 RF Exposure Info pdf 5.30 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup DXX NFC Test Setup Photos pdf 396.77 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup SAR NFC Test Setup Photos pdf 744.51 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 5G Sub-6GHz VoIP OTT and VONR HAC Attestation Cover Letter(s) pdf 135.95 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Test Report pdf 1.37 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix A Test Report pdf 784.07 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix B Test Report pdf 3.52 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix C Part1-3 Test Report pdf 5.56 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix C Part2-3 Test Report pdf 5.64 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix C Part3-3 Test Report pdf 5.25 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix E Test Report pdf 1.36 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Test Report pdf 1.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil VOIP Test Report pdf 1.07 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil VOIP Appendix A Test Report pdf 1.94 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil VOIP Appendix B Test Report pdf 641.49 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Appendix A Part1-2 Test Report pdf 5.42 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Appendix A Part2-2 Test Report pdf 3.49 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Appendix B Test Report pdf 2.18 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 2G,3G Part1-2 Test Report pdf 5.42 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 2G,3G Part2-2 Test Report pdf 2.27 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G 27Q n78 Part1-2 Test Report pdf 5.55 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G 27Q n78 Part2-2 Test Report pdf 3.87 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G 90S n26 r1 Test Report pdf 3.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part1-4 Test Report pdf 5.31 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part2-4 Test Report pdf 5.43 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part3-4 Test Report pdf 5.49 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part4-4 Test Report pdf 4.23 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE 27Q B42 Test Report pdf 5.29 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE 90S B26 Test Report pdf 5.71 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part1-8 Test Report pdf 5.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part2-8 Test Report pdf 5.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part3-8 Test Report pdf 5.59 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part4-8 Test Report pdf 5.40 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part5-8 Test Report pdf 5.47 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part6-8 Test Report pdf 5.45 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part1-9 Test Report pdf 5.45 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part2-9 Test Report pdf 5.42 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part3-9 Test Report pdf 5.40 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part4-9 Test Report pdf 5.52 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part5-9 Test Report pdf 5.55 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part6-9 Test Report pdf 5.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part7-9 Test Report pdf 5.35 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part8-9 Test Report pdf 5.34 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part9-9 Test Report pdf 5.81 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup HAC RF Test Setup Photos pdf 550.75 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup HAC T-coil Test Setup Photos pdf 551.23 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup HAC T-coil VOIP Test Setup Photos pdf 243.55 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 2G,3G Test Setup Photos pdf 370.21 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 5G 27Q n78 Test Setup Photos pdf 227.56 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 5G 90S n26 Test Setup Photos pdf 226.61 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 5G n2.5.7.26.66 Test Setup Photos pdf 490.55 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE 27Q B42 Test Setup Photos pdf 227.53 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE 90S B26 Test Setup Photos pdf 225.70 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE B12.13.17.7.7C.38.38C.41.41C Test Setup Photos pdf 401.88 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE B2.4.5.25.26.66.66B.66C Test Setup Photos pdf 348.54 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE Inter band CA Test Setup Photos pdf 227.59 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 cvrltr Declaration Letter for HAC Cover Letter(s) pdf 106.04 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 GSG Users Manual pdf 935.57 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 LI Users Manual pdf 1.01 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part1 Internal Photos pdf 5.61 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part2 Internal Photos pdf 5.65 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part3 Internal Photos pdf 5.67 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 InPho Part4 Internal Photos pdf 2.22 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 ExPho External Photos pdf 2.31 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 ID Label/Location Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt JBP CXX Test Report pdf 820.01 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup JBP CXX Test Setup Photos pdf 293.60 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Attestation Statements pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Attestation Statements pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Cover Letter(s) pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Cover Letter(s) pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Test Report pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt DSS BT Test Report pdf 4.97 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 RF Exposure Info pdf August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup Antenna Report Test Setup Photos pdf 594.03 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup DSS BT Test Setup Photos pdf 366.34 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup SAR Test Setup Photos pdf 1.53 MiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 TestRpt DXX NFC Test Report pdf 1.06 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC RF Exposure Info pdf 1.63 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix A RF Exposure Info pdf 295.02 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix B RF Exposure Info pdf 270.72 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix C Part1-3 RF Exposure Info pdf 5.60 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix C Part2-3 RF Exposure Info pdf 4.93 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt SAR NFC Appendix C Part3-3 RF Exposure Info pdf 5.30 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup DXX NFC Test Setup Photos pdf 396.77 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup SAR NFC Test Setup Photos pdf 744.51 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 5G Sub-6GHz VoIP OTT and VONR HAC Attestation Cover Letter(s) pdf 135.95 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Test Report pdf 1.37 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix A Test Report pdf 784.07 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix B Test Report pdf 3.52 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix C Part1-3 Test Report pdf 5.56 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix C Part2-3 Test Report pdf 5.64 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix C Part3-3 Test Report pdf 5.25 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC RF Appendix E Test Report pdf 1.36 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Test Report pdf 1.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil VOIP Test Report pdf 1.07 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil VOIP Appendix A Test Report pdf 1.94 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil VOIP Appendix B Test Report pdf 641.49 KiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Appendix A Part1-2 Test Report pdf 5.42 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Appendix A Part2-2 Test Report pdf 3.49 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt HAC T-coil Appendix B Test Report pdf 2.18 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 2G,3G Part1-2 Test Report pdf 5.42 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 2G,3G Part2-2 Test Report pdf 2.27 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G 27Q n78 Part1-2 Test Report pdf 5.55 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G 27Q n78 Part2-2 Test Report pdf 3.87 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G 90S n26 r1 Test Report pdf 3.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part1-4 Test Report pdf 5.31 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part2-4 Test Report pdf 5.43 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part3-4 Test Report pdf 5.49 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE 5G n2.5.7.26.66 Part4-4 Test Report pdf 4.23 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE 27Q B42 Test Report pdf 5.29 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE 90S B26 Test Report pdf 5.71 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part1-8 Test Report pdf 5.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part2-8 Test Report pdf 5.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part3-8 Test Report pdf 5.59 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part4-8 Test Report pdf 5.40 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part5-8 Test Report pdf 5.47 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B12.13.17.7.7C.38.38C.41.41C Part6-8 Test Report pdf 5.45 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part1-9 Test Report pdf 5.45 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part2-9 Test Report pdf 5.42 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part3-9 Test Report pdf 5.40 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part4-9 Test Report pdf 5.52 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part5-9 Test Report pdf 5.55 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part6-9 Test Report pdf 5.53 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part7-9 Test Report pdf 5.35 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part8-9 Test Report pdf 5.34 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 TestRpt PCE LTE B2.4.5.25.26.66.66B.66C Part9-9 Test Report pdf 5.81 MiB August 01 2023 / August 15 2023
1 2 3 4 5 6 7 Tsup HAC RF Test Setup Photos pdf 550.75 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup HAC T-coil Test Setup Photos pdf 551.23 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup HAC T-coil VOIP Test Setup Photos pdf 243.55 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 2G,3G Test Setup Photos pdf 370.21 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 5G 27Q n78 Test Setup Photos pdf 227.56 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 5G 90S n26 Test Setup Photos pdf 226.61 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE 5G n2.5.7.26.66 Test Setup Photos pdf 490.55 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE 27Q B42 Test Setup Photos pdf 227.53 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE 90S B26 Test Setup Photos pdf 225.70 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE B12.13.17.7.7C.38.38C.41.41C Test Setup Photos pdf 401.88 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE B2.4.5.25.26.66.66B.66C Test Setup Photos pdf 348.54 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 Tsup PCE LTE Inter band CA Test Setup Photos pdf 227.59 KiB August 01 2023 / February 12 2024 delayed release
1 2 3 4 5 6 7 cvrltr Declaration Letter for HAC Cover Letter(s) pdf 106.04 KiB August 01 2023 / August 15 2023

frequency equipment class purpose
1 2023-08-15 859 ~ 894 CXX - Communications Rcvr for use w/ licensed Tx and CBs Original Equipment
2 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
3 JBP - Part 15 Class B Computing Device Peripheral
4 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter
5 3500.01 ~ 3500.01 PCE - PCS Licensed Transmitter held to ear
6 2412 ~ 2462 DTS - Digital Transmission System
7 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 Effective 2023-08-15
1 2 3 4 5 6 7 Applicant's complete, legal business name Motorola Mobility LLC
1 2 3 4 5 6 7 FCC Registration Number (FRN) 0004321311
1 2 3 4 5 6 7 Physical Address Motorola Mobility LLC
1 2 3 4 5 6 7 Chicago, Illinois 60654
1 2 3 4 5 6 7 United States
app s TCB Information
1 2 3 4 5 6 7 TCB Application Email Address K******@sporton-usa.com
1 2 3 4 5 6 7 TCB Scope A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 7 A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
app s FCC ID
1 2 3 4 5 6 7 Grantee Code IHD
1 2 3 4 5 6 7 Equipment Product Code T56AM4
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 Name J******** N********
1 2 3 4 5 6 7 Title Director Product Compliance
1 2 3 4 5 6 7 Telephone Number 847-6********
1 2 3 4 5 6 7 Fax Number 847-6********
1 2 3 4 5 6 7 E-mail n******@motorola.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)02/12/2024
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 Equipment ClassCXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 7 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 7 DXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 DTS - Digital Transmission System
1 2 3 4 5 6 7 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Mobile Cellular Phone
1 2 3 4 5 6 7 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 Grant CommentsOutput Power listed is the maximum conducted output power. SAR compliance for body- worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router) and simultaneous transmission exposure conditions are 0.47 W/kg, 0.44W/kg, 0.49 W/kg and 1.58 W/kg, respectively.
1 2 3 4 5 6 7 The highest SAR values for product specific (10g SAR) and simultaneous transmission conditions are < 0.10 W/kg and 3.95 W/kg.
1 2 3 4 5 6 7 Output Power is EIRP and ERP for above and below 1 GHz, respectively, except for Part 90 LTE Band 26 and 5G n26 emissions, which are conducted. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.16 W/kg, 1.39 W/kg, 1.39 W/kg, 1.59 W/kg and 3.48 W/kg, respectively. This device supports LTE of 1.4, 3, 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Bands 2, 4, 25 and 66; LTE of 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Band 7; LTE of 1.4, 3, 5 and 10 MHz bandwidth modes for FDD LTE Bands 5 and 12; LTE of 5 and 10 MHz bandwidth modes for FDD LTE Bands 13 and 17; LTE of 1.4, 3, 5, 10 and 15 MHz bandwidth modes for FDD LTE Band 26; and LTE of 5, 10, 15 and 20 MHz bandwidth modes for TDD LTE Bands 38, 41 and 42. This device also supports LTE uplink carrier aggregation as described in this filing. This device also supports Frequency Range 1 5G NR modes of 5, 10, 15, 20, 25 and 30 MHz bandwidth modes for FDD Band n2; 5, 10, 15, 20 and 25 MHz bandwidth modes for FDD Band n5; 5, 10, 15, 20, 25, 30, 40 and 50 MHz bandwidth modes for FDD Band n7; 5, 10, 15 and 20 MHz bandwidth modes for FDD Band n26; 5, 10, 15, 20, 25, 30, 35, 40 and 45 MHz bandwidth modes for FDD Band n66; and 10, 15, 20, 30, 40, 50, 60, 70, 80, 90 and 100 MHz bandwidth modes for TDD Band n78. Frequency Range 1 5G NR ENDC modes are supported by this device, as described in this filing. HAC Rating: M4 T3: 2011. T-coil 5G sub 6 bands appraised as equivalent LTE connections. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 4 5 6 7 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 0.93 W/kg, 1.39 W/kg, 0.65 W/kg, 1.59 W/kg and 2.10 W/kg, respectively. HAC Rating: M4 T3: 2011. This device supports 20 MHz bandwidth mode.
1 2 3 4 5 6 7 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.19 W/kg, 1.13 W/kg, 0.71 W/kg, 1.59 W/kg and 1.91 W/kg, respectively. HAC Rating: M4 T3: 2011. This device supports 20, 40 and 80 MHz bandwidths modes.
1 2 3 4 5 6 7 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 Firm Name Sporton International Inc. (Kunshan)
1 2 3 4 5 6 7 Name J**** T******
1 2 3 4 5 6 7 Telephone Number +86 0********
1 2 3 4 5 6 7 E-mail J******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15B CC 859 894
1 2 15B CC 729 756
1 3 15B CC 88 108
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC 2402.00000000 2480.00000000 0.0341000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 13.56000000 13.56000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 22H HC 824.2 848.8 0.7145 2.5 ppm 246KGXW
5 2 22H HC 824.2 848.8 0.1897 2.5 ppm 250KG7W
5 3 22H HC 826.4 846.6 0.0673 2.5 ppm 4M15F9W
5 4 24E HC 1850.2 1909.8 0.3532 2.5 ppm 245KGXW
5 5 24E HC 1850.2 1909.8 0.1355 2.5 ppm 255KG7W
5 6 24E HC 1852.4 1907.6 0.0716 2.5 ppm 4M15F9W
5 7 27 HC 1712.4 1752.6 0.0993 2.5 ppm 4M14F9W
5 8 24E HC 1860 1900 0.0718 2.5 ppm 17M9G7D
5 9 24E HC 1860 1900 0.0552 2.5 ppm 17M9W7D
5 1 24E HC 1860 1905 0.076 2.5 ppm 17M9G7D
5 11 24E HC 1860 1905 0.0574 2.5 ppm 17M9W7D
5 12 27 HC 1720 1745 0.0918 2.5 ppm 17M9G7D
5 13 27 HC 1720 1745 0.0735 2.5 ppm 17M9W7D
5 14 27 HC 1720 1770 0.0931 2.5 ppm 17M9G7D
5 15 27 HC 1720 1770 0.0748 2.5 ppm 17M9W7D
5 16 22H HC 829 844 0.0676 2.5 ppm 9M01G7D
5 17 22H HC 829 844 0.0543 2.5 ppm 9M03W7D
5 18 22H HC 831.5 841.5 0.0689 2.5 ppm 13M4G7D
5 19 22H HC 831.5 841.5 0.0548 2.5 ppm 13M4W7D
5 2 27 HC 1715 1775 0.0998 2.5 ppm 18M8G7D
5 21 27 HC 1715 1775 0.0785 2.5 ppm 18M8W7D
5 22 27 HC 1720 1770 0.1012 2.5 ppm 37M7G7D
5 23 27 HC 1720 1770 0.0798 2.5 ppm 37M7W7D
5 24 27 HC 2510 2560 0.0839 2.5 ppm 17M9G7D
5 25 27 HC 2510 2560 0.0671 2.5 ppm 18M0W7D
5 26 27 HC 704 711 0.0493 2.5 ppm 9M01G7D
5 27 27 HC 704 711 0.0378 2.5 ppm 8M99W7D
5 28 27 HC 782 782 0.0396 2.5 ppm 9M01G7D
5 29 27 HC 782 782 0.0303 2.5 ppm 9M01W7D
5 3 27 HC 709 711 0.0486 2.5 ppm 9M01G7D
5 31 27 HC 709 711 0.037 2.5 ppm 8M99W7D
5 32 27 HC 2580 2610 0.0738 2.5 ppm 17M9G7D
5 33 27 HC 2580 2610 0.0582 2.5 ppm 17M9W7D
5 34 27 HC 2506 2680 0.0771 2.5 ppm 17M9G7D
5 35 27 HC 2506 2680 0.0612 2.5 ppm 17M9W7D
5 36 27 HC 2510 2560 0.0796 2.5 ppm 37M6G7D
5 37 27 HC 2510 2560 0.0649 2.5 ppm 38M0W7D
5 38 27 HC 2580 2610 0.0692 2.5 ppm 37M7G7D
5 39 27 HC 2580 2610 0.0541 2.5 ppm 37M5W7D
5 4 27 HC 2506 2680 0.0714 2.5 ppm 37M7G7D
5 41 27 HC 2506 2680 0.0553 2.5 ppm 37M5W7D
5 42 9 HC 824 824 0.2 2.5 ppm 13M4G7D
5 43 9 HC 824 824 0.1581 2.5 ppm 13M5W7D
5 44 27 HC 3460 3540 0.0713 2.5 ppm 17M9G7D
5 45 27 HC 3460 3540 0.0562 2.5 ppm 18M0W7D
5 46 24E HC 1865 1895 0.0942 2.5 ppm 28M6G7D
5 47 24E HC 1865 1895 0.0807 2.5 ppm 28M6W7D
5 48 24E HC 1855 1905 0.0962 2.5 ppm 9M28G7D
5 49 24E HC 1852.5 1907.5 0.0873 2.5 ppm 4M47W7D
5 5 22H HC 836.5 836.5 0.0611 2.5 ppm 23M7G7D
5 51 22H HC 836.5 836.5 0.0478 2.5 ppm 23M7W7D
5 52 22H HC 834 839 0.0614 2.5 ppm 18M9G7D
5 53 22H HC 834 839 0.0489 2.5 ppm 19M0W7D
5 54 27 HC 2525 2545 0.105 2.5 ppm 48M2G7D
5 55 27 HC 2525 2545 0.0773 2.5 ppm 48M3W7D
5 56 27 HC 1732.5 1757.5 0.1194 2.5 ppm 43M1G7D
5 57 27 HC 1732.5 1757.5 0.0971 2.5 ppm 43M2W7D
5 58 27 HC 3500.01 3500.01 0.0783 2.5 ppm 97M2G7D
5 59 27 HC 3500.01 3500.01 0.0622 2.5 ppm 97M3W7D
5 6 27 HC 3475.005 3525 0.0815 2.5 ppm 48M1G7D
5 61 27 HC 3475.005 3525 0.0643 2.5 ppm 48M2W7D
5 62 9 HC 824 824 0.1832 2.5 ppm 18M9G7D
5 63 9 HC 824 824 0.1445 2.5 ppm 18M9W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 15C CC 2402 2480 0.0021
6 2 15C CC HC 2412 2462 0.317
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15E CC HC 5180 5240 0.0625
7 2 15E CC HC 5260 5320 0.07
7 3 15E CC HC 5500 5720 0.0579
7 4 15E CC HC 5745 5825 0.0574

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC