FCC ID: A3LMT6407-77A MMU (MT6407)

by: Samsung Electronics Co Ltd latest update: 2023-06-13 model: MT6407-77A

Three grants have been issued under this FCC ID from 12/09/2020 to 06/13/2023 (this is one of four hundred and eighteen releases in 2023 for this grantee). Public details available include internal & external photos, frequency information, and manuals. some products also feature user submitted or linked warrantee terms, instructions, password defaults, troubleshooting guides, & drivers.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 External Photos External Photos pdf 401.65 KiB December 09 2020
1 2 3 Label Info ID Label/Location Info pdf 222.36 KiB December 09 2020
1 2 3 Attestation Letter (Covered List) Attestation Statements pdf 64.12 KiB June 13 2023
1 2 3 Attestation Letter (US Agent Designation) Attestation Statements pdf 534.71 KiB June 13 2023
1 2 3 Authorization Letter (Jenni Chun) Cover Letter(s) pdf 220.36 KiB June 13 2023
1 2 3 Authorization Letter (Jongin Kim) Cover Letter(s) pdf 401.09 KiB June 13 2023
1 2 3 C2PC Letter Cover Letter(s) pdf 437.13 KiB June 13 2023
1 2 3 Confidentiality Request Letter Cover Letter(s) pdf 367.50 KiB June 13 2023
1 2 3 Operational Description Operational Description pdf June 13 2023 confidential
1 2 3 RF Exposure Info RF Exposure Info pdf 417.03 KiB June 13 2023
1 2 3 Test Report Test Report pdf 5.62 MiB June 13 2023
1 2 3 Test Setup Photo Test Setup Photos pdf 1.09 MiB June 13 2023 / December 10 2023 delayed release
1 2 3 Authorization Letter Cover Letter(s) pdf 90.54 KiB December 09 2020
1 2 3 Block Diagram Block Diagram pdf December 08 2020 confidential
1 2 3 Confidentiality Letter Cover Letter(s) pdf 107.31 KiB December 09 2020
1 2 3 Internal Photos Internal Photos pdf December 08 2020 confidential
1 2 3 Power of Attorney Letter Cover Letter(s) pdf 73.42 KiB December 09 2020
1 2 3 Parts List Parts List/Tune Up Info pdf December 08 2020 confidential
1 2 3 Request for LTC Letter Cover Letter(s) pdf 178.69 KiB December 09 2020
1 2 3 Schematics Pt 1 Schematics pdf December 08 2020 confidential
1 2 3 Schematics Pt 2 Schematics pdf December 08 2020 confidential
1 2 3 Schematics Pt 3 (1) Part 1 Schematics pdf December 08 2020 confidential
1 2 3 Schematics Pt 3 (1) Part 2 Schematics pdf December 08 2020 confidential
1 2 3 Schematics Pt 4 Schematics pdf December 08 2020 confidential
1 2 3 Schematics Pt 5 Schematics pdf December 09 2020 confidential
1 2 3 Schematics Pt 6 Schematics pdf December 09 2020 confidential
1 2 3 Schematics Pt 7 Schematics pdf December 09 2020 confidential
1 2 3 Test Report 1 Part 1 Test Report pdf 5.47 MiB December 09 2020
1 2 3 Test Report 1 Part 2 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 1 Part 3 Test Report pdf 5.46 MiB December 09 2020
1 2 3 Test Report 1 Part 4 Test Report pdf 5.49 MiB December 09 2020
1 2 3 Test Report 1 Part 5 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 1 Part 6 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 1 Part 7 Test Report pdf 1.52 MiB December 09 2020
1 2 3 Test Report 2 Part 1 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 2 Part 2 Test Report pdf 5.47 MiB December 09 2020
1 2 3 Test Report 2 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 2 Part 4 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 2 Part 5 Test Report pdf 5.46 MiB December 09 2020
1 2 3 Test Report 2 Part 6 Test Report pdf 5.45 MiB December 09 2020
1 2 3 Test Report 2 Part 7 Test Report pdf 3.34 MiB December 09 2020
1 2 3 Test Report 3 Part 1 Test Report pdf 5.44 MiB December 09 2020
1 2 3 Test Report 3 Part 2 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 3 Part 3 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 3 Part 4 Test Report pdf 5.50 MiB December 09 2020
1 2 3 Test Report 3 Part 5 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 3 Part 6 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 3 Part 7 Test Report pdf 1.45 MiB December 09 2020
1 2 3 Test Report 4 Part 1 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 4 Part 2 Test Report pdf 5.49 MiB December 09 2020
1 2 3 Test Report 4 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 4 Part 4 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 4 Part 5 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 4 Part 6 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 4 Part 7 Test Report pdf 5.45 MiB December 09 2020
1 2 3 Test Report 4 Part 8 Test Report pdf 3.98 MiB December 09 2020
1 2 3 Test Report 5 Part 1 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 5 Part 10 Test Report pdf 4.13 MiB December 09 2020
1 2 3 Test Report 5 Part 2 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 4 Test Report pdf 5.46 MiB December 09 2020
1 2 3 Test Report 5 Part 5 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 6 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 5 Part 7 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 8 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 5 Part 9 Test Report pdf 5.38 MiB December 09 2020
1 2 3 Test Report 6 Part 1 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 6 Part 2 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 6 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 6 Part 4 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 6 Part 5 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 6 Part 6 Test Report pdf 5.35 MiB December 09 2020
1 2 3 Test Report 6 Part 7 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 6 Part 8 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 6 Part 9 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 7 Part 1 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 7 Part 2 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 7 Part 3 Test Report pdf 5.44 MiB December 09 2020
1 2 3 Test Report 7 Part 4 Test Report pdf 5.44 MiB December 09 2020
1 2 3 Test Report 7 Part 5 Test Report pdf 4.63 MiB December 09 2020
1 2 3 Test Setup Photos Test Setup Photos pdf 343.62 KiB December 09 2020
1 2 3 Tune Up Procedure Parts List/Tune Up Info pdf December 08 2020 confidential
1 2 3 User Manual 1 Users Manual pdf December 08 2020 confidential
1 2 3 User Manual 2 Users Manual pdf December 08 2020 confidential
1 2 3 User Manual NDA Users Manual pdf December 08 2020 confidential
1 2 3 External Photos External Photos pdf 401.65 KiB December 09 2020
1 2 3 Label Info ID Label/Location Info pdf 222.36 KiB December 09 2020
1 2 3 Attestation Letter (Covered List) Attestation Statements pdf 64.12 KiB June 13 2023
1 2 3 Attestation Letter (US Agent Designation) Attestation Statements pdf 534.71 KiB June 13 2023
1 2 3 Authorization Letter (Jenni Chun) Cover Letter(s) pdf 220.36 KiB June 13 2023
1 2 3 Authorization Letter (Jongin Kim) Cover Letter(s) pdf 401.09 KiB June 13 2023
1 2 3 C2PC Letter Cover Letter(s) pdf 437.13 KiB June 13 2023
1 2 3 Confidentiality Request Letter Cover Letter(s) pdf 367.50 KiB June 13 2023
1 2 3 RF Exposure Info RF Exposure Info pdf 417.03 KiB June 13 2023
1 2 3 Test Report Test Report pdf 5.62 MiB June 13 2023
1 2 3 Test Setup Photo Test Setup Photos pdf 1.09 MiB June 13 2023 / December 10 2023 delayed release
1 2 3 Authorization Letter Cover Letter(s) pdf 90.54 KiB December 09 2020
1 2 3 Confidentiality Letter Cover Letter(s) pdf 107.31 KiB December 09 2020
1 2 3 Power of Attorney Letter Cover Letter(s) pdf 73.42 KiB December 09 2020
1 2 3 Request for LTC Letter Cover Letter(s) pdf 178.69 KiB December 09 2020
1 2 3 Test Report 1 Part 1 Test Report pdf 5.47 MiB December 09 2020
1 2 3 Test Report 1 Part 2 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 1 Part 3 Test Report pdf 5.46 MiB December 09 2020
1 2 3 Test Report 1 Part 4 Test Report pdf 5.49 MiB December 09 2020
1 2 3 Test Report 1 Part 5 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 1 Part 6 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 1 Part 7 Test Report pdf 1.52 MiB December 09 2020
1 2 3 Test Report 2 Part 1 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 2 Part 2 Test Report pdf 5.47 MiB December 09 2020
1 2 3 Test Report 2 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 2 Part 4 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 2 Part 5 Test Report pdf 5.46 MiB December 09 2020
1 2 3 Test Report 2 Part 6 Test Report pdf 5.45 MiB December 09 2020
1 2 3 Test Report 2 Part 7 Test Report pdf 3.34 MiB December 09 2020
1 2 3 Test Report 3 Part 1 Test Report pdf 5.44 MiB December 09 2020
1 2 3 Test Report 3 Part 2 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 3 Part 3 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 3 Part 4 Test Report pdf 5.50 MiB December 09 2020
1 2 3 Test Report 3 Part 5 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 3 Part 6 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 3 Part 7 Test Report pdf 1.45 MiB December 09 2020
1 2 3 Test Report 4 Part 1 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 4 Part 2 Test Report pdf 5.49 MiB December 09 2020
1 2 3 Test Report 4 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 4 Part 4 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 4 Part 5 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 4 Part 6 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 4 Part 7 Test Report pdf 5.45 MiB December 09 2020
1 2 3 Test Report 4 Part 8 Test Report pdf 3.98 MiB December 09 2020
1 2 3 Test Report 5 Part 1 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 5 Part 10 Test Report pdf 4.13 MiB December 09 2020
1 2 3 Test Report 5 Part 2 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 4 Test Report pdf 5.46 MiB December 09 2020
1 2 3 Test Report 5 Part 5 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 6 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 5 Part 7 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 5 Part 8 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 5 Part 9 Test Report pdf 5.38 MiB December 09 2020
1 2 3 Test Report 6 Part 1 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 6 Part 2 Test Report pdf 5.42 MiB December 09 2020
1 2 3 Test Report 6 Part 3 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 6 Part 4 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 6 Part 5 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 6 Part 6 Test Report pdf 5.35 MiB December 09 2020
1 2 3 Test Report 6 Part 7 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 6 Part 8 Test Report pdf 5.48 MiB December 09 2020
1 2 3 Test Report 6 Part 9 Test Report pdf 5.40 MiB December 09 2020
1 2 3 Test Report 7 Part 1 Test Report pdf 5.43 MiB December 09 2020
1 2 3 Test Report 7 Part 2 Test Report pdf 5.41 MiB December 09 2020
1 2 3 Test Report 7 Part 3 Test Report pdf 5.44 MiB December 09 2020
1 2 3 Test Report 7 Part 4 Test Report pdf 5.44 MiB December 09 2020
1 2 3 Test Report 7 Part 5 Test Report pdf 4.63 MiB December 09 2020
1 2 3 Test Setup Photos Test Setup Photos pdf 343.62 KiB December 09 2020

frequency equipment class purpose
1 2023-06-13 3700 ~ 3980 TNB - Licensed Non-Broadcast Station Transmitter Class II permissive change or modification of presently authorized equipment
2 2021-12-13 3700 ~ 3980 TNB - Licensed Non-Broadcast Station Transmitter Class II Permissive Change
3 2020-12-09 3700 ~ 3980 TNB - Licensed Non-Broadcast Station Transmitter Original Equipment

Application Forms

app s Applicant Information
1 2 3 Effective 2023-06-13
1 2 3 2021-12-13
1 2 3 2020-12-09
1 2 3 Applicant's complete, legal business name Samsung Electronics Co Ltd
1 2 3 FCC Registration Number (FRN) 0005810205
1 2 3 0027908797
1 2 3 Physical Address 19 Chapin Rd., Building D
1 2 3 Pine Brook, New Jersey 07058
1 2 3 Pine Brook, NJ
1 2 3 Pine Brook
1 2 3 United States
app s TCB Information
1 2 3 TCB Application Email Address T******@hctamerica.com
1 2 3 T******@TIMCOENGR.COM
1 2 3 TCB Scope B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 B4: Microwave, Millimeter Wave Band and Citizens Broadband Radio Services equipment in 47 CFR Parts 25, 30, 74, 90, 95, 96, 97, 101 (all above 3 GHz)
app s FCC ID
1 2 3 Grantee Code A3L
1 2 3 Equipment Product Code MT6407-77A
app s Person at the applicant's address to receive grant or for contact
1 2 3 Name J**** C****
1 2 3 Title General Manager
1 2 3 Telephone Number 973-8********
1 2 3 Fax Number 973-8********
1 2 3 E-mail j******@samsung.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 No
1 2 3 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)12/10/2023
1 2 3 06/11/2022
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 Is this application for software defined/cognitive radio authorization?No
1 2 3 Equipment ClassTNB - Licensed Non-Broadcast Station Transmitter
1 2 3 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)MMU (MT6407)
1 2 3 MMU(MT6407)
1 2 3 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 Modular Equipment TypeDoes not apply
1 2 3 Purpose / Application is forClass II permissive change or modification of presently authorized equipment
1 2 3 Class II Permissive Change
1 2 3 Original Equipment
1 2 3 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?No
1 2 3 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 Grant CommentsClass II Permissive Change to add NR Single Carrier 20/40/80 MHz Channel Bandwidth and NR Multi-Carrier by software. Power listed is maximum conducted output power. Professional installation is required. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC bureau(s), including antenna co-location requirement of 1.1307(b)(3). End-users and installers must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device was tested for QPSK, 16QAM, 64QAM, and 256QAM modulation. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 Class II Permissive Change to add 60 MHz Channel Bandwidth operation by software. Power listed is maximum conducted output power. Professional installation is required. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC bureau(s), including antenna co-location requirement of 1.1307(b)(3). End-users and installers must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device was tested for QPSK, 16QAM, 64QAM, and 256QAM modulation. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 Power listed is maximum conducted output power. Professional installation is required. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC bureau(s), including antenna co-location requirement of 1.1307(b)(3). End-users and installers must be provided with installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device was tested for QPSK, 16QAM, 64QAM, and 256QAM modulation type. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 Is there an equipment authorization waiver associated with this application?No
1 2 3 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 Firm Name HCT Co., Ltd.
1 2 3 CTK Co., Ltd.
1 2 3 Name L******** Y****
1 2 3 P**** Y********
1 2 3 Telephone Number 82-31********
1 2 3 82-31********
1 2 3 Fax Number 82-31********
1 2 3 82-31********
1 2 3 E-mail y******@hct.co.kr
1 2 3 j******@e-ctk.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 27 MO 3700 3980 209.99 0.001 ppm 196MG7D
1 2 27 MO 3700 3980 213.78 0.001 ppm 196MW7D
1 3 27 MO 3700 3980 205.94 0.001 ppm 97M6G7D
1 4 27 MO 3700 3980 210.47 0.001 ppm 97M6W7D
1 5 27 MO 3700 3980 222.69 0.001 ppm 58M2G7D
1 6 27 MO 3700 3980 214.85 0.001 ppm 58M4W7D
1 7 27 MO 3700 3980 104.19 0.001 ppm 18M4G7D
1 8 27 MO 3700 3980 105.67 0.001 ppm 18M4W7D
1 9 27 MO 3700 3980 168.7 0.001 ppm 38M0G7D
1 1 27 MO 3700 3980 170.88 0.001 ppm 38M1W7D
1 11 27 MO 3700 3980 204.49 0.001 ppm 77M5G7D
1 12 27 MO 3700 3980 211.13 0.001 ppm 77M7W7D
1 13 27 MO 3700 3980 214.08 0.001 ppm 137MG7D
1 14 27 MO 3700 3980 215.98 0.001 ppm 137MW7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 27 MO 3700 3980 209.99 0.001 ppm 196MG7D
2 2 27 MO 3700 3980 213.78 0.001 ppm 196MW7D
2 3 27 MO 3700 3980 205.94 0.001 ppm 97M6G7D
2 4 27 MO 3700 3980 210.47 0.001 ppm 97M6W7D
2 5 27 MO 3700 3980 222.69 0.001 ppm 58M2G7D
2 6 27 MO 3700 3980 214.85 0.001 ppm 58M4W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 27 MO 3700 3980 209.99 0.001 ppm 196MG7D
3 2 27 MO 3700 3980 213.78 0.001 ppm 196MW7D

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC