FCC ID: A3LSMG781V Mobile Phone

by: Samsung Electronics Co Ltd latest update: 2020-09-22 model: SMG781V

Nine grants have been issued under this FCC ID on 09/22/2020 (this is one of seven hundred and seventy-two releases in 2020 for this grantee). Public details available include frequency information, internal & external photos, and manuals. some products also feature user submitted or linked instructions, troubleshooting guides, warrantee terms, password defaults, & drivers.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 8 9 User Manual Part1 Rev.1 Users Manual pdf 3.85 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 User Manual Phone-HSGuide Users Manual pdf 895.33 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 INTERNAL PHOTO Internal Photos pdf 423.16 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 EXTERNAL PHOTO External Photos pdf 139.94 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 E-Label Attestation Letter ID Label/Location Info pdf 724.27 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 E-label and Location ID Label/Location Info pdf 599.96 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Ant Distance 200825 Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Antenna specification LDS Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Antenna specification Metal Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Authorization Letter Cover Letter(s) pdf 2.11 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Block Diagram Rev.1 Block Diagram pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Circuit Diagram Schematics pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Operational Description MST Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Operational Description Main 200903 Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Operational Description NFC Rev.1 Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Part List Parts List/Tune Up Info pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Request for confidentiality letter Cover Letter(s) pdf 1.77 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Annex A RF Test Setup Photo Unlicensed Part1 Test Setup Photos pdf 2.98 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V Annex A RF Test Setup Photo Unlicensed Part2 Test Setup Photos pdf 2.99 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V NFC TEST REPORT Test Report pdf 2.71 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 HAC MIF Letter Cover Letter(s) pdf 111.54 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Operational Description WLAN 0821 Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Part 0 SAR Test Report R1 RF Exposure Info pdf 1.49 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 1 of 6 R1 RF Exposure Info pdf 4.35 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 2 of 6 R1 RF Exposure Info pdf 3.17 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 3 of 6 RF Exposure Info pdf 4.99 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 4 of 6 RF Exposure Info pdf 4.23 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 5 of 6 RF Exposure Info pdf 2.91 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 6 of 6 RF Exposure Info pdf 3.54 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 RF EMISSION Report R2 Test Report pdf 4.97 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 RF EMISSION Setup Photos Test Setup Photos pdf 239.10 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SAR Setup Photos Test Setup Photos pdf 689.98 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 T-Coil Report R1 Test Report pdf 4.26 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 T-Coil Setup Photos Test Setup Photos pdf 220.92 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 Tune-up procedure BTWIFI 0903 Parts List/Tune Up Info pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 U-NII Device SW Security Statement Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 SM-G781V [5GHz] 802.11ax Plot Annex B Test Report pdf 4.96 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V DFS TEST REPORT R1 Test Report pdf 963.62 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V UNII ax TEST REPORT Test Report pdf 2.21 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V UNII TEST REPORT Part1 Test Report pdf 4.46 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V UNII TEST REPORT Part2 Test Report pdf 3.68 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 HCT-EM-2008-FC006-P SAMSUNG SM-G781V EMI Test Setup Photo CXX Test Setup Photos pdf 1.19 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 LBE20200759 SM-G781V EMI Test Report FCC Cer Issue01 JBP Test Report pdf 1.92 MiB September 10 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 LBE20200759 SM-G781V EMI Test Setup Photo Appendix FCC Cer JBP Test Setup Photos pdf 912.05 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 Test Report pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Operational Description ENDC Sub6 Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Part 0 Power Density Char Report RF Exposure Info pdf 1.29 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 Power Density Test Report RF Exposure Info pdf 2.77 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 Power Density Setup Photos Test Setup Photos pdf 131.65 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 Power Density Simulation Report Rev.A R1 RF Exposure Info pdf 4.55 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Tune-Up Procedure mmWave 200825 Parts List/Tune Up Info pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 mmWave Antenna Approval sheet QTM535-5 RevC Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part1 Test Report pdf 5.65 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part2 Test Report pdf 5.77 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part3 Test Report pdf 5.69 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part4 Test Report pdf 4.91 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part5 Test Report pdf 4.94 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Report pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Report pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Report pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Report pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Report pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Operational Description Bluetooth Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 SM-G781V BT TEST REPORT Part1 Test Report pdf 3.71 MiB September 10 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V BT TEST REPORT Part2 Test Report pdf 4.31 MiB September 10 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 LTE Attestation letter Cover Letter(s) pdf 125.49 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 LTE Release 10 Checklist 0826 Operational Description pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 Tune-up procedure Main 200903 Parts List/Tune Up Info pdf September 09 2020 confidential
1 2 3 4 5 6 7 8 9 SM-G781V 2G3G TEST REPORT Rev.01 Part1 Test Report pdf 5.41 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V 2G3G TEST REPORT Rev.01 Part2 Test Report pdf 732.46 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B12 TEST REPORT Test Report pdf 3.28 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B13 TEST REPORT Test Report pdf 1.69 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B14 TEST REPORT Test Report pdf 1.89 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B25[2] TEST REPORT Part1 Test Report pdf 5.38 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B25[2] TEST REPORT Part2 Test Report pdf 993.82 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B26[5] TEST REPORT Test Report pdf 3.68 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B26[90] TEST REPORT Test Report pdf 4.11 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B30 TEST REPORT Part1 Test Report pdf 5.41 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B30 TEST REPORT Part2 Test Report pdf 1.64 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B40 TEST REPORT Part1 Test Report pdf 5.67 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B40 TEST REPORT Part2 Test Report pdf 3.76 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B40 TEST REPORT Part3 Test Report pdf 3.96 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B41 TEST REPORT Test Report pdf 4.77 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B66[4] TEST REPORT Part1 Test Report pdf 5.41 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B66[4] TEST REPORT Part2 Test Report pdf 937.71 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B71 TEST REPORT Test Report pdf 3.10 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B7 TEST REPORT Test Report pdf 4.40 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n25 TEST REPORT Test Report pdf 5.09 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n41 TEST REPORT Part1 Test Report pdf 5.44 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n41 TEST REPORT Part2 Test Report pdf 3.80 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n5 TEST REPORT Test Report pdf 3.45 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n66 TEST REPORT Test Report pdf 5.08 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n71 TEST REPORT Test Report pdf 3.89 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 HCT-EM-2008-FC006-R1 SAMSUNG SM-G781V EMI Report CXX Test Report pdf 1.19 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 WPC RF Exposure Report RF Exposure Info pdf 548.30 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 WPC RF Exposure Setup Photos Test Setup Photos pdf 422.18 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V WPT TEST REPORT Test Report pdf 3.14 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 User Manual Part1 Rev.1 Users Manual pdf 3.85 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 User Manual Phone-HSGuide Users Manual pdf 895.33 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 INTERNAL PHOTO Internal Photos pdf 423.16 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 EXTERNAL PHOTO External Photos pdf 139.94 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 E-Label Attestation Letter ID Label/Location Info pdf 724.27 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 E-label and Location ID Label/Location Info pdf 599.96 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Authorization Letter Cover Letter(s) pdf 2.11 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Request for confidentiality letter Cover Letter(s) pdf 1.77 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Annex A RF Test Setup Photo Unlicensed Part1 Test Setup Photos pdf 2.98 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V Annex A RF Test Setup Photo Unlicensed Part2 Test Setup Photos pdf 2.99 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V NFC TEST REPORT Test Report pdf 2.71 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 HAC MIF Letter Cover Letter(s) pdf 111.54 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 0 SAR Test Report R1 RF Exposure Info pdf 1.49 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 1 of 6 R1 RF Exposure Info pdf 4.35 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 2 of 6 R1 RF Exposure Info pdf 3.17 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 3 of 6 RF Exposure Info pdf 4.99 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 4 of 6 RF Exposure Info pdf 4.23 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 5 of 6 RF Exposure Info pdf 2.91 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 SAR Report 6 of 6 RF Exposure Info pdf 3.54 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 RF EMISSION Report R2 Test Report pdf 4.97 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 RF EMISSION Setup Photos Test Setup Photos pdf 239.10 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SAR Setup Photos Test Setup Photos pdf 689.98 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 T-Coil Report R1 Test Report pdf 4.26 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 T-Coil Setup Photos Test Setup Photos pdf 220.92 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V [5GHz] 802.11ax Plot Annex B Test Report pdf 4.96 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V DFS TEST REPORT R1 Test Report pdf 963.62 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V UNII ax TEST REPORT Test Report pdf 2.21 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V UNII TEST REPORT Part1 Test Report pdf 4.46 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V UNII TEST REPORT Part2 Test Report pdf 3.68 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 HCT-EM-2008-FC006-P SAMSUNG SM-G781V EMI Test Setup Photo CXX Test Setup Photos pdf 1.19 MiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 LBE20200759 SM-G781V EMI Test Report FCC Cer Issue01 JBP Test Report pdf 1.92 MiB September 10 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 LBE20200759 SM-G781V EMI Test Setup Photo Appendix FCC Cer JBP Test Setup Photos pdf 912.05 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 Part 0 Power Density Char Report RF Exposure Info pdf 1.29 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 Power Density Test Report RF Exposure Info pdf 2.77 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Part 1 Power Density Setup Photos Test Setup Photos pdf 131.65 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 Power Density Simulation Report Rev.A R1 RF Exposure Info pdf 4.55 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part1 Test Report pdf 5.65 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part2 Test Report pdf 5.77 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part3 Test Report pdf 5.69 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part4 Test Report pdf 4.91 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V mmWave Test Report R1 part5 Test Report pdf 4.94 MiB September 16 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V BT TEST REPORT Part1 Test Report pdf 3.71 MiB September 10 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V BT TEST REPORT Part2 Test Report pdf 4.31 MiB September 10 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 LTE Attestation letter Cover Letter(s) pdf 125.49 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V 2G3G TEST REPORT Rev.01 Part1 Test Report pdf 5.41 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V 2G3G TEST REPORT Rev.01 Part2 Test Report pdf 732.46 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B12 TEST REPORT Test Report pdf 3.28 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B13 TEST REPORT Test Report pdf 1.69 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B14 TEST REPORT Test Report pdf 1.89 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B25[2] TEST REPORT Part1 Test Report pdf 5.38 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B25[2] TEST REPORT Part2 Test Report pdf 993.82 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B26[5] TEST REPORT Test Report pdf 3.68 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B26[90] TEST REPORT Test Report pdf 4.11 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B30 TEST REPORT Part1 Test Report pdf 5.41 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B30 TEST REPORT Part2 Test Report pdf 1.64 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B40 TEST REPORT Part1 Test Report pdf 5.67 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B40 TEST REPORT Part2 Test Report pdf 3.76 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B40 TEST REPORT Part3 Test Report pdf 3.96 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B41 TEST REPORT Test Report pdf 4.77 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B66[4] TEST REPORT Part1 Test Report pdf 5.41 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B66[4] TEST REPORT Part2 Test Report pdf 937.71 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B71 TEST REPORT Test Report pdf 3.10 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V LTE B7 TEST REPORT Test Report pdf 4.40 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n25 TEST REPORT Test Report pdf 5.09 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n41 TEST REPORT Part1 Test Report pdf 5.44 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n41 TEST REPORT Part2 Test Report pdf 3.80 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n5 TEST REPORT Test Report pdf 3.45 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n66 TEST REPORT Test Report pdf 5.08 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 SM-G781V Sub6 n71 TEST REPORT Test Report pdf 3.89 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 HCT-EM-2008-FC006-R1 SAMSUNG SM-G781V EMI Report CXX Test Report pdf 1.19 MiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 WPC RF Exposure Report RF Exposure Info pdf 548.30 KiB September 09 2020 / September 22 2020
1 2 3 4 5 6 7 8 9 WPC RF Exposure Setup Photos Test Setup Photos pdf 422.18 KiB September 09 2020 / March 21 2021 delayed release
1 2 3 4 5 6 7 8 9 SM-G781V WPT TEST REPORT Test Report pdf 3.14 MiB September 09 2020 / September 22 2020

frequency equipment class purpose
1 2020-09-22 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter Original Equipment
2 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
3 JBP - Part 15 Class B Computing Device Peripheral
4 37000 ~ 40000 5GM - Part 30 Mobile Transmitter
5 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
6 2546.01 ~ 2640 PCE - PCS Licensed Transmitter held to ear
7 851 ~ 940 CXX - Communications Rcvr for use w/ licensed Tx and CBs
8 0.11 ~ 0.148 DCD - Part 15 Low Power Transmitter Below 1705 kHz
9 2412 ~ 2472 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 8 9 Effective 2020-09-22
1 2 3 4 5 6 7 8 9 Applicant's complete, legal business name Samsung Electronics Co Ltd
1 2 3 4 5 6 7 8 9 FCC Registration Number (FRN) 0005810205
1 2 3 4 5 6 7 8 9 Physical Address 19 Chapin Rd., Building D
1 2 3 4 5 6 7 8 9 Pine Brook
1 2 3 4 5 6 7 8 9 United States
app s TCB Information
1 2 3 4 5 6 7 8 9 TCB Application Email Address L******@ul.com
1 2 3 4 5 6 7 8 9 TCB Scope A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 7 8 9 A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 8 9 B4: Microwave, Millimeter Wave Band and Citizens Broadband Radio Services equipment in 47 CFR Parts 25, 30, 74, 90, 95, 96, 97, 101 (all above 3 GHz)
1 2 3 4 5 6 7 8 9 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
app s FCC ID
1 2 3 4 5 6 7 8 9 Grantee Code A3L
1 2 3 4 5 6 7 8 9 Equipment Product Code SMG781V
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 8 9 Name J**** C********
1 2 3 4 5 6 7 8 9 Title General Manager
1 2 3 4 5 6 7 8 9 Telephone Number 973-8********
1 2 3 4 5 6 7 8 9 Fax Number 973-8********
1 2 3 4 5 6 7 8 9 E-mail j******@samsung.com
app s Technical Contact
1 2 3 4 5 6 7 8 9 Firm Name HCT Co., Ltd.
1 2 3 4 5 6 7 8 9 Name S**** K******
1 2 3 4 5 6 7 8 9 Physical Address 74, Seoicheon-ro 578beon-gil, Majang-myeon
1 2 3 4 5 6 7 8 9 Gyunggi-do, 17383
1 2 3 4 5 6 7 8 9 South Korea
1 2 3 4 5 6 7 8 9 Telephone Number 03164********
1 2 3 4 5 6 7 8 9 Fax Number 82-31********
1 2 3 4 5 6 7 8 9 E-mail a******@hct.co.kr
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 8 9 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 9 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 9 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)03/21/2021
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 8 9 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 8 9 Equipment ClassDXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 8 9 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 8 9 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 7 8 9 5GM - Part 30 Mobile Transmitter
1 2 3 4 5 6 7 8 9 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 8 9 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 8 9 CXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 7 8 9 DCD - Part 15 Low Power Transmitter Below 1705 kHz
1 2 3 4 5 6 7 8 9 DTS - Digital Transmission System
1 2 3 4 5 6 7 8 9 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Mobile Phone
1 2 3 4 5 6 7 8 9 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 8 9 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 8 9 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 8 9 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 8 9 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 8 9 Grant CommentsOutput power is conducted. 802.11 supports 20MHz, 40MHz, and 80MHz channel bandwidths. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters, or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. The highest reported SAR for the head, body-worn accessory, wireless router (hotspot), product-specific (phablet-10g), and simultaneous transmission (1g and phablet-10g) use conditions are 0.39 W/kg, 0.19 W/kg, 0.36 W/kg, 1.81 W/kg (10g), 1.59 W/kg, and 3.71 W/kg (10g), respectively. HAC Rating: M4/T3-2011
1 2 3 4 5 6 7 8 9 Output power listed is EIRP. This device supports bandwidths of 50 and 100 MHz for NR bands n261/n260.
1 2 3 4 5 6 7 8 9 Output power is conducted. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters, or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. The highest reported SAR for the head, body-worn accessory, wireless router (hotspot), and simultaneous transmission use conditions are 0.17 W/kg, <0.10 W/kg, 0.29 W/kg, and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 9 Output power is conducted for Part 90S, ERP for all other bands below 1GHz, and EIRP for bands above 1GHz. This device supports the following LTE bands and channel bandwidths: Band 13, Band 14, Band 30, and Band 40 (5/10 MHz); Band 7, Band 38, Band 41, and Band 71 (5/10/15/20 MHz); Band 5 and Band 12 (1.4/3/5/10 MHz); Band 26 (1.4/3/5/10/15 MHz); Band 2, Band 4, Band 25, and Band 66 (1.4/3/5/10/15/20 MHz ); Band n41 (20/40/50/60/80/90/100 MHz); Bands n2, n5, n25, n66, and n71 (5/10/15/20 MHz); Support is limited to non-standalone operations only. For LTE/5GNR the line entries are the highest measured total power and widest bandwidth within each band for each emissions designator (G7D for QPSK, W7D for QAM) for single carrier LTE/5GNR operations. In addition the listing includes the widest bandwidth for each band that supports intra-band carrier aggregation. This device contains functions that are not operational in the U.S. and its Territories; filings under this FCC ID are approved only for US operations. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters, or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. The highest reported SAR for the head, body-worn accessory, wireless router (hotspot), product-specific (phablet-10g), and simultaneous transmission (1g and phablet-10g), product-specific (phablet) use conditions are 0.28 W/kg, 1.11 W/kg, 1.07 W/kg, 1.93 W/kg (10g), 1.59 W/kg, and 3.71 W/kg (10g), respectively. HAC Rating: M4/T3-2011
1 2 3 4 5 6 7 8 9 Output power is conducted. Bluetooth LE supports 125kb/s, 500kb/s, 1Mb/s, and 2Mb/s. 802.11 supports 20MHz channel bandwidth. For satisfying FCC RF exposure compliance requirements, body-worn operations are restricted to belt-clips, holsters, or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. The highest reported SAR for the head, body-worn accessory, wireless router (hotspot), and simultaneous transmission use conditions are 0.58 W/kg, 0.27 W/kg, 0.67 W/kg, and 1.59 W/kg, respectively. HAC Rating: M4/T3-2011
1 2 3 4 5 6 7 8 9 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 8 9 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 8 9 Firm Name HCT Co., Ltd.
1 2 3 4 5 6 7 8 9 Name L**** Y********
1 2 3 4 5 6 7 8 9 Telephone Number 82-31********
1 2 3 4 5 6 7 8 9 Fax Number 82-31********
1 2 3 4 5 6 7 8 9 E-mail y******@hct.co.kr
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15C CC 13.56000000 13.56000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC HC MO 5180 5240 0.092
2 2 15E CC HC MO 5260 5320 0.097
2 3 15E CC HC MO 5500 5720 0.095
2 4 15E CC HC MO 5745 5825 0.093
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 3 27500 28350 0.122 2.5 ppm 191MG7D
4 2 3 27500 28350 0.095 2.5 ppm 191MW7D
4 3 3 27500 28350 0.179 2.5 ppm 45M9G7D
4 4 3 27500 28350 0.187 2.5 ppm 45M4W7D
4 5 3 37000 40000 0.083 2.5 ppm 192MG7D
4 6 3 37000 40000 0.085 2.5 ppm 190MG7D
4 7 3 37000 40000 0.054 2.5 ppm 192MW7D
4 8 3 37000 40000 0.099 2.5 ppm 93M4G7D
4 9 3 37000 40000 0.097 2.5 ppm 90M6W7D
4 1 3 37000 40000 0.126 2.5 ppm 45M5G7D
4 11 3 37000 40000 0.11 2.5 ppm 45M8W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15C CC 2402.00000000 2480.00000000 0.0600000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 22H HC 824.2 848.8 0.357 2.5 ppm 248KGXW
6 2 22H HC 824.2 848.8 0.097 2.5 ppm 252KG7W
6 3 22H HC 826.4 846.6 0.054 2.5 ppm 4M17F9W
6 4 9 HC 817.9 823.1 0.314 2.5 ppm 1M27F9W
6 5 22H HC 824.7 848.31 0.066 2.5 ppm 1M27F9W
6 6 24E HC 1850.2 1909.8 0.473 2.5 ppm 248KGXW
6 7 24E HC 1850.2 1909.8 0.145 2.5 ppm 245KG7W
6 8 24E HC 1852.4 1907.6 0.142 2.5 ppm 4M17F9W
6 9 27 HC 1712.4 1752.6 0.151 2.5 ppm 4M15F9W
6 1 24E HC 1851.3 1908.8 0.141 2.5 ppm 1M28F9W
6 11 27 HC 2510 2560 0.141 2.5 ppm 18M0G7D
6 12 27 HC 2510 2560 0.117 2.5 ppm 18M0W7D
6 13 27 HC 704 711 0.11 2.5 ppm 8M96G7D
6 14 27 HC 704 711 0.093 2.5 ppm 8M97W7D
6 15 27 HC 700.5 714.5 0.112 2.5 ppm 2M71G7D
6 16 27 HC 700.5 714.5 0.094 2.5 ppm 2M70W7D
6 17 27 HC 782 782 0.141 2.5 ppm 8M96G7D
6 18 27 HC 782 782 0.12 2.5 ppm 8M96W7D
6 19 9 HC 793 793 0.119 2.5 ppm 8M97G7D
6 2 9 HC 793 793 0.103 2.5 ppm 8M96W7D
6 21 24E HC 1860 1905 0.139 2.5 ppm 17M9G7D
6 22 24E HC 1860 1905 0.119 2.5 ppm 17M9W7D
6 23 24E HC 1851.5 1913.5 0.155 2.5 ppm 2M71G7D
6 24 24E HC 1851.5 1913.5 0.133 2.5 ppm 2M70W7D
6 25 22H HC 831.5 841.5 0.06 2.5 ppm 13M4G7D
6 26 22H HC 831.5 841.5 0.051 2.5 ppm 13M5W7D
6 27 22H HC 824.7 848.3 0.062 2.5 ppm 1M09G7D
6 28 22H HC 824.7 848.3 0.053 2.5 ppm 1M09W7D
6 29 9 HC 821.5 821.5 0.276 2.5 ppm 13M4G7D
6 3 9 HC 821.5 821.5 0.236 2.5 ppm 13M4W7D
6 31 9 HC 816.5 821.5 0.284 2.5 ppm 4M51G7D
6 32 9 HC 819 819 0.245 2.5 ppm 8M97W7D
6 33 27 HC 2310 2310 0.157 2.5 ppm 8M94G7D
6 34 27 HC 2310 2310 0.133 2.5 ppm 8M97W7D
6 35 27 HC 2307.5 2312.5 0.17 2.5 ppm 4M52G7D
6 36 27 HC 2310 2310 0.005 2.5 ppm 8M95G7D
6 37 27 HC 2310 2310 0.004 2.5 ppm 8M96W7D
6 38 27 HC 2506 2680 0.228 2.5 ppm 17M9G7D
6 39 27 HC 2506 2680 0.193 2.5 ppm 17M9W7D
6 4 27 HC 2501 2685 0.237 2.5 ppm 8M96G7D
6 41 27 HC 2501 2685 0.198 2.5 ppm 8M98W7D
6 42 27 HC 1720 1770 0.219 2.5 ppm 17M9G7D
6 43 27 HC 1720 1770 0.188 2.5 ppm 17M9W7D
6 44 27 HC 1711.5 1778.5 0.242 2.5 ppm 2M71G7D
6 45 27 HC 1711.5 1778.5 0.206 2.5 ppm 2M70W7D
6 46 27 HC 673 688 0.087 2.5 ppm 18M0G7D
6 47 27 HC 673 688 0.076 2.5 ppm 17M9W7D
6 48 22H HC 834 839 0.072 2.5 ppm 17M9G7D
6 49 22H HC 834 839 0.059 2.5 ppm 17M9W7D
6 5 24D HC 1860 1905 0.126 2.5 ppm 17M9G7D
6 51 24D HC 1860 1905 0.105 2.5 ppm 17M9W7D
6 52 24D HC 1852.5 1912.5 0.149 2.5 ppm 4M50G7D
6 53 24D HC 1852.5 1912.5 0.12 2.5 ppm 4M51W7D
6 54 27 HC 2546.01 2640 0.105 2.5 ppm 96M4G7D
6 55 27 HC 2546.01 2640 0.082 2.5 ppm 96M3W7D
6 56 27 HC 2541 2644.98 0.111 2.5 ppm 86M7G7D
6 57 27 HC 2541 2644.98 0.088 2.5 ppm 86M7W7D
6 58 27 HC 1720 1770 0.185 2.5 ppm 17M9G7D
6 59 27 HC 1720 1770 0.139 2.5 ppm 17M9W7D
6 6 27 HC 1715 1775 0.145 2.5 ppm 8M98W7D
6 61 27 HC 673 688 0.094 2.5 ppm 17M9G7D
6 62 27 HC 673 688 0.076 2.5 ppm 18M0W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15B CC 617 652
7 2 15B CC 717 768
7 3 15B CC 851 940
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
8 1 15C CC 0.11000000 0.14800000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
9 1 15C CC 2402 2480 0.0045
9 2 15C CC HC MO 2412 2472 0.127

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC