FCC ID: 2ANMU-RT5 Tablet

by: SHENZHEN YUNJI INTELLIGENT TECHNOLOGY CO.,LTD latest update: 2023-04-19 model: RT5

Four grants have been issued under this FCC ID on 04/19/2023 (this is one of fifty-eight releases in 2023 for this grantee). Public details available include manuals, frequency information, and internal & external photos. some products also feature user submitted or linked password defaults, drivers, troubleshooting guides, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 User Manual Users Manual pdf 2.38 MiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 Internal photo Internal Photos pdf 2.53 MiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 External photo External Photos pdf 1.32 MiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 ID Label/Location Info pdf April 19 2023
1 2 3 4 ID Label/Location Info pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Test Report pdf April 19 2023
1 2 3 4 Cover Letter(s) pdf April 19 2023
1 2 3 4 BOM Parts List/Tune Up Info pdf April 19 2023 confidential
1 2 3 4 Block Block Diagram pdf April 19 2023 confidential
1 2 3 4 Cover Letter(s) pdf April 19 2023
1 2 3 4 OP Operational Description pdf April 19 2023 confidential
1 2 3 4 SCH Schematics pdf April 19 2023 confidential
1 2 3 4 Cover Letter(s) pdf April 19 2023
1 2 3 4 T Setup photo Test Setup Photos pdf 213.58 KiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 Test Report Test Report pdf 4.86 MiB April 19 2023
1 2 3 4 RF Exposure Info pdf April 19 2023
1 2 3 4 Test Setup photos SAR Test Setup Photos pdf 108.42 KiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 Tune up procedure Parts List/Tune Up Info pdf April 19 2023 confidential
1 2 3 4 RF Exposure Info pdf April 19 2023
1 2 3 4 FCC Software Configuration Control Declaration Rev1.1 Cover Letter(s) pdf 82.11 KiB April 19 2023
1 2 3 4 Software security operational description SDR Software/Security Inf pdf April 19 2023 confidential
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 2.911 (d)(5)(i) Certification Equipment Type v1 Attestation Statements pdf 158.74 KiB April 19 2023
1 2 3 4 Agent Authorization Letter Cover Letter(s) pdf 19.82 KiB April 19 2023
1 2 3 4 Block Diagram Block Diagram pdf April 19 2023 confidential
1 2 3 4 User Manual Users Manual pdf 2.38 MiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 Internal photo Internal Photos pdf 2.53 MiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 External photo External Photos pdf 1.32 MiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 ID Label/Location Info pdf April 19 2023
1 2 3 4 ID Label/Location Info pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Test Report pdf April 19 2023
1 2 3 4 Cover Letter(s) pdf April 19 2023
1 2 3 4 Cover Letter(s) pdf April 19 2023
1 2 3 4 Cover Letter(s) pdf April 19 2023
1 2 3 4 T Setup photo Test Setup Photos pdf 213.58 KiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 Test Report Test Report pdf 4.86 MiB April 19 2023
1 2 3 4 RF Exposure Info pdf April 19 2023
1 2 3 4 Test Setup photos SAR Test Setup Photos pdf 108.42 KiB April 19 2023 / October 17 2023 delayed release
1 2 3 4 RF Exposure Info pdf April 19 2023
1 2 3 4 FCC Software Configuration Control Declaration Rev1.1 Cover Letter(s) pdf 82.11 KiB April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 Attestation Statements pdf April 19 2023
1 2 3 4 2.911 (d)(5)(i) Certification Equipment Type v1 Attestation Statements pdf 158.74 KiB April 19 2023
1 2 3 4 Agent Authorization Letter Cover Letter(s) pdf 19.82 KiB April 19 2023

frequency equipment class purpose
1 2023-04-19 2502.5 ~ 2567.5 PCE - PCS Licensed Transmitter held to ear Original Equipment
2 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
3 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
4 2412 ~ 2462 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 3 4 Effective 2023-04-19
1 2 3 4 Applicant's complete, legal business name SHENZHEN YUNJI INTELLIGENT TECHNOLOGY CO.,LTD
1 2 3 4 FCC Registration Number (FRN) 0026810242
1 2 3 4 Physical Address A2 2F BUILDING ENET NEW INDUSTRIAL PARK, DAFU INDUSTRIAL ZONE, GUANLAN, LONGHUA
1 2 3 4 A2 2F BUILDING ENET NEW INDUSTRIAL PARK
1 2 3 4 SHENZHEN, N/A
1 2 3 4 China
app s TCB Information
1 2 3 4 TCB Application Email Address c******@micomlabs.com
1 2 3 4 TCB Scope B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 Grantee Code 2ANMU
1 2 3 4 Equipment Product Code RT5
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 Name G**** Y******
1 2 3 4 Title Manager
1 2 3 4 Telephone Number 0755-********
1 2 3 4 Fax Number 0755-********
1 2 3 4 E-mail o******@163.com
app s Technical Contact
1 2 3 4 Firm Name SHENZHEN YUNJI INTELLIGENT TECHNOLOGY CO.,LTD
1 2 3 4 Physical Address China
1 2 3 4 E-mail o******@163.com
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)10/17/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 Equipment ClassPCE - PCS Licensed Transmitter held to ear
1 2 3 4 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 DTS - Digital Transmission System
1 2 3 4 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Tablet
1 2 3 4 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 Modular Equipment TypeDoes not apply
1 2 3 4 Purpose / Application is forOriginal Equipment
1 2 3 4 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 Grant CommentsPower output listed is ERP for frequencies below 1GHz and EIRP for frequencies above 1GHz. SAR compliance for body-worn operating configurations is limited to the specific configurations tested for this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the body of the user. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for body-worn accessory, product specific (wireless router), and simultaneous transmission use conditions is 0.82W/kg, 0.82W/kg and 1.53W/kg respectively. This device also contains functions that are not operational in U.S. Territories. This filing is only applicable for US operations.
1 2 3 4 Output power listed is conducted power. This device contains 20, 40 and 80 MHz signal bandwidth. SAR compliance for body-worn operating configurations is limited to the specific configurations tested for this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the body of the user. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for body-worn accessory, product specific (wireless router), and simultaneous transmission use conditions is 0.38W/kg, 0.38W/kg and 1.20W/kg respectively.
1 2 3 4 Output power listed is conducted power.
1 2 3 4 Output power listed is conducted power. This device contains 20 and 40 MHz signal bandwidth. SAR compliance for body-worn operating configurations is limited to the specific configurations tested for this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 10mm separation between the device and the body of the user. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for body-worn accessory, product specific (wireless router), and simultaneous transmission use conditions is 0.71W/kg, 0.71W/kg and 1.53W/kg respectively.
1 2 3 4 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 Firm Name Shenzhen NTEK Testing Technology Co., Ltd.
1 2 3 4 Name A******** L****
1 2 3 4 Telephone Number +86-7********
1 2 3 4 E-mail c******@ntek.org.cn
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 22H 824.2 848.8 2.23872 0.013546 ppm 250KGXW
1 2 22H 824.2 848.8 0.39628 0.011908 ppm 247KG7W
1 3 24E 1850.2 1909.8 1.30617 0.011883 ppm 248KGXW
1 4 24E 1850.2 1909.8 0.50003 0.013665 ppm 259KG7W
1 5 24E 1852.4 1907.6 0.2704 0.010431 ppm 4M19F9W
1 6 27 1712.4 1752.6 0.26669 0.011522 ppm 4M19F9W
1 7 22H 826.4 846.6 0.24946 0.02659 ppm 4M18F9W
1 8 24E 1850.7 1909.3 0.21928 0.00771 ppm 18M0G7D
1 9 24E 1850.7 1909.3 0.17824 0.00531 ppm 18M0W7D
1 1 27 1710.7 1754.3 0.21086 0.00516 ppm 180MG7D
1 11 27 1710.7 1754.3 0.17219 0.0056 ppm 18M0W7D
1 12 22H 824.7 848.3 0.18578 0.008 ppm 8M99G7D
1 13 22H 824.7 848.3 0.15812 0.00859 ppm 8M97W7D
1 14 27 2502.5 2567.5 0.24099 0.00412 ppm 18M0G7D
1 15 27 2502.5 2567.5 0.17824 0.00282 ppm 17M9W7D
1 16 27 699.7 715.3 0.18197 0.01464 ppm 9M01G7D
1 17 27 699.7 715.3 0.15849 0.01271 ppm 9M00W7D
1 18 27 706.5 713.5 0.18155 0.01392 ppm 9M01G7D
1 19 27 706.5 713.5 0.15488 0.01447 ppm 9M00W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC 5180 5240 0.01102
2 2 15E CC 5745 5825 0.01282
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C CC 2402.00000000 2480.00000000 0.0034600
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2402 2480 0.00157
4 2 15C CC 2412 2462 0.04797

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC