FCC ID: NKR-LV65C-T3 Internet Gateway

by: Wistron NeWeb Corporation latest update: 2023-07-06 model: LV65C-T3

Five grants have been issued under this FCC ID on 07/06/2023 (this is one of twenty releases in 2023 for this grantee). Public details available include frequency information, manuals, and internal & external photos. some products also feature user submitted or linked password defaults, troubleshooting guides, drivers, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 User Manual Users Manual pdf 2.89 MiB July 14 2023 / January 02 2024
1 2 3 4 5 Internal Photos Internal Photos pdf 5.11 MiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 External Photos External Photos pdf 1.08 MiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 ID Label/Location Info pdf June 16 2023 / July 06 2023
1 2 3 4 5 Label Location and Sample ID Label/Location Info pdf 773.69 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Block Diagram Block Diagram pdf June 16 2023 confidential
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Op Desc Software Security SDR Software/Security Inf pdf June 16 2023 confidential
1 2 3 4 5 Operational Description Operational Description pdf June 16 2023 confidential
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Parts List BOM Parts List/Tune Up Info pdf June 16 2023 confidential
1 2 3 4 5 RF Exposure Info pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Schematics Schematics pdf June 16 2023 confidential
1 2 3 4 5 Test Report pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report pdf June 16 2023 / July 06 2023
1 2 3 4 5 TSUP WLAN Test Setup Photos pdf 329.10 KiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 Test Report DFS Test Report pdf 1.58 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report WiFi 5GHz Test Report pdf 4.57 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Setup Photos DFS Test Setup Photos pdf 134.69 KiB June 26 2023 / January 02 2024 delayed release
1 2 3 4 5 Tune Up Procedure Parts List/Tune Up Info pdf June 16 2023 confidential
1 2 3 4 5 TSUP WWAN Test Setup Photos pdf 223.97 KiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 Test Report 5G NR Part 1 Test Report pdf 5.23 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 10 Test Report pdf 5.28 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 11 Test Report pdf 3.59 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 2 Test Report pdf 5.23 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 3 Test Report pdf 5.19 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 4 Test Report pdf 5.50 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 5 Test Report pdf 5.48 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 6 Test Report pdf 5.23 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 7 Test Report pdf 5.15 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 8 Test Report pdf 5.27 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 9 Test Report pdf 5.28 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 1 Test Report pdf 5.47 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 2 Test Report pdf 5.47 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 3 Test Report pdf 5.47 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 4 Test Report pdf 4.38 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attstn Stmt part 2.911(d)(5)(i)&(i) Attestation Statements pdf 390.68 KiB June 16 2023 / July 06 2023
1 2 3 4 5 BOM Parts List/Tune Up Info pdf June 16 2023 confidential
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report WiFi 2.4G Test Report pdf 2.61 MiB June 16 2023 / July 06 2023
1 2 3 4 5 TSUP Part 96 Test Setup Photos pdf 161.33 KiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 Test Report Part 96 Pt1 Test Report pdf 5.40 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report Part 96 Pt2 Test Report pdf 5.22 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report Part 96.47 Test Report pdf 729.03 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Indoor Access Point Attestation Statements pdf 837.29 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Op Desc Software Security Info SDR Software/Security Inf pdf June 16 2023 confidential
1 2 3 4 5 Test Report 6E Part 1 Test Report pdf 5.46 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 2 Test Report pdf 5.46 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 3 Test Report pdf 5.44 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 4 Test Report pdf 4.35 MiB June 16 2023 / July 06 2023
1 2 3 4 5 User Manual Users Manual pdf 2.89 MiB July 14 2023 / January 02 2024
1 2 3 4 5 Internal Photos Internal Photos pdf 5.11 MiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 External Photos External Photos pdf 1.08 MiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 ID Label/Location Info pdf June 16 2023 / July 06 2023
1 2 3 4 5 Label Location and Sample ID Label/Location Info pdf 773.69 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 RF Exposure Info pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Statements pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report pdf June 16 2023 / July 06 2023
1 2 3 4 5 TSUP WLAN Test Setup Photos pdf 329.10 KiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 Test Report DFS Test Report pdf 1.58 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report WiFi 5GHz Test Report pdf 4.57 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Setup Photos DFS Test Setup Photos pdf 134.69 KiB June 26 2023 / January 02 2024 delayed release
1 2 3 4 5 TSUP WWAN Test Setup Photos pdf 223.97 KiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 Test Report 5G NR Part 1 Test Report pdf 5.23 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 10 Test Report pdf 5.28 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 11 Test Report pdf 3.59 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 2 Test Report pdf 5.23 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 3 Test Report pdf 5.19 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 4 Test Report pdf 5.50 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 5 Test Report pdf 5.48 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 6 Test Report pdf 5.23 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 7 Test Report pdf 5.15 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 8 Test Report pdf 5.27 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 5G NR Part 9 Test Report pdf 5.28 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 1 Test Report pdf 5.47 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 2 Test Report pdf 5.47 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 3 Test Report pdf 5.47 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report LTE 4G Part 4 Test Report pdf 4.38 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report pdf June 16 2023 / July 06 2023
1 2 3 4 5 Attstn Stmt part 2.911(d)(5)(i)&(i) Attestation Statements pdf 390.68 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Cover Letter(s) pdf June 16 2023 / July 06 2023
1 2 3 4 5 Test Report WiFi 2.4G Test Report pdf 2.61 MiB June 16 2023 / July 06 2023
1 2 3 4 5 TSUP Part 96 Test Setup Photos pdf 161.33 KiB June 16 2023 / January 02 2024 delayed release
1 2 3 4 5 Test Report Part 96 Pt1 Test Report pdf 5.40 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report Part 96 Pt2 Test Report pdf 5.22 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report Part 96.47 Test Report pdf 729.03 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Attestation Indoor Access Point Attestation Statements pdf 837.29 KiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 1 Test Report pdf 5.46 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 2 Test Report pdf 5.46 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 3 Test Report pdf 5.44 MiB June 16 2023 / July 06 2023
1 2 3 4 5 Test Report 6E Part 4 Test Report pdf 4.35 MiB June 16 2023 / July 06 2023

frequency equipment class purpose
1 2023-07-06 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX Original Equipment
2 3705 ~ 3975 PCB - PCS Licensed Transmitter
3 2412 ~ 2462 DTS - Digital Transmission System
4 3555 ~ 3695 CBE - Citizens Band End User Devices
5 6115 ~ 7095 6ID - 15E 6 GHz Low Power Indoor Access Point

Application Forms

app s Applicant Information
1 2 3 4 5 Effective 2023-07-06
1 2 3 4 5 Applicant's complete, legal business name Wistron NeWeb Corporation
1 2 3 4 5 FCC Registration Number (FRN) 0006053789
1 2 3 4 5 Physical Address 20 Park Avenue II Hsinchu Science Park
1 2 3 4 5 20 Park Avenue II
1 2 3 4 5 Hsinchu, N/A
1 2 3 4 5 Taiwan
app s TCB Information
1 2 3 4 5 TCB Application Email Address t******@timcoengr.com
1 2 3 4 5 c******@timcoengr.com
1 2 3 4 5 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 B2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95, 97, & 101 (all below 3 GHz)
app s FCC ID
1 2 3 4 5 Grantee Code NKR
1 2 3 4 5 Equipment Product Code LV65C-T3
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 Name W**** S****
1 2 3 4 5 Title Senior Director / System Engineering dept.
1 2 3 4 5 Telephone Number 886-3******** Extension:
1 2 3 4 5 Fax Number 886-3********
1 2 3 4 5 E-mail w******@wnc.com.tw
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)01/02/2024
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 Equipment ClassNII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 PCB - PCS Licensed Transmitter
1 2 3 4 5 DTS - Digital Transmission System
1 2 3 4 5 CBE - Citizens Band End User Devices
1 2 3 4 5 6ID - 15E 6 GHz Low Power Indoor Access Point
1 2 3 4 5 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Internet Gateway
1 2 3 4 5 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 Modular Equipment TypeDoes not apply
1 2 3 4 5 Purpose / Application is forOriginal Equipment
1 2 3 4 5 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 Grant CommentsOutput Power is Conducted. This device is certified as an end user device and must be installed and operated so as to provide a separation distance of at least 22 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Device supports 20, 40 and 80 MHz bandwidths.
1 2 3 4 5 Output Power is in ERP or EIRP. This device is certified as an end user device and must be installed and operated so as to provide a separation distance of at least 22 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Device supports LTE Bands 2,5,13 and 66 and LTE CA 5B, 66B and 66C.
1 2 3 4 5 Output Power is Conducted. This device is certified as an end user device and must be installed and operated so as to provide a separation distance of at least 22 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Device supports 20 and 40 MHz bandwidths.
1 2 3 4 5 Output Power is EIRP. This device is certified as an end user device and must be installed and operated so as to provide a separation distance of at least 22 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Device supports LTE Bands 48 and 5G NR n48.
1 2 3 4 5 Output Power is in EIRP. This device is certified as an end user device and must be installed and operated so as to provide a separation distance of at least 22 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi-transmitter product procedures. Device supports 20, 40, 80 and 160 MHz bandwidths. Operation is restricted to indoor use only.
1 2 3 4 5 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 Firm Name DEKRA TESTING AND CERTIFICATION CO., LTD. LinKou
1 2 3 4 5 Name M**** L******
1 2 3 4 5 Telephone Number +886-******** Extension:
1 2 3 4 5 Fax Number +886-********
1 2 3 4 5 E-mail m******@dekra.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC MO 5180 5240 0.938
1 2 15E CC MO ND 5260 5320 0.242
1 3 15E CC MO ND 5500 5700 0.245
1 4 15E CC MO 5745 5825 0.946
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 24E 1850.7 1909.3 0.551 0.0019 ppm 17M9G7D
2 2 24E 1850.7 1909.3 0.488 0.0019 ppm 8M97W7D
2 3 24E 1850.7 1909.3 0.457 0.0019 ppm 17M9W7D
2 4 22H 824.7 848.3 0.312 0.0042 ppm 8M97G7D
2 5 22H 824.7 848.3 0.261 0.0042 ppm 8M96W7D
2 6 27 779.5 784.5 0.284 0.0036 ppm 8M94G7D
2 7 27 779.5 784.5 0.234 0.0036 ppm 8M95W7D
2 8 27 1710.7 1779.3 0.565 0.002 ppm 17M9G7D
2 9 27 1710.7 1779.3 0.475 0.002 ppm 17M9W7D
2 1 24E 1852.5 1907.5 0.497 0.0016 ppm 17M9G7D
2 11 24E 1852.5 1907.5 0.377 0.0016 ppm 17M9W7D
2 12 22H 825.6 846.5 0.27 0.0043 ppm 17M9G7D
2 13 22H 825.6 846.5 0.204 0.0043 ppm 17M9W7D
2 14 27 1712.5 1777.5 0.494 0.002 ppm 38M6G7D
2 15 27 1712.5 1777.5 0.373 0.002 ppm 28M6W7D
2 16 27 1712.5 1777.5 0.368 0.002 ppm 38M6W7D
2 17 27 3455 3545 0.826 0.0013 ppm 96M5G7D
2 18 27 3455 3545 0.662 0.0013 ppm 96M5W7D
2 19 27 3705 3975 0.959 0.001 ppm 96M5G7D
2 2 27 3705 3975 0.708 0.001 ppm 77M2W7D
2 21 27 3705 3975 0.705 0.001 ppm 96M5W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C CC MO 2412.00000000 2462.00000000 0.9840000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 96 3552.5 3697.5 0.195 0.0008 ppm 17M9G7D
4 2 96 3552.5 3697.5 0.154 0.0008 ppm 17M9W7D
4 3 96 3555 3695 0.184 0.001 ppm 26M9G7D
4 4 96 3555 3695 0.182 0.001 ppm 35M7G7D
4 5 96 3555 3695 0.182 0.001 ppm 8M61W7D
4 6 96 3555 3695 0.175 0.001 ppm 35M7W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15E CC MO 6115.00000000 7095.00000000 0.3130000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC