all | frequencies |
|
exhibits | applications |
---|---|---|---|---|
manual |
app s | submitted / available | |||||||
---|---|---|---|---|---|---|---|---|
1 |
|
User manual | Users Manual | 5.70 MiB | January 08 2016 | |||
1 | Cover Letter(s) | May 07 2016 / January 08 2016 | ||||||
1 | Cover Letter(s) | May 07 2016 / January 08 2016 | ||||||
1 | External Photos | January 08 2016 | ||||||
1 | Internal Photos | January 08 2016 | ||||||
1 | ID Label/Location Info | January 08 2016 | ||||||
1 | RF Exposure Info | January 08 2016 | ||||||
1 | Test Report | January 08 2016 | ||||||
1 | Test Setup Photos | January 08 2016 |
1 | User manual | Users Manual | 5.70 MiB | January 08 2016 |
Version: V1.0 Serial Number: SJ-20150812094530-003 Publishing Date: 2015-08-19 (R1.0) Outdoor UMTS Micro Base Station Engineering Installation Guide
(ZXSDR BS8922) Address: No. $5, Hi-tech Road South, ShenZhen, P-R.China Postcode: 518057 Tel: +86-755-26770801 URL: hitp://www.zte.com.cn E-mail: 800@zte.com.cn, PTE zre corporation
= ZTE CORPORATION ZTE Conn Safety Information --------------------------- 3 Safety Symbols ----------------------------- 3 Installation Precautions ---------------------- 4 Space Requirement ------------------------- 4 HBISTIAG ---s-n seen metncn nec nencrnenenceeen: 5 Installation FIOW, ==-==----=c7-oseocseecoscsoo 6 Installation Preparation -----2----erserercenens 6 Installation Accessories ---------------------~ 8 Unpacking and Inspection ~---t-rrrtn errr rne 8 Media Requirement RRU Installation Modes Installing the ZXSDR BS8922 on a Pole -------- 9 Installing the ZXSDR BS8922 on the Wall ------- 12 GPS Antenna Installation (Optional) ------------ 16 Cable List ---------------------------------- 17 Cable Installation ---------------------------- 19 Installing the Grounding Cable ---------------- 19 Installing the Power Cable -------------------- m1 Installing the Optical Fiber -------------------- 24 Installing Antenna Feeder Cables -------------- 25 Installing the Monitoring Cable ---------------- 26 Installing the GPS Cable Installing the Ethernet Cable ------------------ 28 Waterproof Handling ------------------------- 30 Concentrator Installation (Optional) ------------ 32 Installing the Waterproof Cover ---------------- 33 Installation Check | --------------------------- 35 Equipment Power-On ----------------------- 36 ClOSurg #ssrsessneeesreessnksssneseareesss 37 ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide =
uo'woo'a}z"Mwy/:dY LO80LL9Z-SSL-98+ 81 BUIYD'Y'd U@YZUEYS YINOS PEOY Y9SI-IH SG ON :sse:ppy ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ Safety Information Installation Precautions The following describes personal health and safety information when you work with ZTE system products. To prevent accidents, read the safety information provided in this document carefully before using ZTE system products. 1 Never open the hermetic seal before or after the installation.
@ Local regulations supersede the information provided in this manual. Where applicable local ; ?. 2 Ss 5 regulations are unavailable, the information herein prevails. The RRU body is applied with antirust coating. Make sure that BAIl personnel must be equipped with the knowledge of safety operations, technical training, the coating is not damaged during and corresponding qualifications certified by ZTE CORPORATION. For some operations, they may need special trainings or qualifications certified by ZTECORPORATION. transportation and installation. Safety Symbols 3Boo not install the device with A. not install the device interfaces facing upwards. horizontally. A Electrical Hazard: There is a risk of electric shock. _ A Laser Hazard: Beware of strong laser beams. Do not look directly at the MR <]
laser beam. A Heat Hazard: Beware of heat sources or hot surfaces that can cause burns.
=Personal Protection tw Remove items of jewelry, such as rings, necklaces, and watches. These items may get entangled with moving parts. Metal jewelry items are conductors that can result in electric shock. Always wear appropriate personal protective equipment when working. Space Req uireme
> Pay attention to the hazard labels and caution or warning information on products. Never cover or remove the hazard labels and caution or warning information. Device Dimensions Recommended Minimum sii Ate z j (Unit: mm) Installation Space Installation Space
> Only use the tools described in the instructions. (Unit: mm) (Unit: mm) i q > >
"Installation Security . LC. co o>
> All personnel working at height must be specially-trained and certificated. Working at height must comply with local laws, regulations, and guidelines.
> The device is heavy. Lifting the device without using a lifting device can result in serious personal injury.
> Do not work at height or iron tower in bad weather such as rain or frog. Falling objects can result in serious or even fatal injuries. Always wear a safety helmet. Never stand or walk under any heavy object that is being lifted. Incorrect electrical installation can result in fire, electric shock, or explosion that is likely to be fatal. Only qualified electricians are allowed to install or modify electrical installations.
> It is recommended that fibers be installed in a temperature higher than 20C.
> Switch off transmitting antennas, or reduce their output power to a safe level when working with, or staying near, these antennas. uo" Woo'aIZMMMy/:GNY LOBOLL9Z-SGL-98+ IL PUIYD'Y'd U@YZUEYS YINOS POY Y9e}-IH GG ON :sseippy 120 Note: For mounting multiple RRUs on a pole or centralized mounting, the spacing between RRUs depends on the mounting components. ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ alae 4 Lift the properly-packed engineering materials used for tower mounting The information provided in this section is used for reference when it is necessary onto the tower in the manner mentioned above. Never lift the to hoist the RRU. engineering materials by binding them directly to the hoisting rope. Operation Tools =
Safety helmet Installation Flow Life belt Hoist the RRU Fixed pulley San Hoisting rope Hauling cable Installation Preparation 7 instatter A on the tower secures the fixed pulley on the tower, and passes the hoisting rope down Unpacking and inspection passed?
Contact the local ZTE office Hoisting rope Yes to the ground through Y y the fixed pulley. Handle Peeaiation instalation, 2 Installer C on the ground Il f uo" Woo'aIZMMMy/:GNY LOBOLL9Z-SGL-98+ IL PUIYD'Y'd U@YZUEYS YINOS POY Y9e}-IH GG ON :sseippy Install the GPS bundles the RRU tightly Hauling sutenafoptone with a cross tie and passes cable | | Install cables the rope through the handle. - ae e Tnstall the 7 concentrator(optional)
: B on the ground drags the hoisting rope downwards. Meanwhile, installer C pulls MX Ao Fixed pulley sais the dragline outwards to gD Power-on protect the device from ns sateren colliding with the tower cee when the device reaches the installation platform. Hauling cable eee Installation Preparation
= Tools and Instruments c Illustrates the tools and instruments required for the installation:
ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide Installation Accessories on 7 Illustrates the installation accessories. Angle adjustment] Clamp (used in |Expansion bolt (used| | GPS antenna Name] _ installation pole-mounted in wall-mounted installation component installation mode) | installation mode) | component (optional) Power cable crimping tool claw hammer |snap-off knife | safety glove | safety helmet |tape measure | level ruler GY
| af ae 5 "|__ vacuum pulley Safety harness|_ marker pen |percussion drill Cleaner
i fi 3 4G packing and Inspecti 5 Cross flathead open-end adjustable i =Co i Good:
power strip_| screwdriver | screwdriver wrench wrench pliers unting s The packing boxes for the ZXSDR BS8922 include crates and cartons. AN mStep diagonal pliers|slip joint pliers 1.Verify that the packing boxes are in good condition. If any is broken, contact the transportation company immediately. multifunctionall hydraulic - coaxial cable 2.Unpack the packing boxes and verify that the goods are consistent with the packing list. press pliers crimper _ [hot-air blower | stripper
=Checking Goods Check the ZXSDR BS8922 and verify that:
1.There are no dents, bumps, peeling, scratches, foaming, paint stripping, or blots on the a SO case. 2.The case surface is in good condition, without problems such as lacquer flaking off and
. | Ethernet cable . scoring. hacksaw file pipe wrench scissors _ |crystal-connector| _cable tie s 7 = . crimper 3.All captive screws are tightly secured without dislocation. 4.The accessories required for the installation are correct and complete. Arrange the inspected goods in accordance with categories.
= Equipment Handover 1.After the goods are inspected, the project supervisor and the customer representative must waterproof instulating grounding approve and sign the Unpacking Acceptance Report. tape tape network tester resistance multimeter | VSWR tester 2.Each party keeps one copy of the Unpacking Acceptance Report. The project supervisor should, within seven days, send the Unpacking Acceptance Report to the local ZTE office for filing. uo" Woo'aIZMMMy/:GNY LOBOLL9Z-SGL-98+ IL PUIYD'Y'd U@YZUEYS YINOS POY Y9e}-IH GG ON :sseippy ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide Zz Angle Adjustment installation Component 8.
@ Fixing clip i . 8 Media Requirement Single-RRU Mounting @ Installation bracket and 040 mm~o120 mm fastening screws 2 Installation bracket &
>4mm . B Vertical fastening screws 2 RRU Installation Modes z a Illustrates the ZXSDR BS8922 installation modes. Steps 3 8 5 8 staleton Pole-mounted installation Wall-mounted installation = Clamps are used in pole-mounted installation mode. The pole diameter is 2 between 40 mm and 120 mm. 5 2 g 1 Use four M620 screws to install the installation bracket on the ZXSDR z BS8922. g 2 a 2 B Image Z
3 Zz Installing the ZXSDR BS8922 on a Pole :
Installation Tools a Operation Tool Se Note: When installing the M6x20 Screws, first fasten the screws about 70% of the depth, then fasten the screws in accordance with the diagonal sequence. Install the installation bracket on the M6 internal hexagonal wrench ZXSDR BS8922. 2 Secure the vertical fastening screws. M6 internal hexagonal wrench Use clamps to install the fixing clip on the pole. Secure the bracket fastening screws. M6 internal hexagonal wrench 8 ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide Zz BF cyce the horizontal angle of the ZXSDR BS8922. es Note: The horizontal angle adjustment range for the ZXSDR BS8922 must be between 30 and 30. a Adjust the horizontal angle of the ZXSDR BS8922. 3 Mount the ZXSDR BS$8922, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the BS8922 Installed installation bracket on the ona Pole. fixing clip. 4 Adjust the vertical angle of the ZXSDR BS8922. eS Note: The angle between the ZXSDR BS8922 and the pole must be between 0 and 20. A Loosen the vertical fastening screws until the ZXSDR BS8922 can be adjusted vertically. uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE b Adjust the vertical angle of the ZXSDR BS8922. Installing the ZXSDR BS8922 on the Wall Installation Tools C Secure the vertical fastening screws. ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide Zz Operation Tool b Use a 912 percussion drill to drill holes at the marked positions on the Mask wall, and use a vacuum cleaner to remove the dust. Tape Cc Use a claw hammer to knock the expansion bolts into the holes, and Long tape fasten the nuts clockwise to make the bolts fully expand in the wall. Marking pen .
; Laval ruler d Loosen the nuts counterclockwise, and remove the nuts, spring Fix screws. Percussion drill washers, and flat washers. Vacuum cleaner Adaptor Adjustable wrench Claw hammer Drstan the fixing clip on the wall. Installing the Fixing Clip on the Wall. Socket wrench Install the installation bracket on the RRU. M6 internal hexagonal wrench Secure the vertical fastening screws. M6 internal hexagonal wrench Secure the bracket fastening screws. M6 internal hexagonal wrench
@ Drilling Specification Note: It is recommended that you use a level ruler to keep the holes horizontal when marking Follow the installation diagram to mark the drilling position on the wall. Steps Nut Spri h Flat h 1 Drill holes on the wall and install _ the drilling holes. iar alaiinieeellasiiamaias expansion bolts. Use four M6*20 screws to install the installation bracket on the ZXSDR BS8922. 5 e
@ Mark holes on the wall in accordance with the drilling specification.
\ Nut Fastening Spring washer 5 Flat washer oe M10x100 expansion bott| "> /:>
uo Woo'sIZ-MMMY/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y499}-IH GS ON sseJppy
(20mm~30mm Note: When installing the M6x20 screws, first fasten the screws about 70% of the depth, then fasten the screws in accordance with the diagonal sequence. ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide Zz 4 Mount the ZXSDR BS8922, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the F wave BS8922 Installed on installation bracket on the the Wall. fixing clip. 5 aciust the vertical angle of the ZXSDR BS8922. Note: The angle between the ZXSDR BS8922 and the wall must be between 0 and 20. A Loosen the vertical fastening screws until the ZXSDR BS8922 can be adjusted vertically. uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE b Adjust the vertical angle Hl : 7 :
of the ZXSDR BS8922. bimedidlve cue GPS Antenna Installation (Optional) C Secure the vertical fastening screws. Installation Tools Operation Tool 6 Adjust the horizontal angle of the ZXSDR BS8922. Installing the. GF'S Antenna. installation cross screwdriver Component on the RRU. is Note: The horizontal angle adjustment range for the ZXSDR BS8922 must be Installing the GPS Antenna on the GPS ;
between 30 and 30 Antenna Installation Component. cross screwdriver a Adjust the horizontal angle of the ZXSDR BS8922. Steps ss a 1 Remove the two M620 screws from the GPS antenna mounting part. 3 Mount the GPS antenna assembly onto the ZXSDR BS8922 with two M6x16 screws. a 2 mount the GPS antenna onto the GPS antenna mounting part. ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ Connector Type Power input connector Three-flat-bottom plug Interconnected Port Power interface of the ZXSDR BS8922 DC power supply. Terminals need to be fabricated on site. AC power cable External View Connector Type Lc LC Interconnected Port OPT interface of the ZXSDR BS8922 Core network or neighbor device Cable Item Local Equipment Interconnected Equipment Connector Type OT terminal OT terminal i Local grounding terminal of r Groundin Grounding bar
'9| Interconnected Port ZXSDR BS8922 9 External View Connector Type DC power input connector Bare wire Interconnected Port The power interface of the ZXSDR BS8922 DC power supply. Terminals need to be fabricated on site. DC power cable External View Optical fiber External View Connector Type N-type connector N-type connector Antenna | Interconnected Port Antenna port of the ZXSDR Antenna RF port BS8922 feeder cable , External View D-type 15-pin (three rows) Connector Type _| straight cable welding circle Bare wire connector Monitoring MON interface of the ZXSDR sr . Monitoring device ee Interconnected Port BS8922 itoring devi External View Connector Type N-type connector N-type connector Interconnected Port| GPS port of the ZXSDR BS8922| GPS antenna RF port GPS cable}
External View a Connector Type 8-pin RJ45 connector 8-pin RJ45 connector ETH interface of the ZXSDR__| PC, core network, neighbor ee BS8922 device, or peripheral device Ethernet cable External View _=-
uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ Cable Installation ZXSDR BS8922 Cable Installation Illustration
Aa cuta proper length of the grounding cable, and peel off the external oa sheath at end A to expose the wires.
} b Put a heat-shrinkable tube on end A, and crimp it on a grounding terminal.
J C Use a hot-air blower to heat the heat-shrinkable tube. d Use the same method to crimp end B on a grounding terminal. Steps 1 Remove the two grounding screws from the grounding point of the a ZXSDR BS8922.
@ Ethernet cable GPS cable Grounding cable @-
DC/AC power cable Monitoring cable Optical fiber Antenna feeder cable @:
Zs Installing TT Grounding Cable Piven end A of the grounding cable on the grounding point of the ZXSDR BS8922.
Installation Tools Operation Tool ]
Crimp an OT terminal. Hydraulic clamp S Fi rotecti di bi Cross screwdriver J ix a protection grounding cable. Adjustable wrench The grounding cable consists of 16 mm? yellow/green fire-resistant multi-strand wires. End A is a dual-hole grounding terminal while end B is a single-hole grounding terminal. The grounding cable is made on site. Figure illustrates how to make a grounding cable. us" Woo'e}zMMMy/:Y LO80LZ9Z-SGZ-98+ IL PUIYD'Y'd U@YZUEYS YINOS POY Y9S}-IH GG ON sseippy H 3 remove the dust on the copper grounding busbar, install end B on the copper grounding busbar, and put anti-rust paint around the grounding screws on the copper grounding busbar. Paste labels on the two ends of the grounding cable. The grounding cable is installed successfully. Installing the Power Cable Installation Tools Operation Tool Ruler Tailor cables. Wire stripper/paper knife Crimp tubular terminals. Crimping pliers Rinsulate the shielding layer. Black insulation tape Fix the power cable to the shell. Black ties Tailor black ties. Diagonal pliers Remove cables from the DC power connector. | Flathead screwdriver The following describes how to make a power cable:
1 Loosen the power cable sheath counterclockwise, and lead end A of the power cable into the cable sheath. Z ss a cable stripper to peel the cable. He ie RE (Wire Stripping Diagram) 4% (Uni) smm ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ 3 Lead the power cable into the tube-shaped terminals, and crimp them Sei Connect the power cable to a power connector. Qi Insert the power cable with crimped tube-shaped terminals into a power plug, and press the crimping part.
. il Pu b Loosen the screw for the grounding interface of the power connector, twist the shielding layer of the power cable into a strip, and connect it to the grounding interface of the power connector. Tighten the screw for the grounding interface. 3 Fasten the nut at the end of the power cable sheath clockwise. Steps a Prerequisite: The power cable is made.
uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ 1 Loosen the nut at the end of the power cable sheath counterclockwise. Installing iat Optical allel=18 a Installation Tools r Operation Tool Fix the optical fiber. Cross screwdriver Remove the bellows. Diagonal plier 2 Insert the power plug of the power cable into the power interface of F i the ZXSDR BS8922. Optical Fiber tt NN
} y GB vusi the power cable sheath ik upwards until it fastens onto : Steps X a the slot of the power interface. Loosen the nut at the end of the
(s= Note: When the power cable optical fiber sheath counter-
sheath is completed clockwise. engaged in the slot of the \
power interface, two click ae
sounds are heard. x i 2 Insert the optical connector into
: : the OPT1 port or OPT2 port of t the ZXSDR BS8922.
- ush the optical fiber sheat
> Push th ical fib heath upwards until it fastens onto the slot of the OPT1 port or OPT2 4 Fasten the nut at the end of the power cable sheath clockwise. Note: When the optical fiber sheath is completed engaged in the slot of the OPT port, two click sounds are heard. uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE 5 Connect end B of the power cable to the power supply. Gras labels on the two ends of the power cable. The power cable is installed successfully. ZTE V Rho ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ 4 Fasten the nut at the end of the optical fiber sheath clockwise. 1 Connect end As of antenna feeder tt cables to ANT interfaces of the ve y ZXSDR BS8922, see the Figure . |
i: 2 tonnect end Bs of antenna feeder I Ee : cables to the antenna installed in 7 separate-installation mode. 5 Connect end B of the optical fiber to the transmission device at the 3 Perform 1+3+3 waterproof handling opposite end. for the cable connectors. For detailed information, refer to Paste labels at the two ends of the optical fiber. The optical fiber is Appendix A Waterproof Handling. installed successfully. 9 (am
. ae labels on the two ends of Installing Antenna Feeder Cables antenna feeder cables. The oe Prerequisite: The ZXSDR BS8922 is connected to an antenna suseeestiliy cables are installed installed in separate-installation mode. Installation Tools . Operation Tool Installing the Monitoring Cable uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE Fasten feeder connectors. Cross-head screwdriver/Torque wrench Installation Tools PVC adhesive tape Oo ~ Tool Waterproof feeder connectors. Waterproof cement petabon _ oo :
; Fasten monitoring cable. Cross-head screwdriver Ultraviolet-proof tape Antenna Feeder Cable Monitoring Cable A B A B Steps :
1 Connect end As of antenna feeder cables to ANT interfaces of the End B of the monitoring cable is a bare wire, and needs to be ZXSDR BS8922, see the Figure . connected on site. For a description of the signal definitions and cable connections, refer to Table. a ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ Pin No. at End A| Signal Name __| Signal Description Cable Color at End B 1 1 MON_Rsagsa | MONITOR interface RS485 bus | 2.4 Connect end A of the GPS cable to the GPS interface of the ZXSDR signal, positive BS8922. MONITOR interface RS485 bus 2 MON_RS485B signal, negative Black 3 Dry_Node_In1+| Dry contact input, positive Brown 8 GND Grounding Yellow 4 Dry_Node_In2+] Dry contact input, positive Blue 10 GND Grounding White Steps a 1 Connect end A of the monitoring cable to the MON interface of the ZXSDR BS8922. }
Z connect end B of the monitoring cable toa monitoring device.
} Z connect end B of the GPS
~ cable to the GPS antenna. Lo 3 Perform 1+3+3 waterproof handling for the GPS cable connectors. For detailed information, refer to Appendix A Waterproof Handling. 3 Paste labels on the two ends of the monitoring cable. The monitoring cable is installed successfully. Installing the GPS Cable Prerequisite: The GPS antenna is installed. Installing the Ethernet Cable Installation Tools Installation Tools A vaste labels on the two ends of the GPS cable. The GPS cable is installed successfully. uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE Spero Higa! Operation Tool Fasten GPS cable connectors. Torque wrench Crimp the crystal connector at end A and B. | Ethernet cable crystal-connector crimper PVC adhesive tape Test the Ethernet cable. Network tester Waterproof GPS cable connectors. Waterproof cement Ultraviolet-proof tape The following describes how to make an Ethernet cable:
GPS Cable 1 Loosen the Ethernet cable sheath counterclockwise, and lead end A of the Ethernet cable into the cable sheath. ZTE ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ i 3 Push the Ethernet cable sheath upwards until it fastens onto the slot of the ETH interface. Peel the Ethernet cable, and crimp the crystal connector at end A. For a description of the cable connections, refer to Table. No. Cable Color at End A Cable Color at End B 1 White/Orange White/Orange bee 2 Orange Orange 3 White/Green White/Green 4 Green Blue 5 Blue White/Blue 6 White/Blue Green 7 White/Brown White/Brown 8 Brown Brown cE Note: When the Ethernet cable sheath is completely engaged in th H interfi lick 5 3 Fasten the nut at the end of the Ethernet cable sheath clockwise. inthe ETH interface: wo clicwsoundeaveheard 4 Fasten the nut at the end of the Ethernet cable sheath clockwise. 5 Connect the other end of the Ethernet cable to the transmission device at the oppositeend. Crimp the crystal connector at end B of the Ethernet cable. 5 Use a network tester to verify that the wires of the Ethernet cable are crimped and connected properly. The Ethernet cable is made 6 raste labels on the two ends of successfully. the Ethernet cable. The Ethernet cable is installed successfully. Steps Waterproof Handling 1 Loosen the nut at the end of the Ethernet cable sheath counterclockwise. Waterproof Handling Requirement uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE
: Item Requirement Antenna feeder cable 1+3+3 waterproof handling 3)
=z GPS cable 1+3+3 waterproof handling Insert end A of the Ethernet cable into the ETH interface of the ZXSDR The following procedure describes how to waterproof a feeder BS8922. connector. Dg ZTE V Rho ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _ Steps 3 Wrap three layers of ultraviolet-proof tape in the 1 Wrap one layer of insulating tape from bottom to following manner: from bottom to top, from top to top, see Figure @. bottom, and from bottom to top, see Figure @ ,
,and @. 2 Wrap three layers of waterproof tape in the following manner: from bottom to top, from top to bottom, and from bottom to top, see Figure @,
,and @. Expand the waterproof tape, remove the release Paper, and paste one end of the tape 20-50 mm below the connector. Make sure that the tape layer faces inwards. 6 Ultraviolet-proof cable tie 4 Use ultraviolet-proof cable ties to bind the two ends of the tape tightly . Use ultraviolet-proof cable ties to bind the two ends of the tape tightly, see Stretch the waterproof tape with even force to make Figure @. its width 50% to 75% of its original width. Keep the uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE Stretching force and wrap the tape from bottom to Concentrator Installation(Optional) top in overlapping mode, namely, each layer of the tape covers half of the previous layer. Prerequisite: The cables are installed. Installation Tools When the tape is wrapped 20-50 mm above the Operation Tool connector, use the same method to wrap the tape Fasten a Concentrator on the ZXSDR BS8922| Cross-head screwdriver from top to bottom until the tape is 20-50 mm below the connector, then, wrap the tape from Concentrator bottom to top. S) p--+--e et i After the waterproof tape is wrapped properly, squeeze the tape by hand to make the layers stick firmly to the cable and connector. ~- . ss a Steps 1 Clamp a concentrator to the 2 Fasten the two captive screws ZXSDR BS8922, and fix it on the on the front of the concentrator. ZXSDR BS8922 with the screws The concentrator is installed on the two sides of it. successfully. _ yt et Installing the Waterproof Cover A waterproof cover protects the device from water and ensures proper air tightness. This procedure uses a waterproof cover for the power supply as an example to describe how to install and remove a waterproof cover. tet Steps for Installing the Waterproof Cover 2reui the outer enclosure, and install the inner enclosure onto the power interface, until two click sounds are heard. 1 Push the elastic barrier to unlock the inner and outer enclosures. ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide _
@ Inner enclosure Outer enclosure Protruding part of the power interface o 4 3 Cover the inner enclosure with the outer enclosure, until a click sound is heard. ei Note: If the outer enclosure cannot be installed, verify that the fasteners of the inner enclosure are in position, and install the outer enclosure again. After the outer enclosure is installed, slightly pull the outer enclosure to verify that the waterproof cover is properly installed.
@ Inner enclosure
@ Outer enclosure Steps for Removing the Waterproof Cover 4 Unlock the inner and outer enclosures by referring to the right Figure. cS Frou the outer enclosure properly, and press the fasteners of the inner enclosure to remove the waterproof cover.
@ Inner enclosure Outer enclosure uo WOo'sIZ-MMM/:;GNY LOBOLL9Z-SSL-98+ 191 BUIUD"Y'd U@YZUSYS YINOS POY Y99}-IH GS ON sseJppy HE i, ZTE Y Whe ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide =
he Rust and stains on the grounding terminal of the protective grounding 13 | cable are removed before the cable is connected. After the cable is connected, anticorrosion and antirust measures are taken properly. Installati Item No. Requirement Grounding The installation components are installed in proper order, and the and 14 All cable connectors are wrapped for waterproof Purposes. Insulating Eau equipment is fixed securely without swaying. waterproof tape and waterproof tape are wrapped tightly and sequentially. wnutatlation The independent pole is equipped with a lightning rod, and the handling The protective grounding cable of the equipment is installed properly, 2. | equipment is within the protection scope of 45 degrees and grounded 4g | and cannot be cascaded with other protective grounding cables. The reliably. protective grounding cable is connected to the nearest copper grounding bar. The wire lugs and bare wires of the power cable and the grounding 3. | cable are wrapped with tubes or insulating tape. There are no exposed Cable copper wires.The copper lug type is consistent with the cable diameter. =X rT pment Power-o installation The power supply is connected properly, and the terminals of the 4 | power cable and grounding cable are crimped tightly. The copper lugs ZXSDR BS8922 Power-On Procedure are fastened on binding posts through flat washer and spring washer. The surplus grounding cable and power cable are cut off. All cables 5 | are complete and their insulating layers are in good condition. It is prohibited to splice two cables. Troubleshoot the problem Whether the output voltage of the power supply is The power cable, signal cables, and fiber pigtails are bundled by 6 | category and routed separately, with a spacing of 5 cm between each other. All cable connectors are connected securely. All DIN-type connectors Yes | eg r and N-type connectors are fastened properly. Cable installation | 8 | The bending radius of all cables satisfy the requirement. Power on the equipment Troubleshoot the problem 9 Unused optical cables, optical channels, and sockets are equipped with A protective caps. Whether the input voltage of the equipment is normal Black cable ties and white cable ties cannot be interchanged. White cable ties are used indoors and must be cut off at the end, without 10 | leaving any sharp edge. Black cable ties are used outdoors, and must be cut off at the end with a 3-5 mm margin in case of expansion due to high temperature. Power off the equipment uo'woo'elznmmy/:dny L080L292-SSZ-98+ I@L PULYD'Y'd UaYZUEYS YINOS peoy YDeI-IH Gg ON sselppy HE Whether the status of indicators is normal 11 | All cable labels are correct and pasted in the same direction. The outdoor feeder cable and GPS cable are grounded in accordance 2 with relevant specifications. ZTE XN Power-On Steps:
1 Connect the power supply equipment to the junction box of the ZXSDR BS8922, or switch on the air circuit breaker of the lightning protection box. me Observe the indicators to determine whether the ZXSDR BS8922 is powered on successfully. Ca Note: The following describes the status of indicators when the ZXSDR BS8922 is operating properly:
RUN (operating status indicator): flashing (lit for 0.3 s and not lit for 0.3 s) ALM (fault indicator): not lit OPT1/ETH (link status indicator): flashing (lit for 0.3 s and not lit for 0.3 s) OPT2 (link status indicator): flashing (lit for 0.3 s and not lit for 0.3 s) VSWR (SWR indicator): not lit ACT (cell status indicator): lit REF (clock reference indicator): flashing (lit for 0.3 s and not lit for 0.3 s) Closure Before leaving the installation site, make sure that the following jobs are completed:
= Put away the tools. Put away the installation tools.
@ Recycle redundant materials. Recycle excess materials and hand them to the customer.
= Clean up the installation site. Remove trash from the installation site to keep a clean environment.
@ Complete the installation report. Fill in the installation report and submit it to the person in charge. ZXSDR BS8922 Outdoor UMTS Micro Base Station Engineering Installation Guide =
uo'woo'a}z"Mwy/:dY LO80LL9Z-SSL-98+ 81 BUIYD'Y'd U@YZUEYS YINOS PEOY Y9SI-IH SG ON :sse:ppy
frequency | equipment class | purpose | ||
---|---|---|---|---|
1 | 2016-08-01 | 1930 ~ 1990 | PCB - PCS Licensed Transmitter | Original Equipment |
app s | Applicant Information | |||||
---|---|---|---|---|---|---|
1 | Effective |
2016-08-01
|
||||
1 | Applicant's complete, legal business name |
ZTE Corporation
|
||||
1 | FCC Registration Number (FRN) |
0009043175
|
||||
1 | Physical Address |
ZTE Plaza, Hi-tech Park, Nanshan District
|
||||
1 |
Shenzhen, Guangdong, N/A 518057
|
|||||
1 |
China
|
|||||
app s | TCB Information | |||||
1 | TCB Application Email Address |
V******@tuvam.com
|
||||
1 | TCB Scope |
B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
|
||||
app s | FCC ID | |||||
1 | Grantee Code |
Q78
|
||||
1 | Equipment Product Code |
BS8922S1900
|
||||
app s | Person at the applicant's address to receive grant or for contact | |||||
1 | Name |
Y**** X****
|
||||
1 | Title |
Product Certification Manager
|
||||
1 | Telephone Number |
0086-********
|
||||
1 | Fax Number |
0086-********
|
||||
1 |
x******@zte.com.cn
|
|||||
app s | Technical Contact | |||||
n/a | ||||||
app s | Non Technical Contact | |||||
n/a | ||||||
app s | Confidentiality (long or short term) | |||||
1 | Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | Yes | ||||
1 | Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | No | ||||
if no date is supplied, the release date will be set to 45 calendar days past the date of grant. | ||||||
app s | Cognitive Radio & Software Defined Radio, Class, etc | |||||
1 | Is this application for software defined/cognitive radio authorization? | No | ||||
1 | Equipment Class | PCB - PCS Licensed Transmitter | ||||
1 | Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant) | Outdoor FDD Micro Base Station | ||||
1 | Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application? | No | ||||
1 | Modular Equipment Type | Does not apply | ||||
1 | Purpose / Application is for | Original Equipment | ||||
1 | Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization? | No | ||||
1 | Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization? | No | ||||
1 | Grant Comments | Power output listed is conducted per port. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of §1.1307. | ||||
1 | Is there an equipment authorization waiver associated with this application? | No | ||||
1 | If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded? | No | ||||
app s | Test Firm Name and Contact Information | |||||
n/a | ||||||
Equipment Specifications | |||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line | Rule Parts | Grant Notes | Lower Frequency | Upper Frequency | Power Output | Tolerance | Emission Designator | Microprocessor Number | |||||||||||||||||||||||||||||||||
1 | 1 | 24E | 1930.00000000 | 1990.00000000 | 5.5200000 | 0.0200000000 ppm | 3M97F9W |
some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details
This product uses the FCC Data API but is not endorsed or certified by the FCC