FCC ID: YCO-IML-C6400W LTE Mobile WIFI

by: Infomark Co., Ltd. latest update: 2023-02-09 model: IML-C6400W

Six grants have been issued under this FCC ID on 02/09/2023 (this is one of six releases in 2023 for this grantee). Public details available include manuals, frequency information, and internal & external photos. some products also feature user submitted or linked password defaults, drivers, troubleshooting guides, warrantee terms, & instructions.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 User Manual Users Manual pdf 1.69 MiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 Antenna Location Internal Photos pdf 138.77 KiB February 09 2023 / August 05 2023 delayed release
1 2 3 4 5 6 Internal Photos Internal Photos pdf 270.30 KiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 External Photos External Photos pdf 63.93 KiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 ID Label/Location Info pdf February 09 2023
1 2 3 4 5 6 ID Label/Location Info pdf February 09 2023
1 2 3 4 5 6 ID Label/Location Info pdf February 09 2023
1 2 3 4 5 6 Cover Letter(s) pdf February 09 2023
1 2 3 4 5 6 Attestation Statements pdf February 09 2023
1 2 3 4 5 6 Block Diagram Block Diagram pdf February 09 2023 confidential
1 2 3 4 5 6 Cover Letter(s) pdf February 09 2023
1 2 3 4 5 6 Test Report pdf February 09 2023
1 2 3 4 5 6 EMI Test Setup Photo Test Setup Photos pdf 1.14 MiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 Attestation Statements pdf February 16 2023 / February 09 2023
1 2 3 4 5 6 Attestation Statements pdf February 09 2023
1 2 3 4 5 6 Operational Description Operational Description pdf February 09 2023 confidential
1 2 3 4 5 6 Antenna Specification Operational Description pdf February 09 2023 confidential
1 2 3 4 5 6 LTE Test Report B26 (Part 22) Test Report pdf 2.42 MiB February 09 2023
1 2 3 4 5 6 LTE Test Report B26 (Part 90) Test Report pdf 2.28 MiB February 09 2023
1 2 3 4 5 6 Part List Parts List/Tune Up Info pdf February 09 2023 confidential
1 2 3 4 5 6 SAR Setup Photo Test Setup Photos pdf 274.71 KiB February 09 2023 / August 05 2023 delayed release
1 2 3 4 5 6 RF Exposure Info pdf February 09 2023
1 2 3 4 5 6 Schematics Schematics pdf February 09 2023 confidential
1 2 3 4 5 6 Test Setup Photo Test Setup Photos pdf 1.75 MiB February 09 2023 / August 05 2023 delayed release
1 2 3 4 5 6 Placement Operational Description pdf February 09 2023 confidential
1 2 3 4 5 6 Antenna Specification Test Report pdf 538.54 KiB February 09 2023
1 2 3 4 5 6 DTS Test Report Test Report pdf 2.07 MiB February 09 2023
1 2 3 4 5 6 DSS Test Report Test Report pdf 2.66 MiB February 09 2023
1 2 3 4 5 6 Attestation Statements pdf February 09 2023
1 2 3 4 5 6 Placement Operational Description pdf February 09 2023 confidential
1 2 3 4 5 6 User Manual Users Manual pdf 1.69 MiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 Antenna Location Internal Photos pdf 138.77 KiB February 09 2023 / August 05 2023 delayed release
1 2 3 4 5 6 Internal Photos Internal Photos pdf 270.30 KiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 External Photos External Photos pdf 63.93 KiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 ID Label/Location Info pdf February 09 2023
1 2 3 4 5 6 ID Label/Location Info pdf February 09 2023
1 2 3 4 5 6 ID Label/Location Info pdf February 09 2023
1 2 3 4 5 6 Cover Letter(s) pdf February 09 2023
1 2 3 4 5 6 Attestation Statements pdf February 09 2023
1 2 3 4 5 6 Cover Letter(s) pdf February 09 2023
1 2 3 4 5 6 Test Report pdf February 09 2023
1 2 3 4 5 6 EMI Test Setup Photo Test Setup Photos pdf 1.14 MiB February 09 2023 / August 08 2023 delayed release
1 2 3 4 5 6 Attestation Statements pdf February 16 2023 / February 09 2023
1 2 3 4 5 6 LTE Test Report B26 (Part 22) Test Report pdf 2.42 MiB February 09 2023
1 2 3 4 5 6 LTE Test Report B26 (Part 90) Test Report pdf 2.28 MiB February 09 2023
1 2 3 4 5 6 SAR Setup Photo Test Setup Photos pdf 274.71 KiB February 09 2023 / August 05 2023 delayed release
1 2 3 4 5 6 RF Exposure Info pdf February 09 2023
1 2 3 4 5 6 Test Setup Photo Test Setup Photos pdf 1.75 MiB February 09 2023 / August 05 2023 delayed release
1 2 3 4 5 6 Antenna Specification Test Report pdf 538.54 KiB February 09 2023
1 2 3 4 5 6 DTS Test Report Test Report pdf 2.07 MiB February 09 2023
1 2 3 4 5 6 DSS Test Report Test Report pdf 2.66 MiB February 09 2023

frequency equipment class purpose
1 2023-02-09 859 ~ 894 CXX - Communications Rcvr for use w/ licensed Tx and CBs Original Equipment
2 831.5 ~ 841.5 TNB - Licensed Non-Broadcast Station Transmitter
3 902 ~ 928 CYY - Communications Receiver used w/Pt 15 Transmitter
4 2412 ~ 2472 DTS - Digital Transmission System
5 915.2 ~ 927.8 DSS - Part 15 Spread Spectrum Transmitter
6 JBP - Part 15 Class B Computing Device Peripheral

Application Forms

app s Applicant Information
1 2 3 4 5 6 Effective 2023-02-09
1 2 3 4 5 6 Applicant's complete, legal business name Infomark Co., Ltd.
1 2 3 4 5 6 FCC Registration Number (FRN) 0003758182
1 2 3 4 5 6 Physical Address 8F, 321, Hwangsaeul-ro
1 2 3 4 5 6 Seongnam-Si, Gyonggi-Do, N/A
1 2 3 4 5 6 South Korea
app s TCB Information
1 2 3 4 5 6 TCB Application Email Address T******@hctamerica.com
1 2 3 4 5 6 TCB Scope A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 A4: UNII devices & low power transmitters using spread spectrum techniques
app s FCC ID
1 2 3 4 5 6 Grantee Code YCO
1 2 3 4 5 6 Equipment Product Code IML-C6400W
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 Name Y****** S********
1 2 3 4 5 6 Title General Manager
1 2 3 4 5 6 Telephone Number 82-10********
1 2 3 4 5 6 Fax Number 82-31********
1 2 3 4 5 6 E-mail y******@infomark.co.kr
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)08/08/2023
1 2 3 4 5 6 08/05/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 Equipment ClassCXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 TNB - Licensed Non-Broadcast Station Transmitter
1 2 3 4 5 6 CYY - Communications Receiver used w/Pt 15 Transmitter
1 2 3 4 5 6 DTS - Digital Transmission System
1 2 3 4 5 6 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)LTE Mobile WIFI
1 2 3 4 5 6 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?No
1 2 3 4 5 6 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 Grant CommentsPower output listed is Conducted for Part 90 and ERP for Part 22. Values listed for LTE operations are for highest power and widest bandwidth for each modulation. This device supports LTE bandwidths of: 5MHz,10MHz and 15MHz under Part 90 & 22H (LTE Band 26, 814-824 MHz & 824-849MHz). The highest reported SAR for stand-alone and simultaneous transmission exposure conditions are 0.31 W/kg and 0.31 W/kg, respectively. This device also contains functions that are not operational in U.S. Territories. This filing is only applicable for US operations.
1 2 3 4 5 6 Output power listed is peak combined conducted power. This device is capable of 20MHz and 40MHz channel bandwidths operations. The antenna(s) used for this transmitter must not be collocated or operating in conjunction with any other antenna, except in accordance with FCC multi-transmitter product procedures. End-users and installers must be provided with antenna installation and transmitter operating conditions for satisfying RF exposure compliance. The highest reported SAR for stand-alone and simultaneous transmission exposure conditions are <0.10 W/kg and 1.48 W/kg, respectively.
1 2 3 4 5 6 Power listed is peak conducted. SAR compliance for body-worn operation is based on a separation distance of 0 cm between the unit and the body of the user. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. Belt clips or holsters not listed in this filing may not contain metallic components. The highest reported SAR values for body-worn and simultaneous transmission are 1.47 W/kg and 1.48 W/kg respectively.
1 2 3 4 5 6 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 Firm Name HCT Co., Ltd.
1 2 3 4 5 6 Name L**** Y********
1 2 3 4 5 6 Telephone Number 82-31********
1 2 3 4 5 6 Fax Number 82-31********
1 2 3 4 5 6 E-mail y******@hct.co.kr
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15B CC 859.00000000 894.00000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 9 816.5 821.5 0.2 2.5 ppm 4M51G7D
2 2 9 816.5 821.5 0.172 2.5 ppm 4M50W7D
2 3 9 821.5 821.5 0.195 2.5 ppm 13M4G7D
2 4 9 821.5 821.5 0.159 2.5 ppm 13M4W7D
2 5 22H 826.5 846.5 0.065 2.5 ppm 4M51G7D
2 6 22H 826.5 846.5 0.055 2.5 ppm 4M49W7D
2 7 22H 831.5 841.5 0.056 2.5 ppm 13M4G7D
2 8 22H 831.5 841.5 0.048 2.5 ppm 13M4W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15B CC 902.00000000 928.00000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2412.00000000 2472.00000000 0.0520000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15C CC 902.3 914.9 0.114
5 2 15C CC 915.2 927.8 0.112
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 15B CC

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC