happy holidays!

FCC ID: IHDT56AF5 Mobile Cellular Phone

by: Motorola Mobility LLC latest update: 2022-07-21 model: T56AF5

Eight grants have been issued under this FCC ID on 07/21/2022 (this is one of three hundred and forty-three releases in 2022 for this grantee). Public details available include manuals, internal & external photos, and frequency information. some products also feature user submitted or linked troubleshooting guides, warrantee terms, password defaults, instructions, & drivers.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 8 GSG Users Manual pdf 983.53 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 LI Users Manual pdf 1009.49 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part1 Internal Photos pdf 5.79 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part2 Internal Photos pdf 5.65 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part3 Internal Photos pdf 5.69 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part4 Internal Photos pdf 3.34 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 ExPho External Photos pdf 4.26 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 E-Label and Step ID Label/Location Info pdf 73.13 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 BlckDic Block Diagram pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 CXX Tsup Test Setup Photos pdf 308.75 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 OD Product Equality Declaration Operational Description pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 PartsLst Parts List/Tune Up Info pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 Schematic Schematics pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 cvrltr FCC Confidentiality Request Cover Letter(s) pdf 136.92 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Power of Attorney Letter Cover Letter(s) pdf 151.96 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Rpt Part1-3-updated-7.20 Test Report pdf 5.43 MiB July 20 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Rpt Part2-3-updated-7.20 Test Report pdf 5.38 MiB July 20 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Rpt Part3-3-updated-7.20 Test Report pdf 3.64 MiB July 20 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Tsup Test Setup Photos pdf 369.15 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Test Report pdf July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Attestation for 6XD Device Declaration Attestation Statements pdf 133.12 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Device SW Security Statement SDR Software/Security Inf pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 Operation Description Operational Description pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 Power Management OD Operational Description pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 Tune Up Parts List/Tune Up Info pdf July 06 2022 confidential
1 2 3 4 5 6 7 8 Part 1 SAR+PD Rpt Part1-2 RF Exposure Info pdf 4.93 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 1 SAR+PD Rpt Part2-2 RF Exposure Info pdf 4.99 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 1 SAR Tsup Test Setup Photos pdf 878.46 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Part 1 WiFi 6E+PD Tsup Test Setup Photos pdf 613.32 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 5G Sub-6GHz VoIP OTT and VONR HAC Attestation Cover Letter(s) pdf 137.29 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 HAC RF Tsup Test Setup Photos pdf 205.15 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 HAC T-coil Tsup Test Setup Photos pdf 205.13 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Rpt 2G, 3G Part1-2 Test Report pdf 5.69 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 2G, 3G Part2-2 Test Report pdf 1.30 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27O n77.78 Part1-3 Test Report pdf 5.62 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27O n77.78 Part2-3 Test Report pdf 5.72 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27O n77.78 Part3-3 Test Report pdf 2.29 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27Q n77.78 Part1-2 Test Report pdf 5.78 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27Q n77.78 Part2-2 Test Report pdf 1.44 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part1-5 Test Report pdf 5.63 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part2-5 Test Report pdf 5.72 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part3-5 Test Report pdf 5.51 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part4-5 Test Report pdf 5.52 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part5-5 Test Report pdf 847.73 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part1-9 Test Report pdf 5.56 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part2-9 Test Report pdf 5.65 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part3-9 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part4-9 Test Report pdf 5.76 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part5-9 Test Report pdf 5.60 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part6-9 Test Report pdf 5.77 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part7-9 Test Report pdf 5.78 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part8-9 Test Report pdf 5.56 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part9-9 Test Report pdf 2.94 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 27Q B42 Part1-2 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 27Q B42 Part2-2 Test Report pdf 4.46 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 90S B26 Part1-2 Test Report pdf 5.66 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 90S B26 Part2-2 Test Report pdf 3.20 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part1-14 Test Report pdf 5.65 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part10-14 Test Report pdf 5.63 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part11-14 Test Report pdf 5.74 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part12-14 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part13-14 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part14-14 Test Report pdf 2.66 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part2-14 Test Report pdf 5.57 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part3-14 Test Report pdf 5.52 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part4-14 Test Report pdf 5.77 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part5-14 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part6-14 Test Report pdf 5.64 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part7-14 Test Report pdf 5.73 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part8-14 Test Report pdf 5.57 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part9-14 Test Report pdf 5.66 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Inter band CA Test Report pdf 942.47 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Tsup 2G, 3G Test Setup Photos pdf 305.14 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup 5G 27O n77.78 Test Setup Photos pdf 456.41 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup 5G 27Q n77.78 Test Setup Photos pdf 509.07 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup 5G n5.n7.n38.n41.n66 Test Setup Photos pdf 509.56 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE 27Q B42 Test Setup Photos pdf 306.53 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE 90S B26 Test Setup Photos pdf 306.48 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE B7,38,41 Test Setup Photos pdf 511.91 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE Bands Test Setup Photos pdf 304.18 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE Inter band CA Test Setup Photos pdf 505.74 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Part 0 SAR Rpt RF Exposure Info pdf 684.49 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 2 TAS validation Rpt Part1-2 RF Exposure Info pdf 4.45 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 2 TAS validation Rpt Part2-2 RF Exposure Info pdf 4.32 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 2 TAS validation Tsup Test Setup Photos pdf 492.33 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 GSG Users Manual pdf 983.53 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 LI Users Manual pdf 1009.49 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part1 Internal Photos pdf 5.79 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part2 Internal Photos pdf 5.65 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part3 Internal Photos pdf 5.69 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part4 Internal Photos pdf 3.34 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 ExPho External Photos pdf 4.26 MiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 E-Label and Step ID Label/Location Info pdf 73.13 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 CXX Tsup Test Setup Photos pdf 308.75 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 cvrltr FCC Confidentiality Request Cover Letter(s) pdf 136.92 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Power of Attorney Letter Cover Letter(s) pdf 151.96 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Rpt Part1-3-updated-7.20 Test Report pdf 5.43 MiB July 20 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Rpt Part2-3-updated-7.20 Test Report pdf 5.38 MiB July 20 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Rpt Part3-3-updated-7.20 Test Report pdf 3.64 MiB July 20 2022 / July 21 2022
1 2 3 4 5 6 7 8 6XD Tsup Test Setup Photos pdf 369.15 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Test Report pdf July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Attestation for 6XD Device Declaration Attestation Statements pdf 133.12 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 1 SAR+PD Rpt Part1-2 RF Exposure Info pdf 4.93 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 1 SAR+PD Rpt Part2-2 RF Exposure Info pdf 4.99 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 RF Exposure Info pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 1 SAR Tsup Test Setup Photos pdf 878.46 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Part 1 WiFi 6E+PD Tsup Test Setup Photos pdf 613.32 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 5G Sub-6GHz VoIP OTT and VONR HAC Attestation Cover Letter(s) pdf 137.29 KiB July 07 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 HAC RF Tsup Test Setup Photos pdf 205.15 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Test Report pdf July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 HAC T-coil Tsup Test Setup Photos pdf 205.13 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Rpt 2G, 3G Part1-2 Test Report pdf 5.69 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 2G, 3G Part2-2 Test Report pdf 1.30 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27O n77.78 Part1-3 Test Report pdf 5.62 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27O n77.78 Part2-3 Test Report pdf 5.72 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27O n77.78 Part3-3 Test Report pdf 2.29 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27Q n77.78 Part1-2 Test Report pdf 5.78 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G 27Q n77.78 Part2-2 Test Report pdf 1.44 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part1-5 Test Report pdf 5.63 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part2-5 Test Report pdf 5.72 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part3-5 Test Report pdf 5.51 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part4-5 Test Report pdf 5.52 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt 5G n5.n7.n38.n41.n66 Part5-5 Test Report pdf 847.73 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part1-9 Test Report pdf 5.56 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part2-9 Test Report pdf 5.65 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part3-9 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part4-9 Test Report pdf 5.76 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part5-9 Test Report pdf 5.60 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part6-9 Test Report pdf 5.77 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part7-9 Test Report pdf 5.78 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part8-9 Test Report pdf 5.56 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Bands Part9-9 Test Report pdf 2.94 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 27Q B42 Part1-2 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 27Q B42 Part2-2 Test Report pdf 4.46 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 90S B26 Part1-2 Test Report pdf 5.66 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE 90S B26 Part2-2 Test Report pdf 3.20 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part1-14 Test Report pdf 5.65 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part10-14 Test Report pdf 5.63 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part11-14 Test Report pdf 5.74 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part12-14 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part13-14 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part14-14 Test Report pdf 2.66 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part2-14 Test Report pdf 5.57 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part3-14 Test Report pdf 5.52 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part4-14 Test Report pdf 5.77 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part5-14 Test Report pdf 5.75 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part6-14 Test Report pdf 5.64 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part7-14 Test Report pdf 5.73 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part8-14 Test Report pdf 5.57 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE B7,38,41 Part9-14 Test Report pdf 5.66 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Rpt LTE Inter band CA Test Report pdf 942.47 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 PCE Tsup 2G, 3G Test Setup Photos pdf 305.14 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup 5G 27O n77.78 Test Setup Photos pdf 456.41 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup 5G 27Q n77.78 Test Setup Photos pdf 509.07 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup 5G n5.n7.n38.n41.n66 Test Setup Photos pdf 509.56 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE 27Q B42 Test Setup Photos pdf 306.53 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE 90S B26 Test Setup Photos pdf 306.48 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE B7,38,41 Test Setup Photos pdf 511.91 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE Bands Test Setup Photos pdf 304.18 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 PCE Tsup LTE Inter band CA Test Setup Photos pdf 505.74 KiB July 06 2022 / January 18 2023 delayed release
1 2 3 4 5 6 7 8 Part 0 SAR Rpt RF Exposure Info pdf 684.49 KiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 2 TAS validation Rpt Part1-2 RF Exposure Info pdf 4.45 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 2 TAS validation Rpt Part2-2 RF Exposure Info pdf 4.32 MiB July 06 2022 / July 21 2022
1 2 3 4 5 6 7 8 Part 2 TAS validation Tsup Test Setup Photos pdf 492.33 KiB July 06 2022 / January 18 2023 delayed release

frequency equipment class purpose
1 2022-07-21 859 ~ 894 CXX - Communications Rcvr for use w/ licensed Tx and CBs Original Equipment
2 5955 ~ 7095 6XD - 15E 6 GHz Low Power Indoor Client
3 3750 ~ 3930 PCE - PCS Licensed Transmitter held to ear
4 2412 ~ 2462 DTS - Digital Transmission System
5 JBP - Part 15 Class B Computing Device Peripheral
6 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter
7 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
8 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 8 Effective 2022-07-21
1 2 3 4 5 6 7 8 Applicant's complete, legal business name Motorola Mobility LLC
1 2 3 4 5 6 7 8 FCC Registration Number (FRN) 0004321311
1 2 3 4 5 6 7 8 Physical Address Motorola Mobility LLC 222 W. Merchandise Mart Plaza
1 2 3 4 5 6 7 8 Motorola Mobility LLC
1 2 3 4 5 6 7 8 Chicago, IL
1 2 3 4 5 6 7 8 United States
app s TCB Information
1 2 3 4 5 6 7 8 TCB Application Email Address K******@sporton-usa.com
1 2 3 4 5 6 7 8 TCB Scope A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 7 8 A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 8 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
app s FCC ID
1 2 3 4 5 6 7 8 Grantee Code IHD
1 2 3 4 5 6 7 8 Equipment Product Code T56AF5
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 8 Name J****** N********
1 2 3 4 5 6 7 8 Title Director Product Compliance
1 2 3 4 5 6 7 8 Telephone Number 847-6********
1 2 3 4 5 6 7 8 Fax Number 847-6********
1 2 3 4 5 6 7 8 E-mail n******@motorola.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 8 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)01/18/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 8 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 8 Equipment ClassCXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 7 8 6XD - 15E 6 GHz Low Power Indoor Client
1 2 3 4 5 6 7 8 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 8 DTS - Digital Transmission System
1 2 3 4 5 6 7 8 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 7 8 DXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 8 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 8 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 8 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Mobile Cellular Phone
1 2 3 4 5 6 7 8 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 8 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 8 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 8 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 8 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 8 Grant CommentsOutput Power is EIRP. Device operates with specific antennas in MIMO configurations as described in this filing. RF exposure compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. This device supports 20, 40, 80 and 160 MHz modes. Device 6 GHz operation is intended for indoor use only.
1 2 3 4 5 6 7 8 Output Power is EIRP and ERP for above and below 1 GHz, respectively, except for Part 90 LTE Band 26 emissions, which are conducted. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.25 W/kg, 1.35 W/kg, 1.39 W/kg, 1.59 W/kg and 3.31 W/kg, respectively. This device supports LTE of 1.4, 3, 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Bands 2, 4, 25 and 66; LTE of 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Band 7; LTE of 1.4, 3, 5 and 10 MHz bandwidth modes for FDD LTE Bands 5 and 12; LTE of 5 and 10 MHz bandwidth modes for FDD LTE Bands 13 and 17; LTE of 1.4, 3, 5, 10 and 15 MHz bandwidth modes for FDD LTE Band 26; and LTE of 5, 10, 15 and 20 MHz bandwidth modes for TDD LTE Bands 38, 41 and 42. This device also supports LTE uplink carrier aggregation as described in this filing. This device also supports Frequency Range 1 5G NR modes of 5, 10, 15 and 20 MHz bandwidth for FDD Band n5; 5, 10, 15, 20, 25, 30 and 40 MHz bandwidth for FDD Band n7; 20, 30 and 40 MHz bandwidth for TDD Band n38; 20, 30, 40, 50, 60, 80, 90 and 100 MHz bandwidth modes for TDD Band n41; 5, 10, 15, 20, 30 and 40MHz bandwidth modes for FDD Band n66;and 20, 30, 40, 50, 60, 70, 80, 90 and 100 MHz bandwidth modes for TDD Bands n77 and n78. Frequency Range 1 5G NR ENDC modes are supported by this device, as described in this filing. HAC Rating: M4 T3: 2011. T-coil 5G sub 6 bands appraised as equivalent LTE connections. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 4 5 6 7 8 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router) and simultaneous transmission exposure conditions are 1.41 W/kg, 1.04 W/kg, 0.23 W/kg and 1.55 W/kg, respectively. HAC Rating: M4 T3: 2011. This device supports 20 MHz and 40 MHz bandwidths modes.
1 2 3 4 5 6 7 8 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.19 W/kg, 1.17 W/kg, 0.38 W/kg, 1.58 W/kg and 2.46 W/kg, respectively. HAC Rating: M4 T3: 2011. This device supports 20, 40, 80 and 160 MHz bandwidths modes.
1 2 3 4 5 6 7 8 Output Power listed is the maximum conducted output power. SAR compliance for body- worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router) and simultaneous transmission exposure conditions are 0.15 W/kg, < 0.10 W/kg, < 0.10 W/kg and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 8 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 8 Firm Name Sporton International Inc. (Shenzhen)
1 2 3 4 5 6 7 8 Name R**** C****
1 2 3 4 5 6 7 8 Telephone Number +86 0********
1 2 3 4 5 6 7 8 E-mail R******@sporton-lab.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15B CC 859 894
1 2 15B CC 729 756
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15E CC EP MO 5955.00000000 7095.00000000 0.0145000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 22H HC 824.2 848.8 0.4207 2.5 ppm 243KGXW
3 2 22H HC 824.2 848.8 0.103 2.5 ppm 248KG7W
3 3 22H HC 826.4 846.6 0.0473 2.5 ppm 4M14F9W
3 4 24E HC 1850.2 1909.8 1.052 2.5 ppm 242KGXW
3 5 24E HC 1850.2 1909.8 0.4046 2.5 ppm 247KG7W
3 6 24E HC 1852.4 1907.6 0.2051 2.5 ppm 4M15F9W
3 7 27 HC 1712.4 1752.6 0.1334 2.5 ppm 4M15F9W
3 8 24E HC 1860 1900 0.1932 2.5 ppm 17M9G7D
3 9 24E HC 1860 1900 0.1517 2.5 ppm 17M9W7D
3 1 24E HC 1860 1905 0.1941 2.5 ppm 17M9G7D
3 11 24E HC 1860 1905 0.1496 2.5 ppm 17M9W7D
3 12 22H HC 829 844 0.044 2.5 ppm 9M09G7D
3 13 22H HC 829 844 0.0355 2.5 ppm 9M05W7D
3 14 22H HC 831.5 841.5 0.0443 2.5 ppm 13M4G7D
3 15 22H HC 831.5 841.5 0.0344 2.5 ppm 13M5W7D
3 16 27 HC 1720 1745 0.1309 2.5 ppm 18M0G7D
3 17 27 HC 1720 1745 0.1038 2.5 ppm 18M0W7D
3 18 27 HC 1720 1770 0.1321 2.5 ppm 18M0G7D
3 19 27 HC 1720 1770 0.1028 2.5 ppm 18M0W7D
3 2 27 HC 704 711 0.0592 2.5 ppm 9M03G7D
3 21 27 HC 704 711 0.0463 2.5 ppm 9M07W7D
3 22 27 HC 782 782 0.0568 2.5 ppm 9M03G7D
3 23 27 HC 782 782 0.0448 2.5 ppm 9M01W7D
3 24 27 HC 709 711 0.0581 2.5 ppm 9M03G7D
3 25 27 HC 709 711 0.0465 2.5 ppm 9M07W7D
3 26 9 HC 821.5 821.5 0.1954 2.5 ppm 13M5G7D
3 27 9 HC 821.5 821.5 0.1549 2.5 ppm 13M4W7D
3 28 9 HC 816.5 821.5 0.1968 2.5 ppm 4M50G7D
3 29 9 HC 814.7 823.3 0.156 2.5 ppm 1M10W7D
3 3 27 HC 2510 2560 0.1183 2.5 ppm 17M9G7D
3 31 27 HC 2510 2560 0.0938 2.5 ppm 17M9W7D
3 32 27 HC 2580 2610 0.2158 2.5 ppm 18M0G7D
3 33 27 HC 2580 2610 0.1837 2.5 ppm 18M0W7D
3 34 27 HC 2506 2680 0.2265 2.5 ppm 18M0G7D
3 35 27 HC 2506 2680 0.1841 2.5 ppm 18M0W7D
3 36 27 HC 2510 2560 0.1233 2.5 ppm 38M0G7D
3 37 27 HC 2510 2560 0.1334 2.5 ppm 37M7W7D
3 38 27 HC 2510 2562.2 0.1259 2.5 ppm 32M7G7D
3 39 27 HC 2510 2562.2 0.1469 2.5 ppm 33M1W7D
3 4 27 HC 2506 2680 0.1245 2.5 ppm 37M8G7D
3 41 27 HC 2506 2680 0.1531 2.5 ppm 37M8W7D
3 42 27 HC 2506 2682.2 0.1435 2.5 ppm 32M9G7D
3 43 27 HC 2501.5 2680 0.1574 2.5 ppm 28M2W7D
3 44 27 HC 3460 3540 0.103 2.5 ppm 17M9G7D
3 45 27 HC 3460 3540 0.0826 2.5 ppm 17M9W7D
3 46 22H HC 834 839 0.0372 2.5 ppm 18M9G7D
3 47 22H HC 834 839 0.0284 2.5 ppm 18M9W7D
3 48 22H HC 826.5 846.5 0.0295 2.5 ppm 4M49W7D
3 49 27 HC 2520 2550 0.1199 2.5 ppm 38M6G7D
3 5 27 HC 2520 2550 0.0908 2.5 ppm 38M5W7D
3 51 27 HC 2507.5 2562.5 0.0946 2.5 ppm 14M1W7D
3 52 27 HC 2590 2600 0.1361 2.5 ppm 37M8G7D
3 53 27 HC 2590 2600 0.0869 2.5 ppm 37M9W7D
3 54 27 HC 2546.01 2640 0.151 2.5 ppm 97M6G7D
3 55 27 HC 2546.01 2640 0.0916 2.5 ppm 97M7W7D
3 56 27 HC 2526 2659.98 0.0971 2.5 ppm 57M9W7D
3 57 27 HC 1730 1760 0.1324 2.5 ppm 38M7G7D
3 58 27 HC 1730 1760 0.1086 2.5 ppm 38M6W7D
3 59 27 HC 3750 3930 0.1042 2.5 ppm 97M3G7D
3 6 27 HC 3750 3930 0.0646 2.5 ppm 97M7W7D
3 61 27 HC 3720 3960 0.0701 2.5 ppm 37M9W7D
3 62 27 HC 3750 3750 0.1563 2.5 ppm 97M4G7D
3 63 27 HC 3750 3750 0.1213 2.5 ppm 97M5W7D
3 64 27 HC 3720 3780 0.1306 2.5 ppm 37M8W7D
3 65 27 HC 3500.01 3500.01 0.1663 2.5 ppm 97M4G7D
3 66 27 HC 3500.01 3500.01 0.1169 2.5 ppm 97M5W7D
3 67 27 HC 3465 3534.99 0.1337 2.5 ppm 27M9W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 2402 2480 0.0086
4 2 15C CC HC MO 2412 2462 0.6012
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 15C CC 13.56000000 13.56000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15E CC HC MO 5180 5240 0.0968
7 2 15E CC HC MO 5250 5250 0.0518
7 3 15E CC HC MO 5260 5320 0.0955
7 4 15E CC HC MO 5500 5720 0.0791
7 5 15E CC HC MO 5745 5825 0.0883
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
8 1 15C CC 2402.00000000 2480.00000000 0.0138000

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC