FCC ID: IHDT56AL2 Mobile Cellular Phone

by: Motorola Mobility LLC latest update: 2023-02-26 model: T56AL2

Eight grants have been issued under this FCC ID on 02/26/2023 (this is one of two hundred and nineteen releases in 2023 for this grantee). Public details available include internal & external photos, frequency information, and manuals. some products also feature user submitted or linked password defaults, troubleshooting guides, drivers, instructions, & warrantee terms.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 8 GSG Users Manual pdf 1.04 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 LI Users Manual pdf 1.21 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part1-3 Internal Photos pdf 5.52 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part2-3 Internal Photos pdf 5.53 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part3-3 Internal Photos pdf 5.26 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 ExPho External Photos pdf 2.96 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 ID Label/Location Info pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 ID Label/Location Info pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 ID Label/Location Info pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Block Diagram Block Diagram pdf February 02 2023 confidential
1 2 3 4 5 6 7 8 OD SampleProduct Equality Declaration Operational Description pdf February 02 2023 confidential
1 2 3 4 5 6 7 8 PartsLst Parts List/Tune Up Info pdf February 02 2023 confidential
1 2 3 4 5 6 7 8 SchemDic Schematics pdf February 02 2023 confidential
1 2 3 4 5 6 7 8 Test Report pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Tsup JBP Test Setup Photos pdf 358.99 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 cvrltr Certification 2.911d5 Attestation Statements pdf 135.64 KiB February 23 2023 / February 26 2023
1 2 3 4 5 6 7 8 cvrltr Certification 2.911d7 Attestation Statements pdf 145.33 KiB February 23 2023 / February 26 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt CXX Test Report pdf 871.74 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 5G Sub-6GHz VoIP OTT and VONR HAC Attestation Cover Letter(s) pdf 134.45 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Test Report pdf 1.31 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix A Test Report pdf 749.14 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix B Part1-2 Test Report pdf 3.90 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix B Part2-2 Test Report pdf 3.47 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix C Test Report pdf 5.65 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix E Test Report pdf 1.36 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil Test Report pdf 1.29 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil VOIP Appendix A Test Report pdf 2.07 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Test Report pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil VOIP r1 Test Report pdf 865.85 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil Appendix A Test Report pdf 4.83 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil Appendix B Test Report pdf 2.39 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 2G,3G Part1-2 Test Report pdf 5.50 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 2G,3G Part2-2 Test Report pdf 1.30 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27D n30 Test Report pdf 5.24 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27O n77.78 Part1-2 r1 Test Report pdf 5.62 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27O n77.78 Part2-2 Test Report pdf 2.89 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27Q n77.78 Part1-2 r1 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27Q n77.78 Part2-2 Test Report pdf 2.31 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 90R n14 Test Report pdf 5.30 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 90S n26 Test Report pdf 3.92 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part1-4 Test Report pdf 5.57 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part2-4 Test Report pdf 5.46 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part3-4 Test Report pdf 5.56 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part4-4 Test Report pdf 3.32 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part1-5 Test Report pdf 5.42 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part2-5 Test Report pdf 5.39 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part3-5 Test Report pdf 5.46 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part4-5 Test Report pdf 5.51 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part5-5 Test Report pdf 3.64 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 27D B30 Part1-2 Test Report pdf 5.49 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 27D B30 Part2-2 Test Report pdf 905.18 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90R B14 Part1-2 Test Report pdf 5.38 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90R B14 Part2-2 Test Report pdf 1.43 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90S B26 Part1-2 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90S B26 Part2-2 Test Report pdf 4.14 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part10-18 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part11-18 Test Report pdf 5.53 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part7-18 Test Report pdf 5.50 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part8-18 Test Report pdf 5.55 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part9-18 Test Report pdf 5.38 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part1-19 Test Report pdf 5.55 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part10-19 Test Report pdf 5.49 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part11-19 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part12-19 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part13-19 Test Report pdf 5.38 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part14-19 Test Report pdf 5.39 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part15-19 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part16-19 Test Report pdf 5.54 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part17-19 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part18-19 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part19-19 Test Report pdf 1.79 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part2-19 Test Report pdf 5.57 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part3-19 Test Report pdf 5.55 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part4-19 Test Report pdf 5.51 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part5-19 Test Report pdf 5.50 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part6-19 Test Report pdf 5.56 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part7-19 Test Report pdf 5.51 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part8-19 Test Report pdf 5.52 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part9-19 Test Report pdf 5.58 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Tsup HAC RF Test Setup Photos pdf 196.94 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup HAC T-coil Test Setup Photos pdf 196.96 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup HAC T-coil VOIP Test Setup Photos pdf 240.47 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 2G,3G Test Setup Photos pdf 393.56 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 27D n30 Test Setup Photos pdf 276.77 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 27O n77.78 Test Setup Photos pdf 277.89 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 27Q n77.78 Test Setup Photos pdf 278.34 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 90R n14 Test Setup Photos pdf 261.39 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 90S n26 Test Setup Photos pdf 276.11 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G n2.5.12.13.25.26.71 Test Setup Photos pdf 613.25 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G n7.38.41.66.70 Test Setup Photos pdf 276.94 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE 27D B30 Test Setup Photos pdf 276.88 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE 90R B14 Test Setup Photos pdf 260.65 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE 90S B26 Test Setup Photos pdf 276.88 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE B12.13.17.71.7.7C.38.41.41C Test Setup Photos pdf 594.78 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE B2.4.5.5B.25.26.66.66B.66C Test Setup Photos pdf 446.50 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE Inter band CA Test Setup Photos pdf 288.39 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 cvrltr Declaration Letter for HAC Cover Letter(s) pdf 106.12 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Part 2 TAS validation Tsup Test Setup Photos pdf 371.80 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Part1 SAR Tsup Test Setup Photos pdf 1.67 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 GSG Users Manual pdf 1.04 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 LI Users Manual pdf 1.21 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part1-3 Internal Photos pdf 5.52 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part2-3 Internal Photos pdf 5.53 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 InPho Part3-3 Internal Photos pdf 5.26 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 ExPho External Photos pdf 2.96 MiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 ID Label/Location Info pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 ID Label/Location Info pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 ID Label/Location Info pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Test Report pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Tsup JBP Test Setup Photos pdf 358.99 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 cvrltr Certification 2.911d5 Attestation Statements pdf 135.64 KiB February 23 2023 / February 26 2023
1 2 3 4 5 6 7 8 cvrltr Certification 2.911d7 Attestation Statements pdf 145.33 KiB February 23 2023 / February 26 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Cover Letter(s) pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt CXX Test Report pdf 871.74 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 5G Sub-6GHz VoIP OTT and VONR HAC Attestation Cover Letter(s) pdf 134.45 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Test Report pdf 1.31 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix A Test Report pdf 749.14 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix B Part1-2 Test Report pdf 3.90 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix B Part2-2 Test Report pdf 3.47 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix C Test Report pdf 5.65 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC RF Appendix E Test Report pdf 1.36 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil Test Report pdf 1.29 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil VOIP Appendix A Test Report pdf 2.07 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Test Report pdf February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil VOIP r1 Test Report pdf 865.85 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil Appendix A Test Report pdf 4.83 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt HAC T-coil Appendix B Test Report pdf 2.39 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 2G,3G Part1-2 Test Report pdf 5.50 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 2G,3G Part2-2 Test Report pdf 1.30 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27D n30 Test Report pdf 5.24 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27O n77.78 Part1-2 r1 Test Report pdf 5.62 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27O n77.78 Part2-2 Test Report pdf 2.89 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27Q n77.78 Part1-2 r1 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 27Q n77.78 Part2-2 Test Report pdf 2.31 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 90R n14 Test Report pdf 5.30 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G 90S n26 Test Report pdf 3.92 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part1-4 Test Report pdf 5.57 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part2-4 Test Report pdf 5.46 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part3-4 Test Report pdf 5.56 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n2.5.12.13.25.26.71 Part4-4 Test Report pdf 3.32 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part1-5 Test Report pdf 5.42 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part2-5 Test Report pdf 5.39 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part3-5 Test Report pdf 5.46 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part4-5 Test Report pdf 5.51 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE 5G n7.38.41.66.70 Part5-5 Test Report pdf 3.64 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 27D B30 Part1-2 Test Report pdf 5.49 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 27D B30 Part2-2 Test Report pdf 905.18 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90R B14 Part1-2 Test Report pdf 5.38 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90R B14 Part2-2 Test Report pdf 1.43 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90S B26 Part1-2 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE 90S B26 Part2-2 Test Report pdf 4.14 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part10-18 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part11-18 Test Report pdf 5.53 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part7-18 Test Report pdf 5.50 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part8-18 Test Report pdf 5.55 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B12.13.17.71.7.7C.38.41.41C Part9-18 Test Report pdf 5.38 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part1-19 Test Report pdf 5.55 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part10-19 Test Report pdf 5.49 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part11-19 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part12-19 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part13-19 Test Report pdf 5.38 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part14-19 Test Report pdf 5.39 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part15-19 Test Report pdf 5.59 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part16-19 Test Report pdf 5.54 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part17-19 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part18-19 Test Report pdf 5.48 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part19-19 Test Report pdf 1.79 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part2-19 Test Report pdf 5.57 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part3-19 Test Report pdf 5.55 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part4-19 Test Report pdf 5.51 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part5-19 Test Report pdf 5.50 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part6-19 Test Report pdf 5.56 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part7-19 Test Report pdf 5.51 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part8-19 Test Report pdf 5.52 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 TestRpt PCE LTE B2.4.5.5B.25.26.66.66B.66C Part9-19 Test Report pdf 5.58 MiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Tsup HAC RF Test Setup Photos pdf 196.94 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup HAC T-coil Test Setup Photos pdf 196.96 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup HAC T-coil VOIP Test Setup Photos pdf 240.47 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 2G,3G Test Setup Photos pdf 393.56 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 27D n30 Test Setup Photos pdf 276.77 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 27O n77.78 Test Setup Photos pdf 277.89 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 27Q n77.78 Test Setup Photos pdf 278.34 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 90R n14 Test Setup Photos pdf 261.39 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G 90S n26 Test Setup Photos pdf 276.11 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G n2.5.12.13.25.26.71 Test Setup Photos pdf 613.25 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE 5G n7.38.41.66.70 Test Setup Photos pdf 276.94 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE 27D B30 Test Setup Photos pdf 276.88 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE 90R B14 Test Setup Photos pdf 260.65 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE 90S B26 Test Setup Photos pdf 276.88 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE B12.13.17.71.7.7C.38.41.41C Test Setup Photos pdf 594.78 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE B2.4.5.5B.25.26.66.66B.66C Test Setup Photos pdf 446.50 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Tsup PCE LTE Inter band CA Test Setup Photos pdf 288.39 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 cvrltr Declaration Letter for HAC Cover Letter(s) pdf 106.12 KiB February 02 2023 / February 26 2023
1 2 3 4 5 6 7 8 Part 2 TAS validation Tsup Test Setup Photos pdf 371.80 KiB February 02 2023 / August 26 2023 delayed release
1 2 3 4 5 6 7 8 Part1 SAR Tsup Test Setup Photos pdf 1.67 MiB February 02 2023 / August 26 2023 delayed release

frequency equipment class purpose
1 2023-02-26 JBP - Part 15 Class B Computing Device Peripheral Original Equipment
2 859 ~ 894 CXX - Communications Rcvr for use w/ licensed Tx and CBs
3 3750 ~ 3930 PCE - PCS Licensed Transmitter held to ear
4 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter
5 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
6 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
7 2412 ~ 2462 DTS - Digital Transmission System
8 3570 ~ 3679.98 CBE - Citizens Band End User Devices

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 8 Effective 2023-02-26
1 2 3 4 5 6 7 8 Applicant's complete, legal business name Motorola Mobility LLC
1 2 3 4 5 6 7 8 FCC Registration Number (FRN) 0004321311
1 2 3 4 5 6 7 8 Physical Address Motorola Mobility LLC
1 2 3 4 5 6 7 8 Chicago, Illinois 60654
1 2 3 4 5 6 7 8 United States
app s TCB Information
1 2 3 4 5 6 7 8 TCB Application Email Address K******@sporton-usa.com
1 2 3 4 5 6 7 8 TCB Scope A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 7 8 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 7 8 A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 8 B2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95, 97, & 101 (all below 3 GHz)
app s FCC ID
1 2 3 4 5 6 7 8 Grantee Code IHD
1 2 3 4 5 6 7 8 Equipment Product Code T56AL2
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 8 Name J****** N****
1 2 3 4 5 6 7 8 Title Director Product Compliance
1 2 3 4 5 6 7 8 Telephone Number 847-6********
1 2 3 4 5 6 7 8 Fax Number 847-6********
1 2 3 4 5 6 7 8 E-mail n******@motorola.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 8 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)08/26/2023
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 8 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 8 Equipment ClassJBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 7 8 CXX - Communications Rcvr for use w/ licensed Tx and CBs
1 2 3 4 5 6 7 8 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 8 DXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 8 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 8 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 8 DTS - Digital Transmission System
1 2 3 4 5 6 7 8 CBE - Citizens Band End User Devices
1 2 3 4 5 6 7 8 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Mobile Cellular Phone
1 2 3 4 5 6 7 8 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 8 No
1 2 3 4 5 6 7 8 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 8 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 8 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 8 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 8 Grant CommentsOutput Power is EIRP and ERP for above and below 1 GHz, respectively, except for Part 90 LTE Band 26 and 5G n26 emissions, which are conducted. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 0.64 W/kg, 1.19 W/kg, 1.19 W/kg, 1.58 W/kg and 2.79 W/kg, respectively. This device supports LTE of 1.4, 3, 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Bands 2, 4, 25 and 66; LTE of 5, 10, 15 and 20 MHz bandwidth modes for FDD LTE Bands 7 and 71; LTE of 1.4, 3, 5 and 10 MHz bandwidth modes for FDD LTE Bands 5 and 12; LTE of 5 and 10 MHz bandwidth modes for FDD LTE Bands 13, 14, 17 and 30; LTE of 1.4, 3, 5, 10 and 15 MHz bandwidth modes for FDD LTE Band 26; and LTE of 5, 10, 15 and 20 MHz bandwidth modes for TDD LTE Bands 38 and 41. This device also supports LTE uplink carrier aggregation as described in this filing. This device also supports Frequency Range 1 5G NR modes of 5, 10, 15 and 20MHz bandwidth modes for FDD Bands n2, n5, n25, n26 and n71; 5, 10, 15, 20, 25, 30 and 40 MHz bandwidth for FDD Band n7; 5, 10, 15, 20, 30 and 40 MHz bandwidth for FDD Band n66; 5, 10 and 15 MHz bandwidth for FDD Bands n12 and n70; 5 and 10 MHz bandwidth for FDD Bands n13, n14 and n30; 10, 15, 20, 30 and 40 MHz bandwidth modes for TDD Band n38; 20, 30, 40, 50, 60, 70, 80, 90 and 100 MHz bandwidth modes for TDD Band n41, and 10, 15, 20, 30, 40, 50, 60, 70, 80, 90 and 100 MHz bandwidth modes for TDD Bands n77 and n78. Frequency Range 1 5G NR ENDC modes are supported by this device, as described in this filing. HAC Rating: M3 T3: 2011. T-coil 5G sub 6 bands appraised as equivalent LTE connections. This device contains functions that are not operational in U.S. Territories; this filing is applicable only for U.S. operations.
1 2 3 4 5 6 7 8 The highest SAR values for product specific (10g SAR) and simultaneous transmission conditions are < 0.10 W/kg and 3.90 W/kg.
1 2 3 4 5 6 7 8 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.19 W/kg, 1.18 W/kg, 0.42 W/kg, 1.58 W/kg and 2.99 W/kg, respectively. HAC Rating: M3 T3: 2011. This device supports 20, 40 and 80 MHz bandwidths modes.
1 2 3 4 5 6 7 8 Output Power listed is the maximum conducted output power. SAR compliance for body- worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router) and simultaneous transmission exposure conditions are 0.34 W/kg, 0.25 W/kg, < 0.10 W/kg and 1.58 W/kg, respectively.
1 2 3 4 5 6 7 8 Output Power listed is the maximum conducted output power. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 1.03 W/kg, 1.18 W/kg, 0.44 W/kg, 1.58 W/kg and 2.91 W/kg, respectively. HAC Rating: M3 T3: 2011. This device supports 20 MHz and 40 MHz bandwidths modes.
1 2 3 4 5 6 7 8 Output Power is EIRP. SAR compliance for body-worn operating configurations is limited to belt-clips and holsters that have no metallic components in the assembly and cause the device to operate with the minimum separation distance of 5.0 mm, as described in this filing. End-users must be informed of the body- worn operating requirements for satisfying RF exposure compliance. The highest reported SAR for head, body-worn accessory, product specific (wireless router), simultaneous transmission and product specific (10g SAR) exposure conditions are 0.69 W/kg, 1.08 W/kg, 1.08 W/kg, 1.58 W/kg and 1.97 W/kg, respectively. This device supports LTE of 5, 10, 15 and 20 MHz bandwidth modes for TDD LTE Band 48. This device also supports LTE uplink carrier aggregation as described in this filing. This device also supports Frequency Range 1 5G NR modes of 10, 20, 30 and 40MHz bandwidth modes for TDD Band n48. HAC Rating: M3 T3: 2011. T-coil 5G sub 6 bands appraised as equivalent LTE connections.
1 2 3 4 5 6 7 8 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 8 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 8 Firm Name Sporton International Inc. (Shenzhen)
1 2 3 4 5 6 7 8 Name R**** C********
1 2 3 4 5 6 7 8 Telephone Number +86 0********
1 2 3 4 5 6 7 8 E-mail R******@sporton-lab.com
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15B CC 859 894
2 2 15B CC 729 756
2 3 15B CC 758 768
2 4 15B CC 617 652
2 5 15B CC 717 728
2 6 15B CC 88 108
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 22H HC 824.2 848.8 0.2123 2.5 ppm 244KGXW
3 2 22H HC 824.2 848.8 0.0501 2.5 ppm 247KG7W
3 3 22H HC 826.4 846.6 0.0249 2.5 ppm 4M13F9W
3 4 24E HC 1850.2 1909.8 0.4169 2.5 ppm 244KGXW
3 5 24E HC 1850.2 1909.8 0.134 2.5 ppm 242KG7W
3 6 24E HC 1852.4 1907.6 0.0964 2.5 ppm 4M15F9W
3 7 27 HC 1712.4 1752.6 0.0855 2.5 ppm 4M16F9W
3 8 24E HC 1860 1900 0.0957 2.5 ppm 17M9G7D
3 9 24E HC 1860 1900 0.0953 2.5 ppm 17M9W7D
3 1 24E HC 1860 1905 0.0957 2.5 ppm 17M9G7D
3 11 24E HC 1860 1905 0.0953 2.5 ppm 17M9W7D
3 12 27 HC 1720 1745 0.0832 2.5 ppm 17M9G7D
3 13 27 HC 1720 1745 0.0828 2.5 ppm 18M0W7D
3 14 22H HC 829 844 0.0241 2.5 ppm 9M07G7D
3 15 22H HC 829 844 0.0241 2.5 ppm 9M05W7D
3 16 22H HC 826.5 846.5 0.0245 2.5 ppm 4M52G7D
3 17 22H HC 831.5 841.5 0.0246 2.5 ppm 13M5G7D
3 18 22H HC 831.5 841.5 0.0244 2.5 ppm 13M5W7D
3 19 27 HC 1720 1770 0.0832 2.5 ppm 17M9G7D
3 2 27 HC 1720 1770 0.0828 2.5 ppm 18M0W7D
3 21 22H HC 829 844 0.0292 2.5 ppm 18M8G7D
3 22 22H HC 829 844 0.0278 2.5 ppm 18M8W7D
3 23 27 HC 1715 1775 0.0881 2.5 ppm 18M9G7D
3 24 27 HC 1715 1775 0.0843 2.5 ppm 18M9W7D
3 25 27 HC 1720 1770 0.0847 2.5 ppm 38M0G7D
3 26 27 HC 1720 1770 0.0782 2.5 ppm 38M0W7D
3 27 27 HC 2510 2560 0.0632 2.5 ppm 17M9G7D
3 28 27 HC 2510 2560 0.0515 2.5 ppm 17M9W7D
3 29 27 HC 704 711 0.0234 2.5 ppm 9M05G7D
3 3 27 HC 704 711 0.0234 2.5 ppm 9M07W7D
3 31 27 HC 782 782 0.0207 2.5 ppm 8M99G7D
3 32 27 HC 782 782 0.0206 2.5 ppm 9M03W7D
3 33 27 HC 709 711 0.0232 2.5 ppm 9M05G7D
3 34 27 HC 709 711 0.0231 2.5 ppm 9M07W7D
3 35 27 HC 2580 2610 0.0783 2.5 ppm 17M9G7D
3 36 27 HC 2580 2610 0.076 2.5 ppm 18M0W7D
3 37 27 HC 2506 2680 0.1563 2.5 ppm 17M9G7D
3 38 27 HC 2506 2680 0.1535 2.5 ppm 18M0W7D
3 39 27 HC 673 688 0.0223 2.5 ppm 17M9G7D
3 4 27 HC 673 688 0.0221 2.5 ppm 17M8W7D
3 41 27 HC 2510 2560 0.0705 2.5 ppm 37M9G7D
3 42 27 HC 2510 2560 0.0658 2.5 ppm 37M8W7D
3 43 27 HC 2506 2680 0.1067 2.5 ppm 37M6G7D
3 44 27 HC 2506 2680 0.1052 2.5 ppm 37M7W7D
3 45 9 HC 824 824 0.1968 2.5 ppm 13M4G7D
3 46 9 HC 824 824 0.1901 2.5 ppm 13M5W7D
3 47 9 HC 814.7 823.3 0.2009 2.5 ppm 1M11G7D
3 48 9 HC 814.7 823.3 0.1982 2.5 ppm 1M11W7D
3 49 9 HC 793 793 0.0217 1.25 ppm 8M97G7D
3 5 9 HC 793 793 0.0215 1.25 ppm 9M01W7D
3 51 27 HC 2310 2310 0.0624 2.5 ppm 9M01G7D
3 52 27 HC 2310 2310 0.0619 2.5 ppm 9M03W7D
3 53 24E HC 1860 1900 0.094 2.5 ppm 18M9G7D
3 54 24E HC 1860 1900 0.091 2.5 ppm 18M9W7D
3 55 24E HC 1852.5 1907.5 0.0929 2.5 ppm 4M47W7D
3 56 24E HC 1860 1905 0.0962 2.5 ppm 18M9G7D
3 57 24E HC 1860 1905 0.0906 2.5 ppm 18M9W7D
3 58 24E HC 1852.5 1912.5 0.0929 2.5 ppm 4M47W7D
3 59 22H HC 834 839 0.0278 2.5 ppm 18M9G7D
3 6 22H HC 834 839 0.0271 2.5 ppm 18M9W7D
3 61 27 HC 706.5 708.5 0.0286 2.5 ppm 14M1G7D
3 62 27 HC 706.5 708.5 0.0233 2.5 ppm 14M1W7D
3 63 27 HC 782 782 0.021 2.5 ppm 9M26G7D
3 64 27 HC 782 782 0.0173 2.5 ppm 9M28W7D
3 65 27 HC 673 688 0.0257 2.5 ppm 18M9G7D
3 66 27 HC 673 688 0.0238 2.5 ppm 18M9W7D
3 67 27 HC 1730 1760 0.0796 2.5 ppm 38M7G7D
3 68 27 HC 1730 1760 0.0687 2.5 ppm 38M6W7D
3 69 27 HC 1725 1765 0.0701 2.5 ppm 28M6W7D
3 7 27 HC 2520 2550 0.0605 2.5 ppm 38M6G7D
3 71 27 HC 2520 2550 0.0535 2.5 ppm 38M6W7D
3 72 27 HC 2507.5 2562.5 0.0537 2.5 ppm 14M1W7D
3 73 27 HC 2590 2600 0.0843 2.5 ppm 37M8G7D
3 74 27 HC 2590 2600 0.0678 2.5 ppm 37M8W7D
3 75 27 HC 2546.01 2640 0.1365 2.5 ppm 97M6G7D
3 76 27 HC 2546.01 2640 0.1104 2.5 ppm 97M6W7D
3 77 27 HC 1702.5 1702.5 0.0782 2.5 ppm 14M1G7D
3 78 27 HC 1702.5 1702.5 0.0718 2.5 ppm 14M1W7D
3 79 27 HC 1697.5 1707.5 0.0769 2.5 ppm 4M50W7D
3 8 27 HC 3750 3930 0.1884 2.5 ppm 97M5G7D
3 81 27 HC 3750 3930 0.1652 2.5 ppm 97M7W7D
3 82 27 HC 3720 3960 0.1807 2.5 ppm 37M8W7D
3 83 27 HC 3750 3750 0.0942 2.5 ppm 97M5G7D
3 84 27 HC 3750 3750 0.0841 2.5 ppm 97M7W7D
3 85 27 HC 3720 3780 0.0938 2.5 ppm 37M8W7D
3 86 27 HC 3500.01 3500.01 0.1919 2.5 ppm 97M4G7D
3 87 27 HC 3500.01 3500.01 0.1791 2.5 ppm 97M5W7D
3 88 27 HC 3470.01 3529.98 0.191 2.5 ppm 37M9W7D
3 89 9 HC 793 793 0.0195 1.25 ppm 9M27G7D
3 9 9 HC 793 793 0.0172 1.25 ppm 9M28W7D
3 91 9 HC 790.5 795.5 0.0183 1.25 ppm 4M49W7D
3 92 9 HC 824 824 0.2275 2.5 ppm 18M9G7D
3 93 9 HC 824 824 0.2037 2.5 ppm 18M9W7D
3 94 27 HC 2310 2310 0.0533 2.5 ppm 9M28G7D
3 95 27 HC 2310 2310 0.0425 2.5 ppm 9M28W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15C CC 13.56000000 13.56000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15E CC HC 5180 5240 0.1239
5 2 15E CC HC 5260 5320 0.1172
5 3 15E CC HC 5500 5700 0.1114
5 4 15E CC HC 5745 5825 0.1148
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 15C CC 2402.00000000 2480.00000000 0.0155000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 15C CC 2402 2480 0.0042
7 2 15C CC HC 2412 2462 0.3698
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
8 1 96 EP HC 3560 3690 0.075 2.5 ppm 17M9G7D
8 2 96 EP HC 3560 3690 0.0735 2.5 ppm 18M0W7D
8 3 96 EP HC 3560 3690 0.0804 2.5 ppm 37M6G7D
8 4 96 EP HC 3560 3690 0.0791 2.5 ppm 38M0W7D
8 5 96 EP HC 3570 3679.98 0.0682 2.5 ppm 37M8G7D
8 6 96 EP HC 3570 3679.98 0.0528 2.5 ppm 37M9W7D

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC