all | frequencies |
|
|
|
|
exhibits | applications |
---|---|---|---|---|---|---|---|
manual | photos | label |
app s | submitted / available | |||||||
---|---|---|---|---|---|---|---|---|
1 |
|
User Manual | Users Manual | 1.58 MiB | September 07 2022 | |||
1 |
|
Internal photos | Internal Photos | 1.72 MiB | September 07 2022 | |||
1 |
|
External photos | External Photos | 1.35 MiB | September 07 2022 | |||
1 |
|
Label | ID Label/Location Info | 423.53 KiB | September 07 2022 | |||
1 |
|
Antenna specification | Test Report | 159.49 KiB | September 07 2022 | |||
1 |
|
Appendix A for 433MHz | Test Report | 1.13 MiB | September 07 2022 | |||
1 |
|
Applicant Declaration Letter | Cover Letter(s) | 216.47 KiB | September 07 2022 | |||
1 |
|
Auth letter | Cover Letter(s) | 114.34 KiB | September 07 2022 | |||
1 | Block diagram | Block Diagram | September 07 2022 | confidential | ||||
1 |
|
Confidentiality FCC | Cover Letter(s) | 138.07 KiB | September 07 2022 | |||
1 | Operational Description | Operational Description | September 07 2022 | confidential | ||||
1 | Schematic | Schematics | September 07 2022 | confidential | ||||
1 |
|
Test report | Test Report | 1.10 MiB | September 07 2022 | |||
1 |
|
Test setup photo | Test Setup Photos | 876.09 KiB | September 07 2022 |
1 | User Manual | Users Manual | 1.58 MiB | September 07 2022 |
Information Release System User Manual Information Release System User Manual TABLE OF CONTENTS Chapter 1 Product Introduction...................................................................................................................................................... 6 1.1 Introduction ...............................................................................................................................................................................6 1.2 Main Features ............................................................................................................................................................................6 Chapter 2 Remote Control Operations ........................................................................................................................................... 7 2.1 Functios of Remote Control Keys ...............................................................................................................................................7 2.2 Remote Control Mode ...............................................................................................................................................................7 2.3 Bind a Remote Control to a Terminal .........................................................................................................................................8 2.4 Unbind a Remote Control from a Terminal ................................................................................................................................8 Chapter 3 Client Software Operation .............................................................................................................................................. 9 3.1 Client Software Installation ........................................................................................................................................................9 3.2 Client Software Login .................................................................................................................................................................9 3.3 Activate Information Release Terminal ....................................................................................................................................10 3.4 Reset Password ........................................................................................................................................................................12 3.5 Register Terminal in Server ......................................................................................................................................................12 Chapter 4 Material Management ................................................................................................................................................. 15 4.1 Add Multimedia Material .........................................................................................................................................................15 4.1.1 Add Local Material ........................................................................................................................................................15 4.1.2 Add Dynamic Material ..................................................................................................................................................16 4.1.3 Replace Material ........................................................................................................................................................... 17 4.2 Check Material .........................................................................................................................................................................18 4.2.1 Auto Check ....................................................................................................................................................................18 4.2.2 Manual Check in Material List Tab ................................................................................................................................18 4.2.3 Manual Check in Check Material Tab ............................................................................................................................19 4.3 Modify Material .......................................................................................................................................................................19 4.4 Delete Material ........................................................................................................................................................................20 4.5 Preview/Download Material ....................................................................................................................................................20 Chapter 5 Program Management ................................................................................................................................................. 21 5.1 Add Program ............................................................................................................................................................................21 5.1.2 Configure Program Basic Settings .................................................................................................................................21 5.1.3 Manage Page ................................................................................................................................................................22 5.1.4 Create Picture Program .................................................................................................................................................23 5.1.5 Create PDF Program ......................................................................................................................................................24 5.1.6 Create Document Program ...........................................................................................................................................25 5.1.7 Create Audio/Video/Live Video Program .....................................................................................................................26 5.1.8 Create Webpage Program ............................................................................................................................................. 27 5.1.9 Create Clock Program ....................................................................................................................................................28 5.1.10 Create Weather Program ............................................................................................................................................29 5.1.11 Create Countdown Program........................................................................................................................................30 5.1.12 Create Video Input Program .......................................................................................................................................31 5.1.13 Create Pop-up Image Program ....................................................................................................................................32 5.1.14 Create Queue Manager Program ................................................................................................................................33 1 Information Release System User Manual 5.1.15 Create Capture Program .............................................................................................................................................34 5.1.16 Create Button Program ...............................................................................................................................................35 5.1.17 Create App Program ....................................................................................................................................................36 5.1.18 Hyperlink Feature for Android Touchscreen Program ................................................................................................. 37 5.2 Check Program .........................................................................................................................................................................38 5.2.1 Auto Check ....................................................................................................................................................................38 5.2.2 Manual Check in Program List Tab ................................................................................................................................38 5.2.3 Manual Check in Check Program Tab ............................................................................................................................38 5.3 Modify Program .......................................................................................................................................................................39 5.4 Delete Program ........................................................................................................................................................................39 5.5 Preview Program ......................................................................................................................................................................39 Chapter 6 Schedule Management ................................................................................................................................................ 40 6.1 Add Schedule ...........................................................................................................................................................................40 6.2 Check Schedule ........................................................................................................................................................................41 6.2.1 Auto Check ....................................................................................................................................................................41 6.2.2 Manual Check in Schedule List Tab ...............................................................................................................................41 6.2.3 Manual Check in Check Schedule Tab ...........................................................................................................................42 6.3 Modify Schedule ......................................................................................................................................................................42 6.4 Delete Schedule .......................................................................................................................................................................42 6.5 Release Schedule .....................................................................................................................................................................43 6.5.1 Timed Release ...............................................................................................................................................................43 6.5.2 Instant Release ..............................................................................................................................................................44 6.5.3 Prerelease in Schedule List ............................................................................................................................................44 6.6 Exporting Schedule ..................................................................................................................................................................45 Chapter 7 Terminal Management ................................................................................................................................................. 46 7.1 Adding Terminal .......................................................................................................................................................................46 7.2 Toolbar .....................................................................................................................................................................................46 7.3 Terminal Remote Configuration ............................................................................................................................................... 47 7.3.1 Configure Timed Startup/Shutdown ............................................................................................................................. 47 7.3.2 Configure Timed Volume ..............................................................................................................................................48 7.3.3 Configure Device Input Port Switch ..............................................................................................................................48 7.3.4 Configure Default Volume .............................................................................................................................................49 7.3.5 Configure Backlight .......................................................................................................................................................49 7.3.6 Configure Logo ..............................................................................................................................................................50 7.3.7 Configure Default Schedule ..........................................................................................................................................50 7.3.8 Configure Terminal Password ........................................................................................................................................51 7.3.9 Configure Temperature Protection ...............................................................................................................................51 7.3.10 Configure Time Zone................................................................................................................................................... 52 7.3.11 Configure Terminal Security ........................................................................................................................................ 52 7.3.12 Check Additional Component Information ................................................................................................................. 52 7.3.13 Configure Terminal IP Address .................................................................................................................................... 52 7.3.14 Configure Linked Server IP Address .............................................................................................................................53 7.3.15 Adding IP Channel .......................................................................................................................................................53 2 Information Release System User Manual 7.4 Modify Terminal .......................................................................................................................................................................55 7.5 Delete Terminal ........................................................................................................................................................................55 Chapter 8 General Configuration .................................................................................................................................................. 56 8.1 Organization Resource .............................................................................................................................................................56 8.2 User Management ...................................................................................................................................................................56 8.2.2 Add a User .....................................................................................................................................................................56 8.2.3 Manage a User .............................................................................................................................................................. 57 8.3 Log Management .....................................................................................................................................................................58 8.3.1 Search Logs ...................................................................................................................................................................58 8.3.2 Back up Log Files ...........................................................................................................................................................59 8.4 Disk Management ....................................................................................................................................................................60 8.4.1 Format HDD ..................................................................................................................................................................60 8.4.2 Configure HDD Usage ....................................................................................................................................................60 8.4.3 HDD Backup ..................................................................................................................................................................61 8.4.4 HDD Migration .............................................................................................................................................................. 62 8.5 Server Maintenance .................................................................................................................................................................63 8.6 Time Synchronization ..............................................................................................................................................................63 Appendix A Operation Flow Chart ................................................................................................................................................ 65 Appendix B Deployment Diagram ................................................................................................................................................ 66 Appendix C Troubleshooting ........................................................................................................................................................ 67 3 Information Release System User Manual User Manual COPYRIGHT 2018 Hangzhou Hikvision Digital Technology Co., Ltd. ALL RIGHTS RESERVED. Any and all information, including, among others, wordings, pictures, graphs are the properties of Hangzhou Hikvision Digital Technology Co., Ltd. or its subsidiaries (hereinafter referred to be Hikvision). This user manual (hereinafter referred to be the Manual) cannot be reproduced, changed, translated, or distributed, partially or wholly, by any means, without the prior written permission of Hikvision. Unless otherwise stipulated, Hikvision does not make any warranties, guarantees or representations, express or implied, regarding to the Manual. About this Manual This Manual is applicable to Information Release System. The Manual includes instructions for using and managing the product. Pictures, charts, images and all other information hereinafter are for description and explanation only. The information contained in the Manual is subject to change, without notice, due to firmware updates or other reasons. Please find the latest version in the company website
(http://overseas.hikvision.com/en/). Please use this user manual under the guidance of professionals. Trademarks Acknowledgement and other Hikvisions trademarks and logos are the properties of Hikvision in various jurisdictions. Other trademarks and logos mentioned below are the properties of their respective owners. Legal Disclaimer TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, THE PRODUCT DESCRIBED, WITH ITS HARDWARE, SOFTWARE AND FIRMWARE, IS PROVIDED AS IS, WITH ALL FAULTS AND ERRORS, AND HIKVISION MAKES NO WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY, SATISFACTORY QUALITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON-INFRINGEMENT OF THIRD PARTY. IN NO EVENT WILL HIKVISION, ITS DIRECTORS, OFFICERS, EMPLOYEES, OR AGENTS BE LIABLE TO YOU FOR ANY SPECIAL, CONSEQUENTIAL, INCIDENTAL, OR INDIRECT DAMAGES, INCLUDING, AMONG OTHERS, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, OR LOSS OF DATA OR DOCUMENTATION, IN CONNECTION WITH THE USE OF THIS PRODUCT, EVEN IF HIKVISION HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. REGARDING TO THE PRODUCT WITH INTERNET ACCESS, THE USE OF PRODUCT SHALL BE WHOLLY AT YOUR OWN RISKS. HIKVISION SHALL NOT TAKE ANY RESPONSIBILITES FOR ABNORMAL OPERATION, PRIVACY LEAKAGE OR OTHER DAMAGES RESULTING FROM CYBER ATTACK, HACKER ATTACK, VIRUS INSPECTION, OR OTHER INTERNET SECURITY RISKS; HOWEVER, HIKVISION WILL PROVIDE TIMELY TECHNICAL SUPPORT IF REQUIRED. SURVEILLANCE LAWS VARY BY JURISDICTION. PLEASE CHECK ALL RELEVANT LAWS IN YOUR JURISDICTION BEFORE USING THIS PRODUCT IN ORDER TO ENSURE THAT YOUR USE CONFORMS THE APPLICABLE LAW. HIKVISION SHALL NOT BE LIABLE IN THE EVENT THAT THIS PRODUCT IS USED WITH ILLEGITIMATE PURPOSES. IN THE EVENT OF ANY CONFLICTS BETWEEN THIS MANUAL AND THE APPLICABLE LAW, THE LATER PREVAILS. 4 Information Release System User Manual Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Description Provides additional important points of the main text. information to emphasize or supplement Indicates a potentially hazardous situation, which if not avoided, could result loss, performance degradation, or unexpected results. in equipment damage, data Indicates a hazard with a high level of risk, which if not avoided, will result in death or serious injury. FCC Statement:
Please take attention that changes or modification not expressly approved by the party responsible for compliance could void the users authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:
(1) This device may not cause harmful interference, and
(2) This device must accept any interference received, including interference that may cause undesired operation. 5 Information Release System User Manual Chapter 1 Product Introduction 1.1 Introduction Information release system, mainly built up by the information release server (hereinafter referred to as the server) and information release terminal (hereinafter referred to as the terminal), is used to broadcast information, release news, advertise products, etc. It is applicable to industry of entertainment, finance, traffic, etc. 1.2 Main Features Manage users by user level. Allocate permission for users according to user level. Provides timed startup/shutdown and timed volume to keep terminal long running. Material and program check feature. Adding materials and programs without being checked to schedule and playing them in terminal are not allowed. Supports setting and editing schedule. Playback specified program after startup. Supports editing program parameters, including background picture, video/picture/subtitle division, playlist, etc. Cut in specified schedule like advertisement during playback. Play specified schedules in specific period. Arrange a play time for released programs. Send emergency information and play them according to their priorities. Supports screenshot for reviewing the terminal playback status. Provides logs. You can search logs by designated search conditions. Smart commercial feature supporting people counting and people analysis. 6 Information Release System User Manual Chapter 2 Remote Control Operations 2.1 Functios of Remote Control Keys Appearance Key Description Table 2-1 Remote Functions Power On/Off Back Delete
Direction
OK Mute Decrease Volume Increase Volume 2.2 Remote Control Mode A remote control is divided into two modes: 1-1 mode and 1-N mode. 1-1 mode: a remote control is bound to one terminal. 1-N mode: a remote control is unbound to any one single terminal. A remote control is in 1VN comparison mode by default. Mode 1-1 Mode 1-N Mode Table 2-2 Remote Control Mode Description Description The remote control only can control the terminal bound to it. The remote control can control any unbound terminals. 7 Information Release System User Manual 2.3 Bind a Remote Control to a Terminal Purpose:
After being bound to the remote control, the terminal cannot be controlled by any other remote controls and the remote control cannot control any other terminals. Step 1 Long press key and key on the remote control at the same time until the terminal pops up the verification code. The system pops up a box for you to enter the verification code only when your terminals are unbound to any remote controls. Step 2 Enter the verification code of the desired terminal. Step 3 Long press message. key and key at the same time until the system pops up the success 2.4 Unbind a Remote Control from a Terminal Purpose:
After being unbound from the remote control, the terminal can be controlled by any unbound remote controls and the remote control cannot control any unbound terminals. Long press key and key at the same time until the system pops up the success message. After you press the keys on the remote control, the terminal may not receive the unbinding request due to some reasons, such as device power-off or weak signals. In such cases, the remote control will be unbound from the terminal immediately while the terminal remains bound until it receives the request. 8 Information Release System User Manual Chapter 3 Client Software Operation 3.1 Client Software Installation Step 1 Get the installation package from our official website or the delivered disc. Step 2 Double-click the installation package to start software installation wizard. Step 3 Follow the wizard to finish the installation. 3.2 Client Software Login Purpose:
Before any operation, you need to log into the information release server. Before you start:
Install an information release server first. And ensure the network connection between the server and the information release system is well. Step 1 After installation finished, double-click the icon to run the software. Step 2 Click Server Configuration. Step 3 Enter IP Address and Port No. of information release server to log in. Step 4 Click Back to go back to login interface. Figure 3-1 Login Interface 9 Information Release System User Manual Figure 3-2 Server Configuration Step 5 Enter User Name and Password of information release server. Step 6 Click Login. Step 7 After login, wizard pops up guiding you with adding material, program, and schedule. For the new information release server, to ensure the server functions normally, you need to follow the guide to initialize its HDD. Figure 3-3 Wizard 3.3 Activate Information Release Terminal Purpose:
For the first time to use an information release terminal, activate it before any operation. Step 1 Run client software. Step 2 Click Online Device. 10 Information Release System User Manual Step 3 Select device to activate and click the Security Status item in right menu. Figure 3-4 Online Device Step 4 Enter Password, enter the same password in Confirm Password text-field, and click Apply to activate the device. Figure 3-5 Network Information Step 5 Enter IP Address, Port No., Subnet Mask, Gateway and the password. Step 6 Click Edit. Figure 3-6 Activation 11 Information Release System User Manual 3.4 Reset Password You are highly recommended to operate restoration with the help of our technical support. Step 1 Click Export to export the restoration file and send the file to our technical support. Step 2 Technical support will send you back a file. Click Import and select the file. Step 3 Enter Password, enter the same password in Confirm Password text-field, and click OK. Figure 3-7 Reset Password 3.5 Register Terminal in Server Purpose:
To add a terminal to a server, register the terminal in the server first. Before you start:
Activate the terminal to register. Step 1 Run client software. Step 2 Click Online Device. 12 Information Release System User Manual Step 3 Select an activated terminal and click
. Figure 3-8 Online Device Step 4 Enter server information, including Server IP Address, Server Port, User Name, and Server Figure 3-9 CMS Register Password. Step 5 Enter a custom Terminal Name for terminal. Step 6 Enter Terminal Password. 13 Information Release System User Manual Step 7 Click Save. Step 8 Optionally, click and enter Terminal Password to check registration status. 14 Information Release System User Manual Chapter 4 Material Management Purpose:
Add, modify, delete, preview, download, and check materials. Click the Material Management tab in menu bar. 4.1 Add Multimedia Material Purpose:
Two types of material are supported: local material and dynamic material. Up to 10,000 materials can be uploaded. The maximum size for a single material is 4 GB. The maximum resolution for a picture is 3840 2160. 4.1.1 Add Local Material Purpose:
Local material includes the picture, audio, video, txt, pdf, app, and web file. Here are the supported formats for each type. Table 4-1 Supported Material Type Material Type Supported Format Picture file bmp, jpg, png, gif Video file Audio file Text file Web file App file Step 1 Click Local Files. rm, rmvb, avi, asf, avi, mpg, 3gp, mov, mkv, wmv, flv, mp4 mp3, wav, wma txt, pdf html, htm apk 15 Information Release System User Manual Figure 4-1 Material Management Step 2 Select materials to upload and click Open. Step 3 Select materials and click Upload Material. 4.1.2 Add Dynamic Material Purpose:
Dynamic materials include webpage, IP camera, stream media server, URL picture, and general. Webpage: An URL address. General data: Data from third-party platforms like queue management device and pop-up image device. Supported formats for pop-up image: bmp, jpg, and png. Step 1 Click Dynamic Materials. Step 2 Select Material Type. Figure 4-2 Create Dynamic Material Material type: Webpage 1) Enter material Name, material URL, and material Description. 16 Information Release System User Manual 2) Select Organization the material belongs to. To create an organization, refer to 8.1 Organization Resource. 3) Select Material Attribute as Public or Private. Public: All users can use the material. Private: Users in the same organization and superior organization can use the material. Material type: IP Camera 1) Enter material Name and material Description. 2) Enter the required parameters. 3) Select Material Attribute as Public or Private. 4) Enter IP camera information. Material type: Stream Media Server 1) Enter material Name and material Description. 2) Select Organization the material belongs to. 3) Select Material Attribute as Public or Private. Material type: General 1) Enter material Name, material URL, and material Description. 2) Select Material Attribute as Public or Private. 3) Select IP Type and enter IP Address. Material type: URL Picture 1) Enter material Name, material URL, and material Description. 2) Select Organization the material belongs to. 3) Select Material Attribute as Public or Private. Step 3 Click Add. Step 4 Click Upload Material. 4.1.3 Replace Material Purpose:
Replace an uploaded material by a material with the same type and name. Step 1 When uploading a local/dynamic material, select a material of the same name and type with the material to replace. Step 2 Click
. Then a message box pops up indicating the material is duplicate and turns to
. Step 3 Optionally, check the Auto Apply to automatically send the material to the program that contains the former material. 17 Information Release System User Manual Step 4 Click
. 4.2 Check Material Purpose:
Only checked material can be added to program. Only user has material check permission can check materials. 4.2.1 Auto Check Purpose:
If you are a user with check permission, you can enable auto check when uploading material. Step 1 Click the Upload Materials tab in Material Management interface. Step 2 Select materials to upload. For detailed steps, refer to:
Step 1 to 2 of Add Local Material. Step 1 to 2 of Add Dynamic Material. Step 3 Check the Auto Check in lower right corner of Upload Materials interface. For user without check permission, Auto Check is checked by default and is not configurable. Step 4 Click
. Then system will automatically check the material. 4.2.2 Manual Check in Material List Tab Step 1 Click the Material List tab in Material Management interface. Step 2 Select material whose Check Status is To be Approved. Step 3 Click
. Step 4 Select check Result as Pass or Deny. Step 5 Enter your check Comment if needed. 18 Information Release System User Manual Figure 4-3 Check Material Step 6 Click OK. 4.2.3 Manual Check in Check Material Tab Step 1 Click the Check Material tab in Material Management interface. Step 2 Select a material. Step 3 Click
according to your needs. Step 4 Enter Comment. Figure 4-4 Step 5 Click OK. 4.3 Modify Material Purpose:
Modify the parameters of material you have uploaded. Step 1 Click to select material to modify. Step 2 Click
. 19 Information Release System User Manual Step 3 Modify the parameters you need. Step 4 Click Modify. 4.4 Delete Material Step 1 Select the materials to delete. Step 2 Click
. Step 3 Click OK in popup message box to delete. 4.5 Preview/Download Material Purpose:
You can download uploaded materials to the local path. The downloading status can be viewed in local status row. The downloaded materials including picture, txt document, video, and clock, can be previewed. Previewing dynamic material is not allowed. Step 1 Click to select materials to download. Step 2 Click to start download. After the material is downloaded, the Local Status will turn from Not Downloaded to Downloaded. Step 3 Optionally, you can select a downloaded material and click to preview it. 20 Information Release System User Manual Chapter 5 Program Management Purpose:
You can create program using checked materials. The program layout is configurable. After program is added, you can modify, delete, preview, copy, and check programs. Click the Program Management item in menu bar to enter program management interface. 5.1 Add Program Purpose:
To add a program, create and configure the program pages first and specify materials for windows in page. Up to 2,000 programs can be added. We take the example of Android standard program type to describe the steps. For the hyperlink feature of Android touchscreen, refer to 5.1.18 Hyperlink Feature for Android Touchscreen Program. Step 1 Click Program Management in menu bar. Step 2 Click in Program List tab. Step 3 Configure program basic settings. Turn to 5.1.2 Configure Program Basic Settings. Step 4 Create and configure pages. Turn to 5.1.3 Manage Page. Step 5 Create programs. Turn to following section according to your needs: Create Picture Program, Create PDF Program, Create Document Program, Create Audio/Video/Live Video Program, Create Webpage Program, Create App Program, Create Clock Program, Create Weather Program, Create Countdown Program, Create Video Input Program, Create Pop-up Image Program, Create Queue Manager Program, Create Capture Program, Create Button Program. 5.1.2 Configure Program Basic Settings Purpose:
Configure the program name, resolution, type, etc. Step 1 Enter Program Name and Description. Step 2 Select Resolution according to the installation orientation of information release terminal. 21 Information Release System User Manual Step 3 Select Program Type according to your information release terminal model. Step 4 Select Share Property as Private or Public. Public: The program is available for all users. Private: The program is only available for current users. Step 5 Select the organization the program belongs to. For details about creating organization, refer to 8.1 Organization Resource. Step 6 Optionally, check Resolution Self-Adaptive. The window will automatically adjust the program display size to fit the window size. 5.1.3 Manage Page Purpose:
You can create multiple pages for a program. Follow the steps to edit page layout and create layout template for reusing. Following materials cannot exist in the same page: video, audio, counting down, video input, live video, pop-up image, and queue management. Step 1 Click in the page list. Up to 32 pages can be added. Step 2 Set page layout by one of the two options. Select an existing template. Edit the layout parameters including Background Color, Duration Type, and Background Picture in Property menu. You are recommended to set the duration type according to material type. For materials like video and audio, select it as Auto, then the page play duration equals material duration. For materials like picture and clock, select it as Custom and enter Playback Duration. 22 Information Release System User Manual Figure 5-1 Page Property Step 3 Enter Page Name. Step 4 Click to select a window type to show in the page. Then a window will pop up in the display area. Window position and size are adjustable in Linked Material Configuration Panel. Figure 5-2 Window Type List Step 5 Repeat step 4 to create more windows. 5.1.4 Create Picture Program Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters. For details, refer to 5.1.3 Manage Page. Step 3 Select at least one picture in window type list. Step 4 Click to select a window to edit in Window List. Figure 5-3 Window Type List 23 Information Release System User Manual Figure 5-4 Window Property Step 5 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 6 To specify the material to show in the window, click and select materials. Step 7 Configure Switch Effect between materials. Step 8 Select a material and enter its playback Duration. Step 9 Click Save to save the program. 5.1.5 Create PDF Program Step 1 Configure program basic settings. For details, refer to Configure Program Basic Settings. Step 2 Configure page parameters. For details, refer to 5.1.3 Manage Page. Step 3 Select at least one PDF material in window type list. Step 4 Click to select a window to edit in Window List. Figure 5-5 Window Type List 24 Information Release System User Manual Figure 5-6 Window Property Step 5 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 6 To specify the material to show in the window, click and select materials. Step 7 Select a material and configure its display parameters. 1) Configure Paging Time between materials. 2) Enter playback Duration. Step 8 Click Save to save the program. 5.1.6 Create Document Program Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters. For details, refer to 5.1.3 Manage Page. Step 3 Select at least one document material in window type list. Step 4 Click to select a window to edit in Window List. Figure 5-7 Window Type List 25 Information Release System User Manual Figure 5-8 Window Property Step 5 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 6 To specify the material to show in the window, click and select materials. Step 7 Select a material and configure its displaying parameters. 1) Configure the its parameters, including Font Size, Font Color, Background Color, Background Transparency, Scrolling Direction, and Scrolling Speed. 2) Enter playback Duration. Repeat the step to set playback duration for other materials. Step 8 Click Save to save the program. 5.1.7 Create Audio/Video/Live Video Program Two types of live video are supported: live video material and IP camera. Refer to Add Dynamic Material to add them. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters. For details, refer to 5.1.3 Manage Page. Step 3 Select at least one audio/video/live video material in window type list. 26 Information Release System User Manual Step 4 Click to select a window to edit in Window List. Figure 5-9 Window Type List Figure 5-10 Window Property Step 5 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 6 To specify the material to show in the window, click and select materials. Step 7 Select a material and select Duration Type. You are recommended to select it as Material Time. Step 8 Click Save to save the program. 5.1.8 Create Webpage Program Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters. For details, refer to 5.1.3 Manage Page. Step 3 Select at least one webpage material in window type list. 27 Information Release System User Manual Step 4 Click to select a window to edit in Window List. Figure 5-11 Window Type List Figure 5-12 Window Property Step 5 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 6 To specify the material to show in the window, click and select materials. Step 7 Select a material and configure its Duration. Step 8 Click Save to save the program. 5.1.9 Create Clock Program Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select the clock in window type list. For details, refer to 5.1.3 Manage Page. A page only allows one clock material. Figure 5-13 Window Type List 28 Information Release System User Manual Step 3 Click to select a window to edit in Window List. Figure 5-14 Window Property Step 4 Select window to edit from Current Window. Step 5 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 6 Check the checkboxes of clock options, including Clock, YYYY/MM/DD, Week, and HH:MM:SS, to display on clock. Step 7 Optionally, click to save the current layout as a template for reuse. Step 8 Select Background Picture from uploaded picture material. Step 9 Click Save to save the program. 5.1.10 Create Weather Program Before you start:
Configure weather server and go to System Maintenance > Weather Website Information to configure weather website information. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select the weather in window type list. For details, refer to 5.1.3 Manage Page. A page only allows one weather material. Step 3 Click to select a window to edit in Window List. Figure 5-15 Window Type List 29 Information Release System User Manual Figure 5-16 Window Property Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 5 Check the checkboxes of weather options to show. Step 6 Optionally, click to save the current layout as a template for reuse. Step 7 Select Background Picture from uploaded picture material. Step 8 Click Save to save the program. 5.1.11 Create Countdown Program Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select at least one countdown in window type list. For details, refer to 5.1.3 Manage Page. Step 3 Click to select a window to edit in Window List. Figure 5-17 Window Type List 30 Information Release System User Manual Figure 5-18 Window Property Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 5 Edit countdown parameters, including Data, Unit, Background Picture, Font Size, Font Color, and Sub-Window Position. Date: Count down from the data. The date cannot earlier than current time. Unit: Select the countdown unit. Background: Select picture from picture material. Sub-Window Position: The position of countdown content in the window. Step 6 Optionally, click to save the current layout as a template for reuse. Step 7 Click Save to save the program. 5.1.12 Create Video Input Program Purpose:
You can display the HDMI and VGA image that connecting with information release terminal. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select a video input in window type list. For details, refer to 5.1.3 Manage Page. A page only allows one video input material. Figure 5-19 Window Type List 31 Information Release System User Manual Step 3 Click to select a window to edit in Window List. Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Figure 5-20 Window Property Height value. Step 5 Select the Input Signal according to actuality. Step 6 Click Save to save the program. 5.1.13 Create Pop-up Image Program Before you start:
Install a third-party device as the source of pop-up images and add it as a material first. For details, refer to Add Dynamic Material. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select at least one pop-up image in window type list. For details, refer to 5.1.3 Manage Page. Step 3 Click to select a window to edit in Window List. Figure 5-21 Window Type List 32 Information Release System User Manual Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Figure 5-22 Window Property Height value. Step 5 Select pop-up image Material. Step 6 Select Background Picture. Step 7 Click Save to save the program. 5.1.14 Create Queue Manager Program Before you start:
Install a third-party device as the source of queue manager and add it as a material first. For details, refer to Add Dynamic Material. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select at least one queue manager in window type list. For details, refer to 5.1.3 Manage Page. Step 3 Click to select a window to edit in Window List. Figure 5-23 Window Type List 33 Information Release System User Manual Figure 5-24 Window Property Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Height value. Step 5 Select a queue manager Material. Step 6 Configure the queue manager layout parameters, including Style, Background Picture, Table Direction, content Align type, content Refreshing Direction, table Rows, table Columns, and table Header Row. Step 7 Optionally, click the icon to save the current layout as a template for reuse. Step 8 Click Save to save the program. 5.1.15 Create Capture Program Purpose:
Display the capture from IP camera. Before you start:
Install a third-party device as the source of capture. You can contact our technical support for details. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. 34 Information Release System User Manual Step 2 Configure page parameters and select at least one capture in window type list. For details, refer to 5.1.3 Manage Page. Step 3 Click to select a window to edit in Window List. Figure 5-25 Window Type List Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Figure 5-26 Window Property Height value. Step 5 Select a capture Material. Step 6 Configure the capture parameters, including Background Picture, Cancel Mode, and Display for. Cancel Mode: If it is selected as Auto, the capture displays for the set time. If it is selected as Manual, the capture display time is decided by IP camera. Display for: Available when Cancel Mode is Auto. Display the captured picture for specified time. Step 7 Click Save to save the program. 5.1.16 Create Button Program The chapter is only available for touchscreen. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select at least one button material in window type list. For details, refer to 5.1.3 Manage Page. 35 Information Release System User Manual Step 3 Click to select a window to edit in Window List. Figure 5-27 Window Type List Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Figure 5-28 Window Property Height value. Step 5 Configure the Background Picture. Step 6 Click Save to save the program. 5.1.17 Create App Program Before you start:
Add an app file of APK file first. For details, refer to 4.1.1 Add Local Material. Step 1 Configure program basic settings. For details, refer to 5.1.2 Configure Program Basic Settings. Step 2 Configure page parameters and select at least one app material in window type list. For details, refer to 5.1.3 Manage Page. Step 3 Click to select a window to edit in Window List. Figure 5-29 Window Type List 36 Information Release System User Manual Step 4 Adjust window position by editing X and Y value. Adjust window size by editing Width and Figure 5-30 Window Property Height value. Step 5 Select an app Material. Step 6 Click Save to save the program. 5.1.18 Hyperlink Feature for Android Touchscreen Program Purpose:
For Android touchscreen program, you can configure the hyperlink parameters to realize window switching. Switch to a Specified Window Step 1 Select Window Type of window A as Popup Window. Step 2 Select Window Type of window B as Normal, Switching Method as Pop up a New Page, and Switch to as window A. Result:
When playing window B, tap the touchscreen to jump to window A and tap again to end playing window A. Switch to a Specified Page Step 1 Select the Window Type of window A as Normal, Switching Method as Jump to Next Page, Switch to as page X. Result:
When playing window A, tap the touchscreen to switch to page X. 37 Information Release System User Manual 5.2 Check Program Purpose:
Only checked programs can be added to schedules. Only user has program check permission can check programs. 5.2.1 Auto Check Purpose:
If you are a user with check permission, you can enable auto check when uploading programs. Before clicking automatically check the program. when creating programs, check the Auto Check. Then system will 5.2.2 Manual Check in Program List Tab Step 1 Click the Program List tab in Program Management interface. Step 2 Click to select program whose Check Status is To be Approved. Step 3 Click
. Step 4 Select check Result as Pass or Deny. Step 5 Enter your check Comment. Figure 5-31 Check Program Step 6 Click OK to save the result. 5.2.3 Manual Check in Check Program Tab Step 1 Click the Check Program tab in Program Management interface. Step 2 Select a program. Step 3 Click
as required. Step 4 Enter Comment. 38 Information Release System User Manual Figure 5-32 Check Program Step 5 Click OK. 5.3 Modify Program Purpose:
You can modify the parameters of programs you have created. Step 1 Select a program to modify and click in operation menu. Step 2 Modify the parameters as required. Step 3 Click to save the settings. 5.4 Delete Program Step 1 Select program to delete. Step 2 Click
. 5.5 Preview Program Select program to preview and click in operation menu. 39 Information Release System User Manual Chapter 6 Schedule Management Purpose:
You can make a program playback schedule according to your needs. After schedule is made, you can modify, delete, release, and export schedule. Click the Schedule Management item in menu bar. 6.1 Add Schedule Up to 1,000 schedules can be added. Step 1 Click Add. Figure 6-1 Add Schedule Step 2 Enter Schedule Name and Description. Step 3 Select Schedule Type according to your information release terminal model. Step 4 Select the Playback Mode. We take the example of selecting it as Play by Day to describe the steps. Play by Day: Repeatedly play the programs by day. Play by Week: Repeatedly play the programs by week. Play by Loop: Repeatedly play the programs in loop. Custom: Repeatedly play the programs by custom schedule. 40 Information Release System User Manual Default Video: The default video will be played during no schedule period. Refer to Configure Default Schedule to enable the function first. Step 5 Select Share Property as Private or Public. Public: The program is available for all users. Private: The program is only available for current users. Step 6 Select the organization the schedule belongs to. For details about creating organization, refer to 8.1 Organization Resource. Step 7 Click to select a program in Program List. Step 8 Drag to draw a colored bar in the 24-hour time bar. Step 9 Repeat step 7 to 8 to specify programs to play in other periods. Not more than 8 periods can be set each day. Step 10 Click Save. 6.2 Check Schedule 6.2.1 Auto Check Purpose:
If you are a user with check permission, you can enable auto check when uploading schedules. Before clicking automatically check the program. when creating schedule, check the Auto Check. Then system will 6.2.2 Manual Check in Schedule List Tab Step 1 Click the Schedule List tab in Schedule Management interface. Step 2 Click to select schedule the Check Status of which is To be Approved. Step 3 Click
. Step 4 Select check Result as Pass or Deny. Step 5 Enter your check Comment. 41 Information Release System User Manual Figure 6-2 Check Schedule Step 6 Click OK to save the result. 6.2.3 Manual Check in Check Schedule Tab Step 1 Click the Schedule Check tab in Schedule Management interface. Step 2 Select a schedule. Step 3 Click
as required. Step 4 Enter Comment. Figure 6-3 Check Program Step 5 Click OK. 6.3 Modify Schedule Step 1 Select a schedule to modify and click in operation menu. Step 2 Modify the parameters as required. Step 3 Click to save the settings. 6.4 Delete Schedule Step 1 Click to select the schedules to delete. 42 Information Release System User Manual Step 2 Click
. Step 3 Click Confirm in popup message box to delete. 6.5 Release Schedule Purpose:
Release the checked schedules to information release terminal. 6.5.1 Timed Release Purpose:
Send schedules to information release terminal at specified time. Play it after released. Step 1 Click the Release Management tab in Schedule Management interface. Step 2 Click
. Figure 6-4 Release Schedule Step 3 Check Select Time to Release and edit the Time. Step 4 Check schedules in Select Schedule list. Step 5 Select Terminals to release to in Select Terminal list. Step 6 Click Confirm. 43 Information Release System User Manual 6.5.2 Instant Release Purpose:
Send the schedule to information release terminal immediately. Play it after released. Step 1 Enter Schedule List tab in Schedule Management interface. Step 2 Click in Operation list of a schedule to release. Figure 6-5 Release Schedule Step 3 Select Terminal. Step 4 Select Effective Time as Take Effect Immediately. Step 5 Click OK. 6.5.3 Prerelease in Schedule List Purpose:
Send the schedules to information release terminal immediately. Play them at the specified time. Step 1 Enter Schedule List tab in Schedule Management interface. Step 2 Click in Operation list of a schedule to release. 44 Information Release System User Manual Figure 6-6 Release Schedule Step 3 Select Terminal. Step 4 Select Effective Time as Effective Time. Step 5 Edit the Effective Time. Step 6 Click OK. 6.6 Exporting Schedule Purpose:
You can export schedules to local path. Step 1 Click to select schedule to release. Step 2 Click
. Figure 6-7 Export Schedule Step 3 Select Schedule Export Path. Step 4 Click Export. 45 Information Release System User Manual Chapter 7 Terminal Management Purpose:
Add information release terminal you want to manage. Click the Terminal Management item in menu bar to enter terminal management interface. 7.1 Adding Terminal Before you start:
Log in the terminal you want to add and register it in information release server. Step 1 Click
. Step 2 Enter terminal name in Terminal Device. Step 3 Enter Serial No. You can get the number in the back panel of terminal. Figure 7-1 Add Terminal Step 4 Select a group to Belong to. Step 5 Click Add. 7.2 Toolbar Figure 7-2 Toolbar 46 Information Release System User Manual Icon Description Icon Description Table 7-1 Button Description Power on the terminal. Disable timed volume. Power off the terminal. Show the release progress. Reboot the terminal. Hide the release progress. Start playing schedule. Enable timed switching. Stop playing schedule. Disable timed switching. Configure cut-in materials and programs. Stop cut-in. Cancel cut-in. Enable timed startup/shutdown and timed screen switching schedules. Disable timed startup/shutdown and timed screen switching schedules. Enable timed volume. Configure txt messages. Upgrade the terminal. Take a screenshot in terminal. Check schedule Restore the terminal to default settings. 7.3 Terminal Remote Configuration Purpose:
Remotely configure the terminal parameters. Select the terminal to configure and click in tool bar. 7.3.1 Configure Timed Startup/Shutdown Purpose:
Configure the timed startup/shutdown schedule for terminal. The terminal automatically starts up and shuts down according to the schedule. Step 1 Click the Timed Startup/Shutdown tab. 47 Information Release System User Manual Figure 7-3 Timed Startup/Shutdown Step 2 Select Schedule Type as Daily Schedule or Weekly Schedule. We take the weekly schedule as an example to describe the steps. Step 3 Drag to draw blue bars in the days of a week. During the time the blue bar locates, the terminal runs. In other duration, it powers off. Step 4 Optional, check Apply in Batch and select terminals to configure with the same parameters. Step 5 Click Apply. 7.3.2 Configure Timed Volume Purpose:
Configure the timed volume schedule for terminal. The terminal volume varies according to schedule. Step 1 Click the Device Volume Switch tab. Step 2 Configure the schedule. For detailed steps, you can refer to Configure Timed Startup/Shutdown. 7.3.3 Configure Device Input Port Switch Purpose:
Switch the terminal display image between HDMI input and content from information release server. 48 Information Release System User Manual Step 1 Click the Device Input Port Switch tab. Step 2 Configure the schedule. For detailed steps, you can refer to Configure Timed Startup/Shutdown. 7.3.4 Configure Default Volume Purpose:
If you disable the timed volume, the terminal volume is the default volume you set here. Step 1 Click the Default Volume tab. Step 2 Drag the slider to adjust volume. Step 3 Optionally, check Apply in Batch and select terminals to configure with the same Figure 7-4 Default Volume parameters. Step 4 Click Apply. 7.3.5 Configure Backlight The feature is available for terminal with light sensation board. Step 1 Click the Backlight tab. Figure 7-5 Backlight Step 2 Check Auto Brightness Configuration and set Brightness Level. Auto Brightness Configuration: Terminal will automatically adjust screen backlight according to environment. Brightness Level: The default volume is recommended. Step 3 Drag the slider of Backlight to adjust backlight volume. 49 Information Release System User Manual Step 4 Optionally, check Apply in Batch and select terminals to configure with the same parameters. Step 5 Click Apply. 7.3.6 Configure Logo Purpose:
Enable/disable the startup logo of terminals. Step 1 Click the Logo tab. Step 2 Check/uncheck Logo. Step 3 Optionally, check Apply in Batch and select terminals to configure with the same Figure 7-6 Startup Logo parameters. Step 4 Click Apply. 7.3.7 Configure Default Schedule Purpose:
If you need to display a default video when no schedule is being played, enable default schedule and designate default videos. Refer to 6.1 Add Schedule to designate default video. Step 1 Click the Default Schedule tab. Figure 7-7 Default Schedule Step 2 Check Enable Default Schedule. Step 3 Enter Schedule Name. Step 4 Optionally, check Apply in Batch and select terminals to configure with the same parameters. Step 5 Click Apply. 50 Information Release System User Manual 7.3.8 Configure Terminal Password Purpose:
You can remotely modify terminal password. Step 1 Click Modify Terminal Password. Figure 7-8 Terminal Password Step 2 Enter Current Password and enter the same password in New Password and Confirm New Password. Step 3 Optionally, check Apply in Batch and select terminals to configure with the same parameters. Step 4 Click Apply. 7.3.9 Configure Temperature Protection Purpose:
Terminal shuts down automatically if its temperature is higher than the shutdown temperature. And terminal starts up automatically when its temperature is lower than the startup temperature. Step 1 Click Temperature. Figure 7-9 Temperature Protection Step 2 Check Enable. Step 3 Enter Startup Temperature and Shutdown Temperature. Startup Temperature: Terminal shuts down automatically if its temperature is higher than the set value. Range: 40 C to 53 C. Shutdown Temperature: Terminal will shut down automatically if its temperature is higher than the set value. Range: 42 C to 55 C. 51 Information Release System User Manual Step 4 Optionally, check Apply in Batch and select terminals to configure with the same parameters. Step 5 Click Apply. 7.3.10 Configure Time Zone Purpose:
Configure terminal time zone according to the actuality. Step 1 Click Time Zone Configuration. Step 2 Select Time Zone. Step 3 Optionally, check Apply in Batch and select terminals to configure with the same Figure 7-10 parameters. Step 4 Click Apply. 7.3.11 Configure Terminal Security Purpose:
You can remotely enable/disable terminal SADP function. Step 1 Click Terminal Security. Step 2 Check/uncheck Enable SADP as your desire. Step 3 Optionally, check Apply in Batch and select terminals to configure with the same parameters. Step 4 Click Apply. 7.3.12 Check Additional Component Information You can check the version information of the additional component and determine whether an upgrade is needed. 7.3.13 Configure Terminal IP Address Step 1 Go to Network > Terminal IP Address. 52 Information Release System User Manual Figure 7-11 Terminal IP Address Step 2 Edit network parameters. Step 3 Click Apply. 7.3.14 Configure Linked Server IP Address Step 1 Go to Network > Linked Server. Figure 7-12 Linked Server IP Address Step 2 Edit network parameters. Step 3 Click Apply. 7.3.15 Adding IP Channel Purpose:
Up to 4 general IP cameras and 1 valid passenger IP camera are allowed to add to a terminal. Step 1 Click the Terminal Association tab. 53 Information Release System User Manual Step 2 Select a channel in Channel list and click
. Figure 7-13 IP Channel Figure 7-14 IP Camera Parameters Step 3 Enter the parameters of IP camera to add. Step 4 Click OK Step 5 Optionally, link the IP camera to other channel by operating the
icon. 54 Information Release System User Manual 7.4 Modify Terminal Step 1 Click to select a terminal to modify. Step 2 Click
. Step 3 Modify the parameters you need. Step 4 Click Modify to save the settings. 7.5 Delete Terminal Step 1 Click to select the terminals to delete. Step 2 Click
. Step 3 Click Confirm in popup message box to delete. 55 Information Release System User Manual Chapter 8 General Configuration Purpose:
Edit users, view logs, manage HDD, and configure system parameters here. 8.1 Organization Resource Step 1 Select the Organization Resource item. Step 2 Click to create an organization. Figure 8-1 Create Organization Step 3 Enter Organization Name and Description. Step 4 Click Configuration. 8.2 User Management Purpose:
Multiple user accounts can be added to the client software. You are allowed to assign different permissions for different users. Step 1 Select the Organization Resource item. 8.2.2 Add a User Step 1 Select an organization to add the user to. Step 2 Click
. 56 Information Release System User Manual Step 3 Enter the User Name, Password, and Confirm Password. We highly recommend you to use a strong password to ensure your data security. Figure 8-2 Add User A user name cannot contain any of the following characters: / \ : * ? < > |. And the length of the password cannot be less than 6 characters. For your privacy, we strongly recommend changing the password to something of your own choosing (using a minimum of 8 characters, including upper case letters, lower case letters, numbers, and special characters) in order to increase the security of your product. Step 4 Check the checkboxes to assign the permissions for the created user. Step 5 Click OK to create the user. 8.2.3 Manage a User Purpose:
After created successfully, the user account is added to the user list on the Account Management page. You can edit or delete the information of the user accounts. To edit the information of the user, select the user from the list, and click Modify User. Or you can double click the user name to enter the Modify User window. To delete the information of the user, select the user from the list, and click Delete User. 57 Information Release System User Manual The super user cannot be deleted and edited. 8.3 Log Management 8.3.1 Search Logs Purpose:
The log files of the software can be searched for checking. Step 1 Click to select the Log Management item in general configuration menu. Figure 8-3 Log Search Step 2 Set the search conditions. Step 3 Click Search. The log files matching the search conditions will be displayed on the list. You can check the operation time, content, and other information of the logs. Please narrow the time range or filter the log type for search if there are too many log files. 58 Information Release System User Manual Figure 8-4 Log Search 8.3.2 Back up Log Files Purpose:
The log files can be exported for backup. Step 1 Set the condition and search the log file. Step 2 Click Export Log to open the Log Backup dialog box. Step 3 Click the icon, select a local saving path, and set a name for the file. Step 4 Click Confirm to export the selected log files. Figure 8-5 Log Backup 59 Information Release System User Manual 8.4 Disk Management 8.4.1 Format HDD Purpose:
You can format the HDD installed in information release server. Step 1 Select the Disk Management item in menu bar. Figure 8-6 Disk Management Step 2 Check to select HDD. Step 3 Click Format and confirm the operation. 8.4.2 Configure HDD Usage Purpose:
HDD can be configured as backup HDD, migration HDD, or normal HDD. Step 1 Click of an HDD. 60 Information Release System User Manual Figure 8-7 HDD Usage Step 2 Select HDD Usage as your desire. Normal HDD: Save information release server data. Backup HDD: Back up data for other HDDs in information release server. Migration HDD: Used to migrate data of one information release server to the other server. Step 3 Click OK. 8.4.3 HDD Backup Purpose:
To avoid data loss, you can back up data from normal HDDs to backup HDDs. Create backup HDDs. For details, refer to 8.4.2 Configure HDD Usage. The capacity of backup HDDs must be larger than the capacity of HDDs to back up. Data of all normal HDDs will be backed up. Manual Backup Purpose:
Backup data up for once. Step 1 Select the backup HDDs and click Initialize. Step 2 After initialization, click Manual Backup. Auto Backup Purpose:
Device will regularly back data up by the set time. 61 Information Release System User Manual Step 1 Select the backup HDDs and click Initialize. Step 2 Click Auto Backup. Step 3 Check Enable of Auto Backup. Step 4 Set Backup Time. Device will regularly starts backup by the set time. Figure 8-8 Auto Backup Step 5 Click OK. 8.4.4 HDD Migration Purpose:
Migrate data of one information release server to the other server. Before you start:
Set all HDDs as the migration HDD. For details, refer to 8.4.2 Configure HDD Usage. To ensure data completeness, you need to migrate data of all HDDs. After data migration, the configuration file database of new information release server will be replaced. Step 1 Click Migrate. Step 2 Install the HDDs to the new information release server. Step 3 Log into the new server via client software. Step 4 Enter Disk Management interface and click Restore Migration Data. Step 5 After restoration, set the usage of all HDDs as normal HDD or backup HDD, and reboot server. 62 Information Release System User Manual 8.5 Server Maintenance Select the System Maintenance item in menu bar. Enable SADP: Enable/disable SADP of the information release server. The function is enabled by default. You are recommended to disable SADP after deployment finished. Enable SSH: Enable/disable SSH of the information release server with the help of technical support. To improve network security, youre recommended to disable SSH. Figure 8-9 System Maintenance 8.6 Time Synchronization Purpose:
You can adjust the information release server time. 63 Information Release System User Manual Step 1 Select the Time Synchronization item in menu bar. Figure 8-10 Time Synchronization Step 2 Select Time Zone according to actuality. Step 3 To synchronize server time with your computer time, check Current Time. To adjust server time as your desire, uncheck Current Time and enter the time. Step 4 Click OK. 64 Information Release System User Manual Appendix A Operation Flow Chart 65 Activate terminal with client software. Set IP address for terminal with client software. Obtain terminal serial number. Register the terminal to information release server. Add terminal to client software.Upload materials in client software.Create programs with uploaded materials.Make program playback schedules.Release schedules to your terminals. Information Release System User Manual Appendix B Deployment Diagram 66 TerminalTerminalTerminalComputer with Client SoftwareDS-D60S-BNetworkOffice BuildingMallSchoolServer RoomControl CenterWireless NetworkWired Network Information Release System User Manual Appendix C Troubleshooting The remote control is bound to a terminal and the remote control is lost. Connect mouse to the terminal. Enter system setting menu and unbind the remote control. The remote control is bound to a terminal and the terminal is lost. Press key and key to unbind the remote control. 0102011081022 67 UD11968B
1 | Label | ID Label/Location Info | 423.53 KiB | September 07 2022 |
Remark:Its hard to put FCC statement on the product due to devices irregular appearance. FCC statement will be placed in the user manual which the device is marketed.
1 | Applicant Declaration Letter | Cover Letter(s) | 216.47 KiB | September 07 2022 |
SGS North America Inc. 620 Old Peachtree Road SUITE 100 Suwanee, Georgia 30024 United States Applicant Declaration Applicant Legal Business Name Hangzhou Hikvision Digital Technology Co., Ltd. Address Grantee Code FCC ID No. 555 Qianmo Road, Binjiang District, Hangzhou 310052, China 2ADTD 2ADTD-DS-D60CR Authorized Contact Name Long Cheng Contact Email Contact Phone chenglong6@hikvision.com
+8618969187825 I, the undersigned, certify that I am an authorized signatory for the Applicant and therefore declare;
a) b) c) d) e) in accordance with 47CFR2.911(d), all of the statements herein and the exhibits attached hereto are true and correct to the best of my knowledge and belief. in accepting a Grant of Equipment Authorization issued by a TCB, under the authority of the FCC, as a result of the representations made in this application, the Applicant is responsible for:
labeling the equipment with the exact FCC ID as specified in this application,
(1)
(2) compliance statement labeling pursuant to the applicable rules,
(3) compliance of the equipment with the applicable technical rules, if the Applicant is not the actual manufacturer of the equipment, appropriate arrangements have been made with the manufacturer to ensure that production units of this equipment will continue to comply with the FCCs technical requirements. in accordance with 47 CFR 2.909 and KDB394321, the Applicant has read, understood and agrees to accept that they are the responsible party and agree to abide by their responsibilities as specified under 47 CFR 2.909 and KDB394321. in accordance with ISO17065, FCC KDB641163, FCC KDB610077, KDB394321 and RSP-100, the Applicant has read, understood, accepts and agrees to abide by the post market surveillance requirements.
(1)
(2)
(3) the Applicant understands, accepts and agrees that a sample may be requested for surveillance testing. the Applicant shall make provisions to always have a production sample available upon request by SGS, FCC and/or ISED. the Applicant shall, upon request by SGS, at the Applicants expense, provide a production sample of the requested product to SGS, FCC and/or ISED as instructed. The sample shall include all support devices, cables, software, accessories or other hardware or software required for evaluation, review, certification and audit surveillance of products certified by SGS. f) neither the Applicant nor any party to the application is subject to a denial of Federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862 because of a conviction for possession or distribution of a controlled substance. See 47CFR 1.2002(b) for the definition of a party for these purposes. g) the Applicant has read, understood, accepts and agrees to abide by the SGS North America, Inc.(TCB) terms and conditions. Link to CFRs: https://www.fcc.gov/wireless/bureau-divisions/technologies-systems-and-innovation-division/rules-regulations-title-47 Link to KDBs: https://apps.fcc.gov/oetcf/kdb/index.cfm Link to RSP-100: https://www.ic.gc.ca/eic/site/smt-gst.nsf/eng/sf01130.html Date: 2022-09-06 Applicant Signature:
Print Name:
Title:
*NOTE: This declaration cannot be signed by an Agent, it shall be signed by an authorized person listed in the FCC database Long Cheng Testing & Certification Engineer Applicant Declaration Rev:0.0
1 | Auth letter | Cover Letter(s) | 114.34 KiB | September 07 2022 |
Hangzhou Hikvision Digital Technology Co., Ltd. TO:
Federal Communication Commission Equipment Authorization Branch 7435 Oakland Mills Road Columbia, MID 21046 Regarding: FCC ID: 2ADTD-DS-D60CR To whom it may concern:
Date: 2022-09-06 We, the undersigned, hereby authorize Parlam Zhan to act on our behalf in all manners relating to application for equipment authorization with respect to the FCC ID above, including signing of all documents relating to these matters. Any and all acts carried out by the agent on our behalf shall have the same effect as acts of our own. We, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 853(a). Where our agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for Certification, as specified by SGS North America, Inc., still resides with Hangzhou Hikvision Digital Technology Co., Ltd. This authorization is valid until further written notice from the applicant. Name (Printed): Long Cheng Title: Testing & Certification Engineer Signature:
On behalf of Company: Hangzhou Hikvision Digital Technology Co., Ltd. Telephone: +8618969187825
1 | Confidentiality FCC | Cover Letter(s) | 138.07 KiB | September 07 2022 |
Hangzhou Hikvision Digital Technology Co., Ltd. To:
SGS North America Inc. 620 Old Peachtree Road SUITE 100 Suwanee, Georgia United States From: Hangzhou Hikvision Digital Technology Co., Ltd. No. 555 Qianmo Road, Binjiang District, Hangzhou 310052, China Regarding:
Confidentiality Request regarding application for FCC ID: 2ADTD-DS-D60CR LONG TERM CONFIDENTIALITY Pursuant to 47 CFR Section 0.459 and 0.457 of the commissions rules, the applicant hereby request confidential treatment of the documents listed below, associated with the certification application referenced above. Schematic(s) Block Diagrams Operational Descriptions The documents above contain proprietary information not released to the public. Public disclosure of this information may prove harmful to the business of the applicant. Sincerely, Signature:
Printed Name (on file with the FCC associated with the Grantee Code): Long Cheng Title: Testing & Certification Engineer Company Name: Hangzhou Hikvision Digital Technology Co., Ltd.
frequency | equipment class | purpose | ||
---|---|---|---|---|
1 | 2022-09-07 | 433.9 ~ 433.9 | DSC - Part 15 Security/Remote Control Transmitter | Original Equipment |
app s | Applicant Information | |||||
---|---|---|---|---|---|---|
1 | Effective |
2022-09-07
|
||||
1 | Applicant's complete, legal business name |
Hangzhou Hikvision Digital Technology Co., Ltd.
|
||||
1 | FCC Registration Number (FRN) |
0024149825
|
||||
1 | Physical Address |
No. 555 Qianmo Road, Binjiang District
|
||||
1 |
Hangzhou, N/A
|
|||||
1 |
China
|
|||||
app s | TCB Information | |||||
1 | TCB Application Email Address |
U******@SGS.COM
|
||||
1 | TCB Scope |
A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
|
||||
app s | FCC ID | |||||
1 | Grantee Code |
2ADTD
|
||||
1 | Equipment Product Code |
DS-D60CR
|
||||
app s | Person at the applicant's address to receive grant or for contact | |||||
1 | Name |
L******** C********
|
||||
1 | Telephone Number |
+8618********
|
||||
1 | Fax Number |
+86-5********
|
||||
1 |
c******@hikvision.com
|
|||||
app s | Technical Contact | |||||
1 | Firm Name |
SGS-CSTC Standards Technical Services Co., Ltd.
|
||||
1 | Name |
P****** Z****
|
||||
1 | Physical Address |
588 West Jindu Road, Xinqiao, Songjiang
|
||||
1 |
ShangHai, 201612
|
|||||
1 |
China
|
|||||
1 | Telephone Number |
+8621********
|
||||
1 | Fax Number |
02161********
|
||||
1 |
P******@sgs.com
|
|||||
app s | Non Technical Contact | |||||
1 | Firm Name |
SGS-CSTC Standards Technical Services Co., Ltd.
|
||||
1 | Name |
P******** Z****
|
||||
1 | Physical Address |
588 West Jindu Road, Xinqiao, Songjiang
|
||||
1 |
ShangHai, 201612
|
|||||
1 |
China
|
|||||
1 | Telephone Number |
+8621********
|
||||
1 | Fax Number |
02161********
|
||||
1 |
P******@sgs.com
|
|||||
app s | Confidentiality (long or short term) | |||||
1 | Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | Yes | ||||
1 | Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?: | No | ||||
if no date is supplied, the release date will be set to 45 calendar days past the date of grant. | ||||||
app s | Cognitive Radio & Software Defined Radio, Class, etc | |||||
1 | Is this application for software defined/cognitive radio authorization? | No | ||||
1 | Equipment Class | DSC - Part 15 Security/Remote Control Transmitter | ||||
1 | Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant) | Digital Signage Player Remoter | ||||
1 | Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application? | No | ||||
1 | Modular Equipment Type | Does not apply | ||||
1 | Purpose / Application is for | Original Equipment | ||||
1 | Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization? | No | ||||
1 | Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization? | No | ||||
1 | Is there an equipment authorization waiver associated with this application? | No | ||||
1 | If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded? | No | ||||
app s | Test Firm Name and Contact Information | |||||
1 | Firm Name |
Compliance Certification Services (Kunshan) Inc.
|
||||
1 | Name |
J****** C****
|
||||
1 | Telephone Number |
+ 86-******** Extension:
|
||||
1 |
J******@sgs.com
|
|||||
Equipment Specifications | |||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Line | Rule Parts | Grant Notes | Lower Frequency | Upper Frequency | Power Output | Tolerance | Emission Designator | Microprocessor Number | |||||||||||||||||||||||||||||||||
1 | 1 | 15.231 | 433.90000000 | 433.90000000 |
some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details
This product uses the FCC Data API but is not endorsed or certified by the FCC