FCC ID: 2AFZZ122G Mobile Phone with GSM, WCDMA, LTE, 5GNR, Bluetooth, WiFi, NFC and Wireless charging

by: Xiaomi Communications Co., Ltd. latest update: 2022-01-27 model: 122G

Nine grants have been issued under this FCC ID on 01/27/2022 (this is one of two hundred and seventy-nine releases in 2022 for this grantee). Public details available include frequency information, manuals, and internal & external photos. some products also feature user submitted or linked password defaults, drivers, troubleshooting guides, instructions, & warrantee terms.
permalink for this FCC identifier
search for: Repair details
from iFixIt
Replacement
on Amazon
Trade-in? Recycling locations
eg is reader-supported. when you buy through links on our site, we may earn an affiliate commission.
|
|
|   
eg for Slack usage
app s submitted / available
1 2 3 4 5 6 7 8 9 Users Manual pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Users Manual pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf January 26 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 External Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 ID Label/Location Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 6XD Rpt-1 Test Report pdf 5.56 MiB January 04 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 6XD Rpt-2 Test Report pdf 3.16 MiB January 04 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 6XD Tsup Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 SAR Tsup 6E+PD Test Setup Photos pdf 303.70 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Tuneup--update Parts List/Tune Up Info pdf January 26 2022 confidential
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Attestation Statements pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 BOM Parts List/Tune Up Info pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Block Diagram Block Diagram pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 InPho-1 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 N77 OP Operational Description pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Operational Description Operational Description pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-1 RF Exposure Info pdf 5.51 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-2 RF Exposure Info pdf 5.59 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-3 RF Exposure Info pdf 5.27 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-4 RF Exposure Info pdf 5.28 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-5 RF Exposure Info pdf 2.41 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SCH Schematics pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Software Security Info SDR Software/Security Inf pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 TUNEUP Parts List/Tune Up Info pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Test Setup Photos Test Setup Photos pdf 383.17 KiB January 04 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 op SAR-sensor Operational Description pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 DCD Rpt WPT Test Report pdf 1.22 MiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 DCD Tsup WPT Test Setup Photos pdf 385.58 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 SAR Part1 Rpt WPT v2 RF Exposure Info pdf 437.14 KiB January 17 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 21 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Tsup WPT Test Setup Photos pdf 113.21 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 SAR Tsup WPT v3 Test Setup Photos pdf January 21 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Operational Description--v3 Operational Description pdf January 12 2022 confidential
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 DXX Rpt NFC Test Report pdf 1.13 MiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 InPho 1 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Schematic Schematics pdf December 23 2021 confidential
1 2 3 4 5 6 7 8 9 Tsup DXX Test Setup Photos pdf 422.99 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Co-Location Rpt Test Report pdf 2.30 MiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Co-Location Tsup Test Setup Photos pdf 220.76 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 NII Rpt DFS Test Report pdf 791.28 KiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Rpt WLAN5.8G Test Report pdf 3.69 MiB January 26 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Rpt WLAN5G-1 Test Report pdf 4.99 MiB January 26 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Rpt WLAN5G-2 Test Report pdf 2.73 MiB January 26 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Tsup DFS Test Setup Photos pdf 172.36 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 NII Tsup WLAN5.8G Test Setup Photos pdf 716.80 KiB January 26 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 NII Tsup WLAN5G Test Setup Photos pdf 744.14 KiB January 26 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Tsup JBP Test Setup Photos pdf 198.15 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Users Manual pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Users Manual pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf January 26 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Internal Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 External Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 ID Label/Location Info pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 6XD Rpt-1 Test Report pdf 5.56 MiB January 04 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 6XD Rpt-2 Test Report pdf 3.16 MiB January 04 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Tsup 6E+PD Test Setup Photos pdf 303.70 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Attestation Statements pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-1 RF Exposure Info pdf 5.51 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-2 RF Exposure Info pdf 5.59 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-3 RF Exposure Info pdf 5.27 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-4 RF Exposure Info pdf 5.28 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Rpt 6E+PD-5 RF Exposure Info pdf 2.41 MiB January 05 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Test Setup Photos Test Setup Photos pdf 383.17 KiB January 04 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 DCD Rpt WPT Test Report pdf 1.22 MiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 DCD Tsup WPT Test Setup Photos pdf 385.58 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 SAR Part1 Rpt WPT v2 RF Exposure Info pdf 437.14 KiB January 17 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 SAR Tsup WPT Test Setup Photos pdf 113.21 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 DXX Rpt NFC Test Report pdf 1.13 MiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Cover Letter(s) pdf December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 RF Exposure Info pdf January 12 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 Tsup DXX Test Setup Photos pdf 422.99 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Co-Location Rpt Test Report pdf 2.30 MiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 Co-Location Tsup Test Setup Photos pdf 220.76 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 NII Rpt DFS Test Report pdf 791.28 KiB December 23 2021 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Rpt WLAN5.8G Test Report pdf 3.69 MiB January 26 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Rpt WLAN5G-1 Test Report pdf 4.99 MiB January 26 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Rpt WLAN5G-2 Test Report pdf 2.73 MiB January 26 2022 / January 27 2022
1 2 3 4 5 6 7 8 9 NII Tsup DFS Test Setup Photos pdf 172.36 KiB December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 NII Tsup WLAN5.8G Test Setup Photos pdf 716.80 KiB January 26 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 NII Tsup WLAN5G Test Setup Photos pdf 744.14 KiB January 26 2022 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Test Setup Photos pdf December 23 2021 / July 27 2022 delayed release
1 2 3 4 5 6 7 8 9 Tsup JBP Test Setup Photos pdf 198.15 KiB December 23 2021 / July 27 2022 delayed release

frequency equipment class purpose
1 2022-01-27 5955 ~ 7115 6XD - 15E 6 GHz Low Power Indoor Client Original Equipment
2 0.11 ~ 0.148 DCD - Part 15 Low Power Transmitter Below 1705 kHz
3 13.56 ~ 13.56 DXX - Part 15 Low Power Communication Device Transmitter
4 5745 ~ 5825 NII - Unlicensed National Information Infrastructure TX
5 JBP - Part 15 Class B Computing Device Peripheral
6 3750 ~ 3930 PCE - PCS Licensed Transmitter held to ear
7 3560 ~ 3690 CBE - Citizens Band End User Devices
8 2402 ~ 2480 DSS - Part 15 Spread Spectrum Transmitter
9 2412 ~ 2462 DTS - Digital Transmission System

Application Forms

app s Applicant Information
1 2 3 4 5 6 7 8 9 Effective 2022-01-27
1 2 3 4 5 6 7 8 9 Applicant's complete, legal business name Xiaomi Communications Co., Ltd.
1 2 3 4 5 6 7 8 9 FCC Registration Number (FRN) 0024904948
1 2 3 4 5 6 7 8 9 Physical Address #019, 9th Floor, Building 6, 33 Xi'erqi Middle Road, Haidian District
1 2 3 4 5 6 7 8 9 #019, 9th Floor, Building 6
1 2 3 4 5 6 7 8 9 Beijing, N/A
1 2 3 4 5 6 7 8 9 China
app s TCB Information
1 2 3 4 5 6 7 8 9 TCB Application Email Address b******@phoenix-testlab.de
1 2 3 4 5 6 7 8 9 TCB Scope A4: UNII devices & low power transmitters using spread spectrum techniques
1 2 3 4 5 6 7 8 9 A1: Low Power Transmitters below 1 GHz (except Spread Spectrum), Unintentional Radiators, EAS (Part 11) & Consumer ISM devices
1 2 3 4 5 6 7 8 9 B1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
1 2 3 4 5 6 7 8 9 B2: General Mobile Radio And Broadcast Services equipment in the following 47 CFR Parts 22 (non-cellular) 73, 74, 90, 95, 97, & 101 (all below 3 GHz)
app s FCC ID
1 2 3 4 5 6 7 8 9 Grantee Code 2AFZZ
1 2 3 4 5 6 7 8 9 Equipment Product Code 122G
app s Person at the applicant's address to receive grant or for contact
1 2 3 4 5 6 7 8 9 Name h**** s******
1 2 3 4 5 6 7 8 9 Telephone Number 010 6********
1 2 3 4 5 6 7 8 9 Fax Number 010 6********
1 2 3 4 5 6 7 8 9 E-mail m******@xiaomi.com
app s Technical Contact
n/a
app s Non Technical Contact
n/a
app s Confidentiality (long or short term)
1 2 3 4 5 6 7 8 9 Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 9 Long-Term Confidentiality Does this application include a request for confidentiality for any portion(s) of the data contained in this application pursuant to 47 CFR § 0.459 of the Commission Rules?:Yes
1 2 3 4 5 6 7 8 9 If so, specify the short-term confidentiality release date (MM/DD/YYYY format)07/27/2022
if no date is supplied, the release date will be set to 45 calendar days past the date of grant.
app s Cognitive Radio & Software Defined Radio, Class, etc
1 2 3 4 5 6 7 8 9 Is this application for software defined/cognitive radio authorization?No
1 2 3 4 5 6 7 8 9 Equipment Class6XD - 15E 6 GHz Low Power Indoor Client
1 2 3 4 5 6 7 8 9 DCD - Part 15 Low Power Transmitter Below 1705 kHz
1 2 3 4 5 6 7 8 9 DXX - Part 15 Low Power Communication Device Transmitter
1 2 3 4 5 6 7 8 9 NII - Unlicensed National Information Infrastructure TX
1 2 3 4 5 6 7 8 9 JBP - Part 15 Class B Computing Device Peripheral
1 2 3 4 5 6 7 8 9 PCE - PCS Licensed Transmitter held to ear
1 2 3 4 5 6 7 8 9 CBE - Citizens Band End User Devices
1 2 3 4 5 6 7 8 9 DSS - Part 15 Spread Spectrum Transmitter
1 2 3 4 5 6 7 8 9 DTS - Digital Transmission System
1 2 3 4 5 6 7 8 9 Description of product as it is marketed: (NOTE: This text will appear below the equipment class on the grant)Mobile Phone with GSM, WCDMA, LTE, 5GNR, Bluetooth, WiFi, NFC and Wireless charging
1 2 3 4 5 6 7 8 9 Mobile Phone with GSM, WCDMA, LTE, 5GNR, Bluetooth, WiFi, NFC and Wireless charging
1 2 3 4 5 6 7 8 9 Related OET KnowledgeDataBase Inquiry: Is there a KDB inquiry associated with this application?Yes
1 2 3 4 5 6 7 8 9 Modular Equipment TypeDoes not apply
1 2 3 4 5 6 7 8 9 Purpose / Application is forOriginal Equipment
1 2 3 4 5 6 7 8 9 Composite Equipment: Is the equipment in this application a composite device subject to an additional equipment authorization?Yes
1 2 3 4 5 6 7 8 9 Related Equipment: Is the equipment in this application part of a system that operates with, or is marketed with, another device that requires an equipment authorization?No
1 2 3 4 5 6 7 8 9 Grant CommentsPower Output listed is EIRP. This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.<br> RF Exposure compliance for body-worn operations is limited to the specific configurations tested for this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15mm separation between the device and the user's body. End- users must be informed of the body-worn operating requirements for satisfying RF exposure. Device is a 2 x 2 MIMO configuration, enabled for 6 GHz operations as described in this filing. Device operation is intended for indoor use only. This device supports 20, 40, 80 and 160 MHz BW modes.
1 2 3 4 5 6 7 8 9 This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.
1 2 3 4 5 6 7 8 9 Output power is maximum average conducted.<br> This device supports IEEE 802.11 a/n/ac/ax 20, 40, 80 and 160 MHz channel bandwidths.<br> This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.<br> SAR compliance for body-worn operating configurations is limited to the belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body.<br> The highest reported SAR values for head, body-worn accessory, hotspot and simultaneous transmission use conditions are 0.86 W/kg, 0.29 W/kg, 0.58 W/kg and 1.59 W/kg, respectively. Product specific SAR at 10-gram tissue is 0.64 W/kg.
1 2 3 4 5 6 7 8 9 Output power listed for GSM850, WCDMA Band 5, LTE Band 5/12/13/17/26, 5GNR n5 are maximum ERP. Output power listed for PCS1900, WCDMA Band 2/4, LTE Band 2/4/7/25/38/41/42/66, 5GNR n7/n38/n41/n66/n77/n78 are maximum EIRP.<br> Part 90 for LTE Band 26 is Conducted Power.<br> It supports GSM, WCDMA, LTE (QPSK, 16QAM, 64QAM, 256QAM)<br> 5G NR Standalone and Non-standalone (CP-OFDM QPSK, 16QAM, 64QAM, 256QAM and DFT-s-OFDM PI/2 BPSK, QPSK, 16QAM, 64QAM, 256QAM)<br> LTE B2, B4, B5, B7, B12, B13, B17, B25, B26, B38, B41, B42, B66<br> 5G NR n5, n7, n38, n41, n66, n77, n78<br> Channel Bandwidth (1.4/3/5/10 MHz) for LTE B5, B12<br> Channel Bandwidth (1.4/3/5/10/15 MHz) for LTE B26<br> Channel Bandwidth (1.4/3/5/10/15/20 MHz) for LTE B2, B4, B25, B66<br> Channel Bandwidth (5/10 MHz) for LTE B13, B17<br> Channel Bandwidth (5/10/15/20 MHz) for LTE B7, B38, B41, B42; 5G NR n5<br> Channel Bandwidth (5/10/15/20/25/30/40 MHz) for 5G NR n7<br> Channel Bandwidth (10/15/20/30/40 MHz) for 5G NR n38<br> Channel Bandwidth (20/30/40/50/60/70/80/90/100 MHz) for 5G NR n41<br> Channel Bandwidth (5/10/15/20/30/40 MHz) for 5G NR n66<br> Channel Bandwidth (10/15/20/30/40/50/60/70/80/90/100 MHz) for 5G NR n77, n78<br> It supports LTE Uplink inter-band carrier aggregations CA_4A-7A and carrier Aggregation intra-band contiguous CA_7C, CA_38C, CA_42C as described in this filing.<br> This device contains functions that are not operational in U.S. Territories; this filing is only applicable for U.S. operations.<br> This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.<br> SAR compliance for body-worn operating configurations is limited to the belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR values for Head, body-worn accessory, hotspot and simultaneous transmission use conditions are 1.09 W/kg, 1.05 W/kg, 1.04 W/kg and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 9 Output power listed are maximum EIRP for LTE band 48. EUT supports LTE (QPSK, 16QAM, 64QAM, 256QAM).<br> It supports channel bandwidth 5/10/15/20MHz. <br> This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.<br> SAR compliance for body-worn operating configurations is limited to the belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance. The highest reported SAR values for head, body-worn accessory, hotspot and simultaneous transmission use conditions are 1.05 W/kg, 0.26 W/kg, 0.58 W/kg and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 9 Output power is maximum peak conducted.<br> This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.<br> SAR compliance for body-worn operating configurations is limited to the belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance.<br> The highest reported SAR values for head, body-worn accessory, hotspot and simultaneous transmission use conditions are 0.66 W/kg, &lt;0.10 W/kg, 0.13 W/kg and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 9 Output power is maximum peak conducted power.<br> This device supports IEEE 802.11 ax/b/g/n20/n40 MHz channel bandwidths.<br> This device has integrated DXX, DCD, 6XD, CBE, DSS, DTS, NII and PCE transmitters certified under the same FCC ID.<br> SAR compliance for body-worn operating configurations is limited to the belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15 mm separation between the device and the user's body. End-users must be informed of the body-worn operating requirements for satisfying RF exposure compliance.<br> The highest reported SAR values for head, body-worn accessory, hotspot and simultaneous transmission use conditions are 0.80 W/kg, 0.19 W/kg, 0.11 W/kg and 1.59 W/kg, respectively.
1 2 3 4 5 6 7 8 9 Is there an equipment authorization waiver associated with this application?No
1 2 3 4 5 6 7 8 9 If there is an equipment authorization waiver associated with this application, has the associated waiver been approved and all information uploaded?No
app s Test Firm Name and Contact Information
1 2 3 4 5 6 7 8 9 Firm Name Sporton International Inc. (Kunshan)
1 2 3 4 5 6 7 8 9 Name J******** T********
1 2 3 4 5 6 7 8 9 Telephone Number +86 0********
1 2 3 4 5 6 7 8 9 E-mail J******@sporton.com.tw
Equipment Specifications
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
1 1 15E CC EP MO 5955.00000000 7115.00000000 0.0540000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
2 1 15C CC 0.11000000 0.14800000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
3 1 15C CC 13.56000000 13.56000000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
4 1 15E CC MO 5180 5240 0.1038
4 2 15E CC MO 5250 5250 0.0632
4 3 15E CC MO 5260 5320 0.1197
4 4 15E CC MO 5500 5720 0.0815
4 5 15E CC MO 5745 5825 0.1552
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
5 1 15B CC
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
6 1 22H 824.2 848.8 0.3327 2.5 ppm 240KGXW
6 2 22H 831.5 841.5 0.0516 2.5 ppm 13M5G7D
6 3 22H 831.5 841.5 0.0406 2.5 ppm 13M5W7D
6 4 22H 824.2 848.8 0.0796 2.5 ppm 240KG7W
6 5 22H 826.4 846.6 0.0531 2.5 ppm 4M18F9W
6 6 22H 829 844 0.0505 2.5 ppm 9M05G7D
6 7 22H 829 844 0.0404 2.5 ppm 9M07W7D
6 8 22H 834 839 0.1109 2.5 ppm 19M5G7D
6 9 22H 834 839 0.0914 2.5 ppm 19M4W7D
6 1 24E 1850.2 1909.8 0.8831 2.5 ppm 240KGXW
6 11 24E 1850.2 1909.8 0.3228 2.5 ppm 240KG7W
6 12 24E 1852.4 1907.6 0.2371 2.5 ppm 4M23F9W
6 13 24E 1860 1900 0.2559 2.5 ppm 17M9G7D
6 14 24E 1860 1900 0.2109 2.5 ppm 17M9W7D
6 15 24E 1860 1905 0.2559 2.5 ppm 17M9G7D
6 16 24E 1860 1905 0.2109 2.5 ppm 17M9W7D
6 17 9 821.5 821.5 0.2729 2.5 ppm 15M5G7D
6 18 9 821.5 821.5 0.2138 2.5 ppm 15M5W7D
6 19 9 819 819 0.2742 2.5 ppm 9M89G7D
6 2 9 819 819 0.2193 2.5 ppm 9M91W7D
6 21 27 1712.4 1752.6 0.2018 2.5 ppm 4M17F9W
6 22 27 1720 1745 0.2296 2.5 ppm 18M4G7D
6 23 27 1720 1745 0.1963 2.5 ppm 18M5W7D
6 24 27 1720 1770 0.2296 2.5 ppm 18M4G7D
6 25 27 1720 1770 0.1963 2.5 ppm 18M5W7D
6 26 27 704 711 0.0527 2.5 ppm 8M99G7D
6 27 27 704 711 0.042 2.5 ppm 9M07W7D
6 28 27 782 782 0.0489 2.5 ppm 9M03G7D
6 29 27 782 782 0.0389 2.5 ppm 9M01W7D
6 3 27 709 711 0.0527 2.5 ppm 8M99G7D
6 31 27 709 711 0.042 2.5 ppm 9M07W7D
6 32 27 2510 2560 0.1977 2.5 ppm 18M3G7D
6 33 27 2510 2560 0.1549 2.5 ppm 18M4W7D
6 34 27 2580 2610 0.1954 2.5 ppm 18M3G7D
6 35 27 2580 2610 0.1552 2.5 ppm 18M3W7D
6 36 27 2506 2680 0.1954 2.5 ppm 18M3G7D
6 37 27 2506 2680 0.1552 2.5 ppm 18M3W7D
6 38 27 2510 2560 0.1778 2.5 ppm 37M8G7D
6 39 27 2510 2560 0.1535 2.5 ppm 37M9W7D
6 4 27 2580 2610 0.1849 2.5 ppm 38M0G7D
6 41 27 2580 2610 0.1656 2.5 ppm 37M7W7D
6 42 27 3460 3540 0.1435 2.5 ppm 17M9G7D
6 43 27 3460 3540 0.1156 2.5 ppm 17M8W7D
6 44 27 3460 3540 0.1279 2.5 ppm 37M9G7D
6 45 27 3460 3540 0.1178 2.5 ppm 37M9W7D
6 46 27 2520 2550 0.207 2.5 ppm 38M7G7D
6 47 27 2520 2550 0.1629 2.5 ppm 38M8W7D
6 48 27 2590.02 2599.98 0.1722 2.5 ppm 36M2G7D
6 49 27 2590.02 2599.98 0.139 2.5 ppm 36M2W7D
6 5 27 2546.01 2640 0.1754 2.5 ppm 96M3G7D
6 51 27 2546.01 2640 0.138 2.5 ppm 96M3W7D
6 52 27 1730 1760 0.1742 2.5 ppm 38M8G7D
6 53 27 1730 1760 0.1352 2.5 ppm 38M7W7D
6 54 27 MO 3750 3930 0.2506 2.5 ppm 97M9G7D
6 55 27 MO 3750 3930 0.1778 2.5 ppm 98M3W7D
6 56 27 MO 3750 3750 0.3281 2.5 ppm 98M1G7D
6 57 27 MO 3750 3750 0.2547 2.5 ppm 96M7W7D
6 58 27 MO 3500.01 3500.01 0.354 2.5 ppm 97M3G7D
6 59 27 MO 3500.01 3500.01 0.2972 2.5 ppm 97M3W7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
7 1 96 EP 3560 3690 0.094 2.5 ppm 17M9G7D
7 2 96 EP 3560 3690 0.0782 2.5 ppm 17M9W7D
7 3 96 EP 3557.5 3692.5 0.0944 2.5 ppm 13M5G7D
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
8 1 15C CC 2402.00000000 2480.00000000 0.0481000
Line Rule Parts Grant Notes Lower Frequency Upper Frequency Power Output Tolerance Emission Designator Microprocessor Number
9 1 15C CC 2402 2480 0.0081
9 2 15C CC MO 2412 2462 0.7396

 

some individual PII (Personally Identifiable Information) available on the public forms may be redacted, original source may include additional details

 

  This product uses the FCC Data API but is not endorsed or certified by the FCC